THE Malaysian Medical Association (MMA) has urged the Health Ministry to investigate claims that a doctor in Sabah was forced to use a mobile phone flashlight to stitch a patient following a power failure at a hospital.
MMA president Dr Sivanaesan Letchumanan said the allegation, if substantiated, pointed to a serious failure of hospital infrastructure that could put patients at risk.
“No patient should undergo surgery under such conditions, and no doctor should be forced to compromise patient care because essential hospital systems have failed,” he said in a statement.
The allegation was raised by Wangsa Maju MP Zahir Hassan during the Health Ministry’s debate on the Supply Bill 2027 in the Dewan Rakyat on Nov 17.
Zahir told Parliament that a power outage, coupled with a failure of the hospital’s uninterruptible power supply (UPS) system, had left a doctor relying on a mobile phone flashlight to stitch a patient after childbirth.
He also described how the operating theatre’s air-conditioning had stopped working, causing temperatures to rise while the surgeon continued the procedure.
“The air-conditioning stopped working, temperatures began to rise and the surgeon was sweating behind his surgical gown,” he said.
Zahir further claimed that the hospital’s operating theatres had been forced to close in September 2025 following a water supply disruption.
Responding to the allegations, Sivanaesan called on the ministry to investigate the incident and conduct a nationwide audit of critical hospital infrastructure, particularly in operating theatres, intensive care units (ICUs) and maternity wards.
“Repeated failures of air-conditioning systems, electricity and water supply disruptions, as well as reported failures of backup power systems, are deeply concerning.
“These are not minor maintenance issues. They can directly affect patient safety, infection control and the timely delivery of medical care,” he added.
He said hospitals experiencing such failures should be given priority for immediate repairs, adding that doctors should not have to rely on improvisation to compensate for inadequate facilities.
“Healthcare workers must be equipped with safe and reliable facilities to deliver the standard of care every Malaysian deserves,” he explained further.
During the debate, Zahir also said a hospital staff member had informed him that the operating theatre’s air-conditioning system broke down almost every month, disrupting procedures and forcing scheduled surgeries to be postponed or cancelled.
The PKR lawmaker called for an immediate assessment of backup power and cooling systems in operating theatres, ICUs and maternity wards nationwide, with particular attention to hospitals in Sabah and Sarawak.
He proposed that part of the RM429.5 million allocation for hospital renovations, upgrades and repairs be used to replace ageing UPS batteries, air-conditioning systems and other critical power infrastructure, including at Duchess of Kent Hospital.
He also urged the ministry to provide Parliament with regular updates on the progress of repairs and upgrades to critical hospital facilities. - November 19, 2026