Malaysia

Penang undersea tunnel on hold until feasibility report done

Consortium Zenith Construction Sdn Bhd yet to submit the final report to the state government

Updated 5 years ago · Published on 13 Oct 2020 3:55PM

Penang undersea tunnel on hold until feasibility report done
An overview of the Penang Transport Master Plan that includes the undersea tunnel project. – The Vibes, October 13, 2020

by Sofia Nasir

GEORGE TOWN – The state government has yet to proceed with the cross channel undersea tunnel as proposed in the Penang Transport Master Plan following public criticism.

State Infrastructure and Transport committee chairman Zairil Khir Johari said considerations will be made after the final feasibility study by project delivery partner Consortium Zenith Construction Sdn Bhd (CZC).

He added the CZC had submitted a draft of the feasibility report on September 6 last year to the state government after being examined by an independent consulting engineer.

“The draft report is currently being improved based on the comments received by various stakeholders and monitored by the state Government Technical Working Committee in a series of meetings since last November.

“The CZC is expected to finalise the feasibility report in the fourth quarter of 2020,” he said in a written reply at the state assembly sitting today.

Zairil (Tg Bungah-Pakatan Harapan) answered a written question from Yusni Mat Piah (Penaga-PAS) who wanted to know the details on the undersea tunnel project.

Zairil said if the state government decided to implement the undersea tunnel project based on the results of the feasibility study, the environmental impact study report (EIA) will be prepared for evaluation and approval by the Department of Environment.

Currently, he said, there is no need to submit an EIA application until the feasibility report is finalised by the CZC.

The RM46 billion undersea tunnel project is expected to connect Persiaran Gurneyon the island to Bagan Ajam in Seberang Perai.

Meanwhile, Zairil said the state government wanted a guarantee from the federal government that the ferry service would not be disrupted despite the proposed upgrading work.

He added the state government had sent a letter to the Transport Ministry on September 8 but yet to get a reply.

“The letter states the state government’s stance that any work to upgrade the ferry terminal and the operation of the new ferry be postponed until a new plan is presented to the state government.

“This is because, at this time, the state government is not aware of the ferry planning by the ministry,” he said.

Former finance minister Lim Guan Eng (Air Putih-PH) asked if the federal government had given a guarantee that the ferry service would not be disrupted.

Last August, Transport Minister Datuk Seri Wee Ka Siong in the Dewan Rakyat said the ministry was ready to discuss the acquisition of Penang’s ferry services – now run by Rapid Ferry – with the state government. – The Vibes, October 13, 2020

Spotlight

Malaysia

Puteri Umno distances itself from viral Threads post

By Alfian Z.M. Tahir

Malaysia

MACC drops orange detention attire for court remand cases after PM’s call

World

Man jailed six years for keeping Indonesian woman as slave in Melbourne home

Malaysia

Emergency declared in Serian as haze reaches hazardous levels (UPDATED)

Malaysia

Haze in Serian enters emergency phase

Malaysia

Death sentence for deaf, mute man who killed family of four upheld

Malaysia

Retired army officer with Datuk title charged with alleged sexual assault of golf caddie

Heritage

Penang first state to recognise Hungry Ghost Festival, cemeteries as heritage

You may be interested

Malaysia

Nepal-China flood toll hits 1,280 as 5,624 remain missing

Malaysia

12-year-old boy dies after motorcycle crashes into lorry in Gurun

Malaysia

Weak earthquake measuring 3.4 magnitude detected in Keningau

Malaysia

PM demands government discipline as public funds face greater scrutiny

Malaysia

Serian air pollution hits hazardous level with API reading of 495

Malaysia

Anwar: Children’s smiles, dreams are Malaysia’s future (video)

Malaysia

Retired army officer with Datuk title charged with alleged sexual assault of golf caddie

Malaysia

Child malnutrition needs urgent action, says Charles Santiago

By Alfian Z.M. Tahir