Malaysia

Only fair for govt to take over maintenance of PPRs, says rep

Low-income earners burdened especially in these trying times, says Rajiv Rishyakaran

Updated 4 years ago · Published on 18 Oct 2021 9:25AM

Only fair for govt to take over maintenance of PPRs, says rep
Rajiv Rishyakaran says public housing maintenance is a structural issue and basic facilities such as lifts, wiring, water pumps, and cleaning services are often neglected until breaking point. – Bernama pic, October 18, 2021

KUALA LUMPUR – Don’t leave residents in public housing to maintain basic facilities, but conduct open tenders to hire maintenance companies for all low-cost housing properties and hold them accountable for the services they render, said DAP’s Bukit Gasing assemblyman Rajiv Rishyakaran.

His suggestion comes after Putrajaya allocated millions to fix amenities in all 67 People’s Housing (PPR) and Public Housing (PA) projects here.

He added that if the government takes over the maintenance of these housing projects, it can ensure that they are clean and safe, and that lifts operate properly at all times. 

“After all, if the government is responsible for cleaning the streets and maintaining water pipes and playgrounds for landed property owners all this while, it is only fair to take care of these basic necessities for low-cost housing residents too.” 

Rajiv drew a comparison with HDB flats in Singapore that are managed by the government and not left to residents.

Rajiv Rishyakaran says many residents in low-cost housing are low-income earners and find it a burden to make monthly maintenance payments, especially now in these trying economic times. – The Vibes pic, October 18, 2021
Rajiv Rishyakaran says many residents in low-cost housing are low-income earners and find it a burden to make monthly maintenance payments, especially now in these trying economic times. – The Vibes pic, October 18, 2021

“(In Malaysia) many residents in low-cost housing are low-income earners and find it a burden to make monthly maintenance payments, especially now in these trying economic times. 

“It is often a chicken-and-egg situation, where those who can afford to pay maintenance do not get the service they deserve and those who can’t or don’t pay still want services rendered to them.

“As a result, management committees often have to deal with very difficult circumstances with regard to the collection of maintenance fees and providing the necessary services,” he said in a statement today.

He added that public housing maintenance is a structural issue and basic facilities such as lifts, wiring, water pumps, and cleaning services are often neglected until breaking point.

“Then the government steps in as a ‘hero’ to fix these problems on an ad-hoc basis. We must not wait until the living conditions in low-cost housing deteriorate and become unsafe before stepping in only when necessary.”

Last Saturday, Prime Minister Datuk Seri Ismail Sabri Yaakob announced that Kuala Lumpur City Hall had been allocated RM127 million for replacement of old lifts at the PPRs and PAs.

He said of the total allocation, RM8.4 million would be channelled to the Seri Perak PA, which has been in existence for 35 years, for the replacement of 14 elevators at seven blocks.

In addition, he said DBKL allocated RM1.8 million for electrical wiring at the housing project. – The Vibes, October 18, 2021

Related News

Malaysia / 9mth

Penang: Over a hundred PPR residents face possible eviction

Malaysia / 1y

Sabah government rules out rent-to-own plan for PPR units, citing need for housing rotation

Malaysia / 2y

Govt needs to clarify status of PJD Link project, says state rep 

Malaysia / 2y

School bus fare hike: federation suggests free system funded by govt

Malaysia / 3y

Light at end of tunnel for better liveability at PPRs: experts

Malaysia / 3y

Sorry, Rajiv: Muda apologises for candidate’s body-shaming remarks

Spotlight

Malaysia

Puteri Umno distances itself from viral Threads post

By Alfian Z.M. Tahir

Malaysia

MACC drops orange detention attire for court remand cases after PM’s call

World

Man jailed six years for keeping Indonesian woman as slave in Melbourne home

Malaysia

Emergency declared in Serian as haze reaches hazardous levels (UPDATED)

Malaysia

Haze in Serian enters emergency phase

Malaysia

Death sentence for deaf, mute man who killed family of four upheld

Malaysia

Retired army officer with Datuk title charged with alleged sexual assault of golf caddie

Heritage

Penang first state to recognise Hungry Ghost Festival, cemeteries as heritage

You may be interested

Malaysia

Emergency declared in Serian as haze reaches hazardous levels (UPDATED)

Malaysia

Heavy rain triggers fresh soap foam on KESAS, motorists mistake it for ‘snow’

Malaysia

E-hailing driver helps save 71-year-old from losing another RM10k in suspected love scam

Malaysia

Felda Co-op members urge PM to intervene in RM400m share redemption crisis

Malaysia

MACC drops orange detention attire for court remand cases after PM’s call

Malaysia

Nepal-China flood toll hits 1,280 as 5,624 remain missing

Malaysia

Nepal rejects foreign rescue teams, accepts aid after deadly disaster

Malaysia

Puteri Umno distances itself from viral Threads post

By Alfian Z.M. Tahir