Malaysia

Selangor to replace acquired Malay reserve land based on size and market value, says MB

State government prioritises immediate land replacement for strategic infrastructure projects, in line with post-2016 policy reforms

Updated 1 year ago · Published on 07 Jul 2025 4:35PM

Selangor to replace acquired Malay reserve land based on size and market value, says MB
It is in accordance with both the State and Federal Constitutions - July 7, 2025

SELANGOR Menteri Besar Datuk Seri Amirudin Shari has assured that any Malay Reserve Land acquired by the state for development purposes will be replaced based on both size and current property value, in accordance with constitutional provisions and updated policy guidelines.

He told the Selangor State Legislative Assembly today that since 2016, the state has adhered to a policy of not only replacing acquired reserve land but doing so with greater consideration for value — sometimes providing larger parcels than the original.

“To ensure accurate value in the replacement process, there may occasionally be slight variations — some less, some more — but our policy is generally to offer more,” he said in response to a supplementary question from Datuk Dr Ab Halim Tamuri (PN–Paya Jaras).

“If we take four acres, we may replace it with 4.5 acres, or even up to six or seven acres. This is a common practice as we factor in valuation and development needs to protect Bumiputera interests,” he added. “It is in accordance with both the State and Federal Constitutions.”

Land De-gazetting Reserved for National Projects

Amirudin said land de-gazettement is conducted primarily to facilitate strategic infrastructure or government development projects intended to serve the wider public.

“For example, in the case of the Sungai Rasau Water Treatment Plant, several lots were de-gazetted. The same goes for the West Coast Expressway (WCE) and the East Coast Rail Link (ECRL), which involved multiple railway alignments,” he said.

He also cited the case of Malay Reserve Land in Sungai Way that was reclassified to pave the way for a new industrial zone in a high-potential area.

Replacement Must Now Occur Immediately

According to Amirudin, current policy mandates that any cancellation of Malay Reserve status be accompanied immediately by a replacement process. This shift, in place since 2016, aims to avoid delays in compensating for land lost to development.

“Our administration has committed to ensuring that replacement land is identified and gazetted simultaneously with any de-gazetting exercise,” he said. - July 7, 2025

Spotlight

Malaysia

Anwar receives warm welcome from India’s Grand Mufti at Jamia Markaz

Malaysia

Anwar confirms BrahMos missile system discussed with Modi

Malaysia

Police looking for man who kicked child in viral video (video)

Malaysia

UMNO pressure unlikely to force Anwar into early election

By Alfian Z.M. Tahir

Malaysia

Businesswoman loses RM315,963 in fake projector tender scam

World

Anwar’s Kishore Kumar rendition strikes a chord in India (video)

By Alfian Z.M. Tahir

Malaysia

15-year-old girl dies after fall from Putrajaya apartment

Malaysia

MOF: Nation recovers RM31.3b from 1MDB but still faces RM20b loss

World

A magnitude 5.1 earthquake strikes Japan’s Ryukyu Islands

You may be interested

Malaysia

PKR women’s wing questions Zahid’s stance on political stability

By Alfian Z.M. Tahir

Malaysia

Jamil Khir says RM860M Tabung Haji deal was to lock in hotel rates

Malaysia

Elderly driver allegedly presses accelerator, hits three people while parking

Malaysia

TH RCI probe enters final phase, prosecution decision expected soon

Malaysia

Zahid’s sharp message to Anwar comes at an interesting time

By Alfian Z.M. Tahir

Malaysia

Former minister Jamil Khir claims trial over alleged RM860m TH asset disposal

Malaysia

Second pilot accused of moving drug proceeds in RM45m Jakarta case

Malaysia

MCMC investigates Anthropic's alleged manipulation of Malaysian politics using AI