Malaysia

Safety precautions for Tembok Laut Padang Kota Lama construction: Penang City Council

Following May 16 incident, the construction site will increase security and monitoring to ensure no weather incidents

Updated 4 years ago · Published on 18 May 2022 1:17PM

Safety precautions for Tembok Laut Padang Kota Lama construction: Penang City Council
The Tembok Laut Padang Kota Lama project costs RM12.9 mil and is an initiative to upgrade and preserve the area. – Bernama pic, May 18, 2022

GEORGE TOWN – The Penang City Council has taken into account the safety aspects in the construction of the breakwater and promenade at the Tembok Laut Padang Kota Lama here including the lower terrace promenade, which was closed when the high tide occurred last May 16.

The city council mayor Datuk Yew Tung Seang said apart from that, the lower terrace promenade was specifically designed to allow seawater to pass through the area as an attraction to the public, with measures taken to ensure it did not pose a danger to the public.

“The city council wishes to emphasise that the project also takes into account elements of heritage conservation, which is important for George Town as a Unesco World Heritage Site.

“The council also installed closed-circuit television cameras in the area to monitor visitors and seawater conditions.

“We also have a gate at the entrance to the lower terrace promenade and the access gate is closed from 9pm to 7am every day and it will also be closed in the event of unpredictable and severe weather conditions such as thunderstorms and strong winds,” he told reporters after inspecting the area here today.

Yew visited the area today following the incident on May 16 when the area was submerged in seawater, and this sparked public controversy over safety issues there.

According to Yew, the incident at the lower terrace promenade is expected, especially during the spring tide and high tide, like what happened last Monday and yesterday.

So, there is no issue of design defects, he said.

“The preparation and implementation of the construction of the lower terrace, weather, tidal phenomena and other factors have been taken into account and considered carefully before work on the project was carried out,” he added.

He said the lower terrace promenade was also built to preserve the historical heritage features on the wall that was originally built in the 1800s.

The project, which cost RM12.9 million, is an initiative to upgrade the area to provide quality public space that is acceptable, attractive and inclusive for all parties. It included the 570-metre long promenade from Medan Selera Renong to the Royal Malaysian Navy base. – Bernama, May 18, 2022

Related News

Malaysia / 1d

Kedah may delay Penang lease claim documents till change of federal government

Malaysia / 1d

Guan Eng questions Penang PH's stance on UMNO

Community / 2d

Penang's first integrated senior living resort to be ready next year

Malaysia / 2d

Trio escape with minor injuries after tree crashes on their car

Malaysia / 3d

Penang: PH - Umno cooperation to be maintained in state government

Malaysia / 4d

Penang PH to meet over Umno cooperation in the state

Spotlight

Malaysia

Sarawak schools told to halt outdoor activities as haze pushes air quality into unhealthy range

World

Indonesia haze forces schools to close as wildfires intensify amid severe dry season

Malaysia

PN walkout over Tabung Haji debate a political misstep, says analyst

By Alfian Z.M. Tahir

Malaysia

51 witnesses to testify at inquest into death of 10-year-old boy found unconscious in school toilet

Malaysia

Female student arrested for allegedly hurting classmate with kerambit at school

World

Colombia quake death toll hits 111 as rescue teams race to find survivors

World

Trump secretly switched to third aircraft in Türkiye over Iran assassination threat

Malaysia

Anwar questions PN’s priorities after Tabung Haji RCI walkout

Malaysia

MACC, police probing TH after RCI findings as govt warns no one will be spared

By Alfian Z.M. Tahir

You may be interested

Malaysia

Tabung Haji RCI report takes centre stage at special Dewan sitting tomorrow

Malaysia

Delivery rider’s birthday gesture leaves young boy smiling (video)

Malaysia

Haze: Putrajaya, Cheras record unhealthy API this morning

Malaysia

Sabah and Sarawak can become 'kingmakers', determine who will lead Federal government

Malaysia

Anwar recovers from surgery, misses Tabung Haji RCI parliamentary debate

Malaysia

Grandmother charged with murdering step-granddaughter

Malaysia

Malaysian dies while transiting in Bangkok to Japan (video)

Malaysia

Four slaps, lasting trauma: Retired teacher ordered to pay RM88k