Business

‘Prefab, prefinished construction can reduce reliance on migrant workers’

Method reduces work onsite by up to 80%, notes minister

Updated 3 years ago · Published on 07 Jun 2023 5:49PM

‘Prefab, prefinished construction can reduce reliance on migrant workers’
Datuk Seri Alexander Nanta Linggi says Malaysia needs about 400,000 construction workers and still depends on migrant labour because the work environment is not very preferred by the locals. – ABDUL RAZAK LATIF

KUALA LUMPUR – The prefabricated prefinished volumetric construction (PPVC) method can help reduce the country’s dependence on migrant workers in the construction industry, said Works Minister Datuk Seri Alexander Nanta Linggi.

He said the method could also attract youth in this country to be trained to become skilled workers, due to the more comfortable work environment.

“I was made to understand that local workers prefer this work environment or atmosphere because it is not like a conventional job that requires them to work under the hot sun or outside, which is quite uncomfortable.”

He said this to reporters after witnessing the memorandum of understanding signing ceremony between the Construction Industry Development Board and Malaysian Resources Corporation Bhd (MRCB) here today.

PPVC is a method where 3D modules are assembled complete with internal finishing in the factory before being delivered and installed on-site, which can reduce 70% to 80% of construction work.

According to Nanta, Malaysia needs about 400,000 construction workers and still depends on migrant labour because the work environment is not very preferred by the locals.

Meanwhile, MRCB executive vice-president Datuk Seri Judin Abdul Karim said the PPVC method is considered more advanced than the industrialised building system (IBS).

“IBS is a 2D prefabricated panel and box system that is assembled on a construction site with the aim of reducing up to 30% of the work on site.

“Meanwhile, PPVC transports complete 3D modules to be installed on-site and can reduce 70% to 80% of construction work,” he said. – Bernama, June 7, 2023

Related News

Malaysia / 2y

Highway concessionaires hold absolute rights to toll collection, says minister

Malaysia / 2y

Prioritise our poor: Nanta backs calls to bar Palestinian refugees from Sarawak

Malaysia / 2y

Putrajaya gives nod to S’wak-Sabah-Kalimantan mega-railway project

Malaysia / 3y

Thousands of S’wak natives cut off from outside world as sole link collapses

Malaysia / 3y

King, queen inspect Pan Borneo Highway progress in Sabah

Malaysia / 3y

We’ll stick with M’sian currency: S’wak premier after Nanta’s remarks

Spotlight

Malaysia

Haze: Schools in Johor, Melaka, and Negeri Sembilan to close tomorrow

Malaysia

Tun Mahathir’s health improves, but not ready to leave hospital

Malaysia

LPT3 row puts Kelantan’s infrastructure priorities under scrutiny

Malaysia

Terengganu royal family member sues two banks over RM1.99m missing from savings

Malaysia

Irene Sofiya murder probe referred to Johor prosecutors for review

Malaysia

Teacher denies negligence charges over fatal school SUV crash in Kota Bharu

Malaysia

Sulaiman Md Ali opts out of Melaka polls, will not defend Lendu

You may be interested

Business

Oil prices stay above US$93 as Middle East tensions put pressure on ringgit

Business

SC targets stronger board oversight through higher standards for company secretaries

Business

Oil prices rise as Gulf attacks threaten supply recovery