Malaysia

Rail project cancellation, MCO, politicking a blow to construction sector

Expected recovery in first half of 2021 unlikely to materialise, analyst says

Updated 5 years ago · Published on 18 Jan 2021 2:41PM

Rail project cancellation, MCO, politicking a blow to construction sector
Putrajaya has allocated RM37 billion this year for infrastructure initiatives. – The Vibes file pic, January 18, 2021

by Azril Annuar

KUALA LUMPUR – The construction sector is expected to be muted following the cancellation of the Kuala Lumpur-Singapore High-Speed Rail (HSR) project, as well as cost-cutting measures for the Mass Rapid Transit Line 3 (MRT3), said CGS-CIMB.

Sharizan Rosely, an analyst with the investment bank, in a note today said these developments, coupled with the reinstatement of the movement control order (MCO) and proclamation of emergency, have dampened expectations of a recovery in the first half of the year (1H21F).

“Funding and viability aspects aside, the government’s new plan to roll out an alternative (shorter) HSR project that is 30% cheaper than the original RM60 billion cost (excluding rolling stock and systems), and which will start two years earlier (likely in 2022, by our estimates), remains unchanged.

“We also recently gathered that the new MRT3 proposal may see up to a 40% cut in its total original cost of RM45 billion, on the removal of certain underground scopes.

“Our estimated RM63 billion to RM74 billion in combined potential civil works (versus the original estimate of RM105 billion) is a huge catalyst for the job outlook, but our reservations about the MRT3 and new HSR projects lie in the timing risks/uncertainties brought about by the political landscape, which could remain in a state of flux till 2H21F.”

However, CGS-CIMB acknowledged potential “silver linings” in the first half of the year, such as the announcement on the 12th Malaysia Plan, new tenders for water contracts in Selangor, approval of the revised MRT3, new details for the Kuala Lumpur-Johor Baru HSR, and fresh public-private partnership contracts.

Downside risks, said Sharizan, include funding limitations for mega projects, politics, and delays in Budget 2021 projects due to the MCO.

Putrajaya has allocated RM37 billion this year for infrastructure initiatives. – The Vibes, January 18, 2021

Related News

Malaysia / 5mth

163 unauthorised non-Muslim places of worship identified on public land in KL – Hannah Yeoh

Malaysia / 8mth

Anwar reminds all parties to stick to the laws when preaching, building houses of worship

Malaysia / 1y

Penangites told to brace for ‘higher congestion rate’ as LRT project begins

Malaysia / 1y

Guan Eng urges MOF to suspend SST on construction sales, commercial property rentals

Culture / 1y

Penang Hospital undergoing major upgrades to provide better services

Malaysia / 1y

Sabah - Sarawak Highway set to be socio-economic game changer 

Spotlight

World

Kim Jong Un appears in state media photos after unverified death rumours

Malaysia

Anwar challenges Rafizi over corporate crime, asks why he stayed silent as minister

Malaysia

AKPS chief Mohd Shuhaily to be charged over alleged assault on two policemen

Malaysia

Year One pupil dies after breathing difficulties in Dengkil classroom

Malaysia

College student remanded for three days over alleged rape of underage girl

Sports & Fitness

Lee Zii Jia settles dispute with father, sister over company affairs

By Alfian Z.M. Tahir

Malaysia

Online scam call centres: Police detain 31 people targeting foreign victims in Pahang crackdown

Malaysia

Guan Eng proposes RM1,000 tax rebate for purchase of air purifiers

By Ian McIntyre

You may be interested

Malaysia

MCMC warns cyberbullies, AI disinformation offenders as online safety comes under scrutiny

Malaysia

Govt plans tougher penalties for cable theft as rail operators explore CCTV

Malaysia

Haze spreads as 29 areas hit unhealthy air levels, raising health concerns

Malaysia

Takiyuddin’s use of ‘munafik’ sparks Dewan Rakyat row

Malaysia

Husband of slain border agency officer has 16 previous criminal records

Malaysia

Budget 2027 expands tax relief, fuel and electricity subsidies for M40 households

Malaysia

MCMC seizes phone in probe into Threads post on Negeri Sembilan ruler

Malaysia

Data centres to need 8,391MW of power by 2030, Johor accounts for over half