Malaysia

KL on alert: DBKL mobilises 370 personnel amid monsoon and tropical storm threats

Minister says 15 flood-prone areas under continuous watch as landslip response intensifies in the capital

Updated 10 months ago · Published on 01 Dec 2025 8:27AM

KL on alert: DBKL mobilises 370 personnel amid monsoon and tropical storm threats
Authorities identify 15 locations in Kuala Lumpur that are particularly susceptible to flooding - December 1, 2025

THE Kuala Lumpur City Hall (DBKL) has placed 370 personnel on standby as the capital braces for the effects of the ongoing monsoon season and a tropical storm system flagged by the Malaysian Meteorological Department (MetMalaysia).

Minister in the Prime Minister’s Department (Federal Territories), Datuk Seri Dr Zaliha Mustafa, said authorities have identified 15 locations in Kuala Lumpur that are particularly susceptible to flooding, all of which are now under continuous monitoring.

“In this period of unpredictable weather, we cannot compromise on public safety,” she said in a Facebook statement, following a briefing from DBKL on its readiness measures.

Dr Zaliha later inspected two high-risk sites: a recent ground-settlement area along Jalan Masjid India and a landslip location in Taman United.

“At Jalan Masjid India, I reviewed the ground settlement that occurred recently. I have directed DBKL to conduct a detailed study to prevent a recurrence and to ensure the area remains safe,” she said.

Her visit to Taman United focused on the landslide triggered by heavy rain two weeks earlier.

“Alhamdulillah, immediate action has been taken, including the evacuation of 52 high-risk housing units, and repair works are expected to be completed before the end of December,” she noted.

The Minister urged DBKL and related agencies to act swiftly, coordinate closely and maintain clear communication with affected residents.

In a separate development, DBKL confirmed its readiness to provide transit housing for residents of Pangsapuri Taman United, Seputeh, who were forced to leave their homes after a retaining-wall failure on Monday.

Dr Zaliha said assessments are underway to determine how many residents require temporary accommodation.

“DBKL will identify how many residents need assistance and how many transit units are available. However, residents cannot choose the transit houses as they may not be located within the same area,” she said during her visit to the site.

While some residents have been placed in temporary relief centres, others are staying with relatives. Engineers have already begun a soil-stability assessment to guide the next phase of repair works.

“Construction of a sandbag barrier has been carried out to prevent water from entering the lower-ground units of Block C,” Dr Zaliha explained. “Additionally, cleaning of the ‘weep holes’ in the retaining wall is underway to ensure no water becomes trapped behind the structure, and drains around Blocks B and C are being cleared to maintain smooth water flow and prevent pooling.”

Spotlight

Malaysia

Tuanku Muhriz to focus on state affairs; Will not attend Conference of Rulers meeting

Malaysia

Sarawak projects record RM15.09b revenue, budgets RM10.1b for development in 2027

Malaysia

Sultan Nazrin: Delay in environmental action places future generations at risk

Malaysia

Woman allegedly raped at KL shopping centre after being threatened with intimate video

Malaysia

Jordan’s King confers highest civilian honour on Sultan Ibrahim

Malaysia

Driver monitoring aims to stop commercial vehicle crashes before they happen

Malaysia

KTMB heritage sites set for tourism makeover, says Loke

Malaysia

Zara Qairina’s mother: No doctors recorded injuries consistent with being beaten

You may be interested

Malaysia

No Malaysians killed or injured in Riyadh airport attack, says Wisma Putra

Malaysia

Two 20-year-olds killed in Federal Highway crash

Malaysia

MITI Minister targets import dependence as non-E&E trade surplus narrows to RM12b

Malaysia

Students can express views or criticism without fear of prosecution - PM Anwar

Malaysia

Tuanku Muhriz to focus on state affairs; Will not attend Conference of Rulers meeting

Malaysia

Rantau Panjang MP injured in accident

Malaysia

Sarawak projects record RM15.09b revenue, budgets RM10.1b for development in 2027

Malaysia

Govt misses ambulance response target as only 34.1% of critical cases reached within 15 minutes