Malaysia

Family of man killed by uprooted tree have every right to sue: Penang exco

This could spur state to better ensure public’s safety, says Jagdeep Singh Deo

Updated 5 years ago · Published on 29 Apr 2021 12:54PM

Family of man killed by uprooted tree have every right to sue: Penang exco
In the fatal incident on Tuesday, a giant angsana tree crushed the roof of a car, killing the driver, after it was uprooted during a downpour in George Town. – Social media pic, April 29, 2021

by Arulldas Sinnappan

GEORGE TOWN – State Housing and Local Government Committee chairman Jagdeep Singh Deo said the family of a victim who died after a tree fell on his car can go ahead with legal action as they are entitled to do so under the law.  

He said the legal action against the relevant authorities and the state would require them to deal with the issue.

“However, asking the Datuk Bandar to resign from the post is uncalled for. The tree was replanted when the arborist issued the certificate.

“That is why we are investigating this case and we are monitoring every replanted tree now.

“Investigations ongoing to establish the cause of the incident and the report will be submitted to the state government once it is completed; we cannot assume that every other tree is the same,” he said.

Penang exco Jagdeep Singh Deo says while the family can take legal action against the state authorities, calling for the Datuk Bandar to resign from the post is uncalled for. – Wikipedia pic, April 29, 2021
Penang exco Jagdeep Singh Deo says while the family can take legal action against the state authorities, calling for the Datuk Bandar to resign from the post is uncalled for. – Wikipedia pic, April 29, 2021

In the fatal incident on Tuesday, a giant angsana tree crushed the roof of a car, killing the driver, after it was uprooted during a downpour here. 

Jagdeep said this during the handing over of food items to 1,000 Penang Island City Council (MBPP) and Seberang Prai City Council (MBSP) staff at the Town Hall building here today.

Present were MBPP secretary Datuk Addnan Mohd Razali and MBSP mayor Datuk Rozali Mohamud.

“We have instructed both city council mayors to be cautious and monitor the replanting of trees and make sure all trees are safe because the safety of the people are of utmost importance,” Jagdeep said.

On another note, Jagdeep said, out of 5,200 staff members from the two city councils, only 1,493 have been vaccinated. 

He said he has raised the matter with the Health Ministry as there are 2,400 frontliners in both councils who face a higher risk of contracting Covid-19 as they go out to the field.

He also commended MBPP and MPSP staff for working tirelessly to break the chain of Covid-19 transmissions.

The falling tree may reflect lack of knowledge about the replanting process on the part of the contractors, says one expert. – Social media pic, April 29, 2021
The falling tree may reflect lack of knowledge about the replanting process on the part of the contractors, says one expert. – Social media pic, April 29, 2021

Replanting procedures adhered to? 

Meanwhile, adviser of the Malaysian Nature Society's Penang chapter Kanda Kumar questioned if proper procedures are being followed in removing and replanting trees.

He said he was saddened over the incident that had claimed a life.

He said the falling tree may reflect lack of knowledge about the replanting process on the part of the contractors.

“There are thousands of trees replanted all over the world and there has hardly been such an incident. Why did it happen here?” he said. 

“It is not just dig-and-plant process. There are procedures to follow in the tree-replanting process.”

Kanda said a qualified arborist or botanist must be appointed to oversee the process, and contractors should not be allowed to undertake such a task without their presence.

“The experts will study the condition of the soil and root strength of the tree they want to remove,” he said.

“They will also study of the condition of the soil for about two weeks before replanting the tree there. It is not dig-and-remove today and dig-and-replant tomorrow.” – The Vibes, April 29, 2021

Related News

Culture / 1h

Penang: Three refurbished tourism attractions to be ‘reopened’ soon

Off beat / 21h

Penang targets 100% digital payment adoption rate

Tech / 3d

Penang’s Tech Dome celebrates 10th anniversary with opening of new space gallery

Malaysia / 5d

No further delays for water tariff hike in Penang - CM

People / 6d

Penang: Greater efforts needed to record historical events, says nonagenarian

People / 6d

Penang: Eurasian association mourns sudden loss of its president

Spotlight

Malaysia

Anwar, Zahid project unity at Putrajaya amid PH-BN differences during state polls

By Alfian Z.M. Tahir

Malaysia

Police looking for two robbery suspects who kicked elderly woman (video)

Malaysia

Malaysia will not bow to US congressional pressure over Israeli nationals’ issue - Loke (UPDATED)

Malaysia

Deaf e-hailing driver sues government, police over alleged assault, seeks disability access reforms

By Alfian Z.M. Tahir

Malaysia

Johor appoints 10 deputy exco to strengthen administration

Malaysia

Suspended police corporal charged with sexual assault of 11-year-old daughter

Malaysia

Magnitude 5.7 earthquake off northern Sumatra felt across west coast of Peninsular Malaysia

World

Trump approves potential US-Saudi nuclear deal allowing uranium enrichment capability

Malaysia

Network School moves to Kazakhstan

You may be interested

Malaysia

Network School moves to Kazakhstan

Malaysia

Hajiji withdraws remark against Kapayan rep following request in Sabah assembly

Malaysia

Two-year-old girl killed after being hit by lorry driven by grandfather in Kedah

Malaysia

BN-PN alliance could secure 25 seats in Negeri Sembilan - Ahmad Maslan

Malaysia

International drug syndicates exploit last-minute airport check-ins to slip mules through security

Malaysia

Pemudah tightens action against illegal foreign business activities

Malaysia

Sabah seeks additional RM1.61b allocation to fund state operations and development needs

Malaysia

Govt embarks on RM1.49B flood mitigation projects in Sabah as high-risk areas receive priority