Malaysia

Penang CM shoots down talk that Penang Undersea Tunnel Project abandoned

Chow Kon Yeow said the state government has never announced the cancellation of the mega project under the Penang Transport Master Plan (PTMP) since it was proposed in 2011.

Updated 8 months ago · Published on 14 Nov 2025 11:11AM

Penang CM shoots down talk that Penang Undersea Tunnel Project abandoned
Chow stressed that the project was not stopped or abandoned but rather continued to be classified as an active project at the state level. - November 14, 2025

THE Penang Undersea Tunnel Project is not an abandoned project but is still active and in the technical review and design completion phase.

Chief Minister Chow Kon Yeow said the state government has never announced the cancellation of the mega project under the Penang Transport Master Plan (PTMP) since it was proposed in 2011.

According to him, although the issue has been raised frequently, the state government continues to receive the latest presentations from relevant companies to examine the best measures to address various technical issues involving the project.

"The tunnel project was never announced as a non-implementation project, and we never said it would be cancelled. It is still under discussion and even last week, we were still discussing the project in the recent Exco Meeting.

"Among the main issues being refined include the need to ensure that the proposed replacement bridge does not affect the operations of Penang Port as well as the height of the structure due to its location near the Butterworth RMAF Air Base.

"All these are technical issues that are still in the refinement stage. According to the agreement, the study work is also not completed, and they will not proceed until all parties are satisfied with the alignment design, financial arrangements and other aspects," he said.

He said this when answering an oral question from Azmi Alang (Bersatu-Telok Ayer Tawar) regarding the status of the Penang Undersea Tunnel Project.

Chow also stressed that the project was not stopped or abandoned but rather continued to be classified as an active project at the state level.

Commenting on the views of Teh Lai Heng (DAP-Komtar), he welcomed the statement on the need for an optimistic attitude in driving state development.

“I invite Yang Berhormat Teluk Air Tawar to join me on this positive journey so that Teluk Air Tawar, Tasek Gelugor and the whole of Penang can enjoy positive changes and transformations for future generations,” he said.

The 6.5-kilometre undersea tunnel project and three main roads is one of the projects included in the PTMP, which is worth a total of RM46 billion.

The undersea tunnel is part of a project package worth RM6.3 billion.

It is proposed as a third link between the island and the mainland to reduce congestion on the Penang Bridge. – November 14, 2025

Related News

Tech / 1d

Penang’s Tech Dome celebrates 10th anniversary with opening of new space gallery

Malaysia / 4d

No further delays for water tariff hike in Penang - CM

People / 5d

Penang: Greater efforts needed to record historical events, says nonagenarian

People / 5d

Penang: Eurasian association mourns sudden loss of its president

Malaysia / 5d

Penang signs landmark Perak water deal to secure 40-year supply from 2032

Malaysia / 6d

Penang: Sandbags as temporary measure to curb erosion at Batu Ferringhi

Spotlight

Malaysia

After Johor, the uncomfortable question for Anwar’s critics: Were we too impatient?

By The Vibes Says

Malaysia

Network School's business licences revoked, to cease operations tomorrow

Opinion

Orang Asli in Pahang: Token gestures or genuine recognition?

Malaysia

Tuition teacher sentenced to 105 years in prison and 70 lashes for raping daughter

Malaysia

Azam Baki denies involvement in RM178.29 million contract linked to brother’s company

Malaysia

Aminuddin urges NS voters to weigh manifesto promising benefits for M40 and B40 groups

Malaysia

No need to resign, PM has absolute power if there is doubt – Ahmad Zahid

World

Gaza’s water crisis deepens as families face thirst, disease and collapsing sanitation systems

You may be interested

Malaysia

Immigration tracks 19 Network School foreign nationals who 'vanished' from official records

Malaysia

AGC orders inquest into deaths of three men in Durian Tunggal police shooting

Malaysia

Network School's business licences revoked, to cease operations tomorrow

Malaysia

Tengku Ampuan Pahang offers land to Orang Asli families affected by Sungai Cot land dispute

Malaysia

MINDEF to install radar on Layang-Layang Island to strengthen South China Sea surveillance

Malaysia

Malaysia faces record heat risk in 2027 as El Niño expected to intensify

Malaysia

Three killed after lorry crashes into parked trailer on East-West Highway

Malaysia

Armed robber fails to steal RM82,000 from security van after guard’s quick action