Malaysia

Sabah roads, flyover crack, collapse from continuous rain

Deputy chief minister urges caution to motorists, asks them to use alternative routes

Updated 5 years ago · Published on 17 Jan 2021 6:16PM

Sabah roads, flyover crack, collapse from continuous rain
Damaged roads include the Kota Kinabalu-Tambunan road in Kg Tudan, Penampang, and another one from Maang, also in Penampang, to Lok Kawi. – Public Works Department pic, January 17, 2021

KOTA KINABALU – Motorists in Sabah have been urged to be careful due to the continuous heavy rain since yesterday which has caused several roads in the state to be flooded and damaged, some even completely collapsing.

Deputy Chief Minister Datuk Seri Bung Moktar Radin said most of the collapsed roads were in hilly areas now impassable by vehicles.

He noted the serious collapse of the Kota Kinabalu-Tambunan road in Kg Tudan, Penampang, and another one from Maang, also in Penampang, to Lok Kawi.

"We have asked the Public Works Department and also the concession company which maintains the roads to monitor and install warning signs for the safety of road users," he said in a statement today.

Bung, who is also the state works minister, said this when commenting on several landslides and damages due to continuous heavy rains since yesterday afternoon.

He asked road users to use alternative roads to their intended destinations to ensure their safety.

“Road users should always get information from the Public Works Department. I also thank the netizens who uploaded this issue on social media and through WhatsApp sent directly to me,” he said.

He added that repair works would be started as soon as possible.

On a crack on a flyover in Luyang, Bung said the structure’s consulting engineer was informed about the matter and the Public Works Department is now waiting for a decision for follow-up action.

“There are different solutions as there is an Irrigation and Drainage Department drain under it,” he said.

He said that as a temporary measure, the Public Works Department will place cement in the cracked area while its state director holds a technical meeting as soon as the report on the damage is obtained. – The Vibes, January 17, 2021

Related News

Opinion / 1mth

The Malaysia Agreement 1963: Grievances and expectations in Sabah and Sarawak

Malaysia / 1mth

Budget 2027: Sabah, Sarawak to receive RM34.9b in federal allocations next year

Events / 1mth

Sarawak and Sabah play key roles in weathering climate change

Malaysia / 1mth

Address security concerns and let concert proceed – former Sabah CM

Malaysia / 2mth

A message from our publisher and chairman

Malaysia / 2mth

Sabah leaders condemn priest and nun joke at UMNO PAU

Spotlight

Malaysia

Khalid urges PAS to ditch Umno alliance and support Anwar

By Alfian Z.M. Tahir

Malaysia

Najib’s house arrest: Govt, AG, Hannah opposed conditional pardon, minutes show

Malaysia

Former Negeri Sembilan exco members end legal fight over removal

Business

Nvidia rules out Jensen Huang comeback as quarterly revenue doubles to US$115b

Malaysia

Indonesia should compensate Malaysians for the prolonged haze – Guan Eng

By Ian McIntyre

Malaysia

Padang Rengas dispute exposes challenge facing possible BN-PN pact

You may be interested

Malaysia

Floods displace 2,527 people across four states, 23 relief centres opened

Malaysia

Government collects RM377m in vape excise duties since May 2023

Malaysia

Scams: Teacher and retiree lose over RM1m in two separate incidents

Malaysia

Two of five Malaysians held in Thailand over 240kg meth haul have prior drug convictions

Malaysia

Unidentified body found at Pandan Jaya LRT station, police appeal for public help

Malaysia

Ahmad Maslan urged to quit Cabinet over controversial Dewan Rakyat pantun

Malaysia

Businessman urges MPOB to provide details of palm oil mixing probe

Malaysia

36 foreigners held in Kuantan raids on love scam call centres targeting Vietnam