Malaysia

Sarawak rivers’ widths, depths factor for delays in building bridges: Fadillah

Pakatan Harapan govt’s cancelling of projects further contributed to setbacks in constructing necessary infrastructure

Updated 4 years ago · Published on 12 Dec 2021 9:47PM

Sarawak rivers’ widths, depths factor for delays in building bridges: Fadillah
Efforts to improve connectivity within Sarawak have not only been hampered by the nature of its terrain, with its long, winding rivers, but also failings of previous state governments, says Works Minister Datuk Seri Fadillah Yusof. – Social media pic, December 12, 2021

KUCHING – Factors concerning the width and depth of rivers in Sarawak are one of the reasons why it takes longer to build bridges in the state, said Works Minister Datuk Seri Fadillah Yusof.

According to him, it usually takes about three to five years to build a bridge depending on these two factors, besides other difficulties.

“We know that bridges in Sarawak are not built across small rivers but big rivers, so the three- to five-year period is normal for the construction of such infrastructures,” he told reporters after presenting prizes for the Kenyalang Sepak Takraw League at the Sarawak Sports Corporation Hall in Petra Jaya near here today.

Apart from that, he said, the decision taken by the Pakatan Harapan government in cancelling the bridge projects that had been planned, namely the Batang Igan, Rambungan and Batang Lupar bridges, also contributed to the delays, resulting in the projects having to be taken over and continued by the Sarawak government.

“What is important for me is the commitment at the state government level, under the leadership of Gabungan Parti Sarawak, to continue with these projects because we know how important road links are to connect every part of the state,” said the Parti Pesaka Bumiputera Bersatu senior vice-president.

The Petra Jaya MP said land routes connecting the cities to the rural areas as well as the opening of new areas would provide facilities in terms of travelling while also contributing to the socio-economic development of the people. – Bernama, December 12, 2021

Related News

Malaysia / 2d

Haze in Serian enters emergency phase

Malaysia / 4d

Malaysia Day celebration to move indoors amid Sarawak haze

Malaysia / 6d

Haze: Emergency only in areas with API of 500, not the whole of Sarawak

Malaysia / 6d

Sarawak: EC to display proposed 17 new state assembly seats tomorrow

Malaysia / 1w

Air quality in 4 Sarawak areas hit hazardous levels

Opinion / 1w

Merdeka: This is our Malaysia – and you will not take it from us

Spotlight

Malaysia

MP calls on US to take legal action against Hadi over ‘plot to topple government’ statement

By Ian McIntyre

Malaysia

Malaysia needs to master its own technology - PM Anwar

Malaysia

RM2.48m lost daily to investment fraud syndicates since 2023

Malaysia

Rising bond rates are a sign of rising debt

Education

Selangor to close schools if API readings exceed 200

Malaysia

Loke: Keep Anwar as PM to complete reform agenda

Malaysia

Investigations into political leaders not driven by spite or political payback - PM

You may be interested

Malaysia

ISIS surveillance of top Malaysian policemen: A massive red light on persistent extremism

Malaysia

PM warns fertiliser firms of potential contract cancellations, orders MACC review

Malaysia

Eleven held over revenge machete attack on man in Perak

Malaysia

Sanusi’s gambling stance puts PAS manifesto under scrutiny

By Alfian Z.M. Tahir

Malaysia

HSA warns against interference in sexual harassment probe

Malaysia

Penang’s Air Itam-Tun Dr Lim Chong Eu bypass nearing completion

By Ian McIntyre

Malaysia

Police probe alleged abuse of two-year-old at Mentakab nursery

Malaysia

Investigations into political leaders not driven by spite or political payback - PM