Malaysia

Semuja depot outbreak due to poor SOP adherence: Abang Jo

All detainees should have undergone swab tests, confirmed negative for Covid-19 before being sent to centre

Updated 5 years ago · Published on 22 Mar 2021 11:45PM

Semuja depot outbreak due to poor SOP adherence: Abang Jo
Sarawak Chief Minister Datuk Abang Johari Openg says another block is being built at the Semuja Immigration Depot so detainees can be housed in compliance with physical distancing procedures to avoid the spread of the coronavirus. – Bernama pic, March 22, 2021

SERIAN – Lack of compliance with standard operating procedures (SOPs) in relation to the implementation of Covid-19 screening is one of the reasons 239 Semuja Immigration Depot detainees here were infected, said Sarawak Chief Minister Datuk Abang Johari Openg.

He said all detainees should have undergone a swab test and confirmed to be Covid-19-negative before being sent to the detention centre, but that particular SOP was not complied with, and there were weaknesses in the process.

“Besides that, among other causes of the virus spreading rapidly is the depot itself, as it houses too many detainees, with about 75 people in one block,” he said at a press conference after attending a briefing on detention management by Sarawak Immigration director Datuk Ken Leben here today.

Abang Johari said if there was no Covid-19 virus, putting 75 people in one block would not have been a problem, but in the current pandemic situation, it is difficult to observe physical distancing given the number of detainees.

“Therefore, I have decided to build an additional temporary block to house all detainees for quarantine purposes in the depot,” he said.

He said with the addition of the temporary block, the state Health Department can place 10 detainees under quarantine in one room, compared to the 20-detainee capacity of each room at present.

Currently, 463 detainees housed at the Semuja Immigration Depot cannot be deported due to various issues such as limited flights, border closures, no ticket allocation, no documents, no embassy feedback, and inability to confirm citizenship.

Of this number, 239 detainees have been confirmed positive but no immigration staff were infected.

Also present at the briefing were Deputy Chief Minister Datuk Douglas Uggah Embas, Sarawak police chief Datuk Aidi Ismail, state Health Director Dr Chin Zing Hin, and state prison director Mohamad Rosidek Musa. – Bernama, March 22, 2021

Related News

Malaysia / 1w

Abang Johari hints four incumbents will be retained for Sarawak polls

Malaysia / 2w

Sarawak’s snap polls: A clean sweep for Abang Jo’s GPS?

Education / 2w

Schools to get extra holidays for Deepavali

Malaysia / 3w

Election Commission to meet on Nov 6 to set key dates for Sarawak polls

Malaysia / 3w

Sarawak PRN: PAS almost certain of contesting in 3 DUNs

Malaysia / 3w

Abang Johari urges parties to respect law as Sarawak heads for polls

Spotlight

Malaysia

MB’s resignation: “I was not informed” – Jalaluddin

Malaysia

Ismail’s resignation raises various questions: Work of hidden hands?

Malaysia

Padang Rengas dispute exposes challenge facing possible BN-PN pact

Malaysia

Khalid urges Anwar to reject Anthony Loke’s resignation amid political uncertainty

By Alfian Z.M. Tahir

Malaysia

Zahid: One name submitted for new Negeri MB

Malaysia

Viral abuse video leads to murder charge against couple in father's death

You may be interested

Malaysia

Police shoot dead taxi robber linked to 24 roadside robbery cases in Chow Kit

Malaysia

France offers nuclear energy expertise as Malaysia seeks to accelerate decarbonisation

Malaysia

Ismail’s resignation raises various questions: Work of hidden hands?

Malaysia

MB’s resignation: “I was not informed” – Jalaluddin

Malaysia

Scammers exploit digital banking to recruit uni students as account mules for RM40

Malaysia

RM2.7b submarine cable project to ease Sabah, Sarawak digital connectivity gap

Malaysia

Police officer refrained from firing at machete attacker to protect civilians

Malaysia

Govt faces legal hurdles in axing underperforming Sabah Pan Borneo contractors