Malaysia

Keratong water treatment plant expected to resume operating by Sunday

It was shut down after palm oil mill incident leaked effluent into Sg Pukin, says district officer

Updated 5 years ago · Published on 13 Jul 2021 5:13PM

Keratong water treatment plant expected to resume operating by Sunday
Water samples from the inlets at Kg Rekoh, Kg Lubuk Batu, and Kg Aur have been sent to the Gadak water treatment plant laboratory in Rompin for appropriate action. – Bernama pic, July 13, 2021

KUANTAN – The Keratong water treatment plant in Rompin, which was suspended due to pollution, affecting some 50,000 consumers, is expected to resume operations this Sunday, said Environment and Water Minister Datuk Seri Tuan Ibrahim Tuan Man.

He said Pengurusan Air Pahang Berhad (Paip) had also been continuously monitoring the river’s waters to ensure that the plant can resume operating, while three samples were taken by the district Drainage and Irrigation Department last Sunday.

Water samples from the inlets at Kg Rekoh, Kg Lubuk Batu, and Kg Aur were sent to the Gadak water treatment plant laboratory in Rompin for appropriate action.

“The National Water Services Commission has mobilised water tankers from various water supply operators and agencies to help supply clean water, besides the 10 provided by PAIP, making it a total of 41 tankers.

“Besides that, 300 static tanks have also been placed at strategic locations in the affected areas,” he said in a statement here today.

Tuan Ibrahim said among the parties involved in providing help were Air Selangor, Syarikat Air Negri Sembilan, Syarikat Air Darul Aman, Perak Water Board, the Fire and Rescue Department, army, and Solid Waste and Public Cleansing Management Corporation.

On July 9, Rompin district officer Ahmad Nasim Mohd Sidek confirmed that the pollution in Sg Pukin, Keratong was believed to stem from the collapsed bank of a treatment pond of a palm oil mill in Ulu Keratong that caused the effluent to flow into the river stream.

Tuan Ibrahim said a notice of instruction under Sections 31 and 37 of the Environmental Quality Act (EQA) 1974 was issued to the factory for them to carry out maintenance work at all its effluent treatment ponds.

According to him, the repair and maintenance work is being monitored by the Pahang Environment Department, which has also reportedly temporarily seized the operating equipment at the factory involved.

“The factory needs to get approval from the department before it is allowed to operate again,” he said.

Tuan Ibrahim said the department was currently preparing an investigation paper under Section 16 (1) of EQA 1974, which provides a fine of up to RM25,000 or imprisonment for a maximum of two years, or both, for the breach of each licence condition, upon conviction. – Bernama, July 13, 2021

Related News

3y

S’wak to build new water treatment plants soon to meet surging demand

Malaysia / 3y

Perak moots new treatment plant to overcome drought

Malaysia / 3y

Five water treatment plants in Johor at risk if El Nino stretches to July

Malaysia / 3y

[UPDATED] Two Selangor water treatment plants shut following odour pollution

Malaysia / 4y

PAAB set to build more water treatment plants in Kelantan: minister

Malaysia / 4y

Pahang approves RM920 mil to improve state water infrastructure

Spotlight

Malaysia

Anwar: Children’s smiles, dreams are Malaysia’s future (video)

Heritage

Penang first state to recognise Hungry Ghost Festival, cemeteries as heritage

Malaysia

Child malnutrition needs urgent action, says Charles Santiago

By Alfian Z.M. Tahir

Malaysia

Zahid: Umno, BN favour earlier GE16

World

Trump floats renaming Strait Of Hormuz ‘Trump Strait’ amid Iran conflict

Malaysia

Weak earthquake measuring 3.4 magnitude detected in Keningau

Malaysia

Stepfather held over alleged rape, sexual assault of 13-year-old in Besut

Malaysia

Toying with danger: Police tracking owner of MPV

You may be interested

Malaysia

Serian air pollution hits hazardous level with API reading of 495

Malaysia

Nepal-China flood toll hits 1,280 as 5,624 remain missing

Malaysia

Hannah Yeoh, husband divorce after 18 years of marriage

Malaysia

Reform agenda takes shape as government pushes ahead with wider changes

By The Vibes Says

Malaysia

Zahid: Umno, BN favour earlier GE16

Malaysia

Akmal: Malaysia must future-proof energy security, OGSE industry

Malaysia

Mechanic shot at Penang workshop, jumps cemetery fence to escape gunmen

Malaysia

Indian community will never be marginalised in development agenda – PM Anwar