Malaysia

Pakatan not responsible for LCS project delay: Mat Sabu

Former defence minister slams Datuk Seri Ismail Sabri Yaakob for shifting blame to previous govt

Updated 5 years ago · Published on 12 May 2021 6:06PM

Pakatan not responsible for LCS project delay: Mat Sabu
Mohamad Sabu says the delay in the littoral combat ship project dates back to 2015 and is due to the project’s detailed design, which until today has not been finalised. – File pic, May 12, 2021

KUALA LUMPUR – Former defence minister Mohamad Sabu slammed current minister Datuk Seri Ismail Sabri Yaakob for blaming Pakatan Harapan’s rule from May 2018 to February 2020 for the delay in finding a solution to the country’s littoral combat ship (LCS) project delay. 

In a joint statement with his former deputy Liew Chin Tong today, Mohamad took Ismail Sabri to task for his notion that an investigation under the PH administration had caused the project’s delay.

They said it was inaccurate, reflecting the current Perikatan Nasional government's lack of integrity.

They also claimed that Ismail Sabri’s statement on the matter is now no longer available on the Defence Ministry's website.

They said that the PH government had formed the Governance, Procurement, and Finance Investigation Committee headed by Tan Sri Amrin Buang to investigate issues with regards to defence procurement, as directed by the cabinet.

Both men called on Ismail Sabri to publish all details of the committee’s findings on the LCS project for the people to judge and evaluate.

“PH administered the country for 22 months while PN has been in charge for the last 15 months.

“Any delays encountered by the project are due to the inefficiency and lack of integrity of the (previous) Umno-Barisan Nasional government itself. 

“The delay dates back to 2015 and is due to the project’s detailed design, which until today has not been finalised, as well as Boustead Naval Shipyard Sdn Bhd’s (BNS) financial liquidity problems, which to some extent resulted from the project’s financial irregularities and inefficient management,” they claimed.

“The committee’s investigation also found among others that the LCS project started as a project proposed by a vendor, and not the consumer Royal Malaysian Navy (TLDM). 

Mohamad and Liew Chin Tong have called on Datuk Seri Ismail Sabri Yaakob to publish all details of the committee’s findings on the littoral combat ship project for the people to judge and evaluate. – File pic, May 12, 2021
Mohamad and Liew Chin Tong have called on Datuk Seri Ismail Sabri Yaakob to publish all details of the committee’s findings on the littoral combat ship project for the people to judge and evaluate. – File pic, May 12, 2021

“At the time, TLDM proposed the procurement of the Sigma design made by Damen Shipyard from the Netherlands, which had continuity with the procurement of other TLDM ships, but (former prime minister) Datuk Seri Najib Razak’s government still chose the Gowind ship design, made by DCNS Naval Group from France.”

They added that the committee’s investigation also found that RM1 billion from the RM6 billion channelled to the builders had disappeared and could no longer be traced, and that it was suspected that elements of corruption had taken place. 

“Issues of the project being ‘vendor-driven’ and of corruption and malpractice in the LCS project occurred when Najib, Datuk Seri Ahmad Zahid Hamidi, and Datuk Seri Hishamuddin Hussein were defence ministers under the former Umno-BN administration,” they said.

“PH was just trying to clean up and improve the situation,” they claimed.

The investigations, they added, also suggested that the project be continued with the interest of TLDM as the foremost consideration, whereby strict conditions would be imposed so that there would be no more irregularities, and that an investigation into the loss of RM 1billion be carried out immediately.

They added that the proposals were accepted by the Defence Ministry and also PH’s prime minister Tun Dr Mahathir Mohamad on February 11, 2020.  

“The cabinet was scheduled to discuss and make the next final decision. Unfortunately, the Sheraton Move took place on February 23, 2020. Ismail Sabri has held the post of defence minister for the past 15 months,” they said.

Questions for Ismail Sabri

Mohamad and Liew asked the PN government and its Umno minister to answer several questions.

“How much funds will be injected to make this project a success? Some say RM3 billion is needed. Is the government still adamant that new funds will not be channelled?” they asked.

“How many ships can be completed ? Ismail Sabri himself said there may be only two. If there are only two ships, questions will arise about TLDM’s capabilities soon.”

They also stressed that the project completion schedule must be informed to the people. 

“We understand that the detailed design of the ship has not yet been accepted by the ‘design authority’. This means that the progress of the ship cannot continue to completion because there is no plan to allow the installation of electronic equipment to the hull.”

They concluded that while the PH government had not barred BNS from proceeding with the LCS project, guaranteeing the interests of TLDM should be made key consideration. – May 12, 2021

Related News

Malaysia / 1mth

MPs propose government set up RCI to investigate LCS project delays

Malaysia / 1mth

LCS delays revive questions over warnings raised by former navy chief

Malaysia / 1mth

LCS project delayed by 7.55 per cent; Guan Eng again questions Zahid's role

Business / 2mth

Malaysia must give investors clearer exits to unlock ASEAN capital

Malaysia / 4mth

Don't repeat old mistakes, five ships must be completed according to cost and schedule – PAC

Malaysia / 4mth

'Mat Sabu was only expressing his views; There was no sarcasm’  - Anwar

Spotlight

Malaysia

Bersama, Bersatu fail to win a seat in Melaka, face questions over political future

By Alfian Z.M. Tahir

Malaysia

African man apologises to Malaysians over machete attack on policeman

Malaysia

Two family members to be charged with murder of elderly man in Negeri Sembilan

Malaysia

Kuching student accused of attacking teacher with a deadly weapon sent for mental observation

People

Hans Isaac engaged to former Miss Universe Malaysia Francisca Luhong in Paris proposal

Malaysia

NS Exco: Palace weighs settlement proposals as court hearing postponed

Malaysia

Police hunt answers after 15-year-old girl shot in neck in Ranau

Malaysia

Missing 74-year-old windsurfer found dead off Tanjung Bungah

You may be interested

Malaysia

125ZR gathering participant killed in Port Dickson crash

Malaysia

Two die after being trapped in vehicles in Desaru expressway crash

Malaysia

Foreign woman found dead by river in Bidor suspected murdered

Malaysia

PH's Melaka gains point to need for wider political cooperation, says Amirudin

Malaysia

Perak Sultan warns against shielding rulers from people's grievances

Malaysia

BN-PN clinch two-thirds majority in Melaka with 24 seats

Malaysia

MPs to press ministers on nutrition law, illegal crypto mining and rural EV infrastructure

Malaysia

Zahid confirms BN will sit out Sarawak polls