Malaysia

Penang sees massive water supply disruption after treatment plant breaks down

PBAPP hopes to resolve issue in stages between noon and 4pm

Updated 3 years ago · Published on 03 Dec 2022 2:11PM

Penang sees massive water supply disruption after treatment plant breaks down
Penang Water Supply Corp has deferred maintenance works at the Sg Dua water treatment plant slated for December 2 to 4 to resolve the sudden supply disruption that occurred today. – The Vibes file pic, December 3, 2022

by Ian McIntyre

GEORGE TOWN – Some 700,000 domestic households and industrial factories here are experiencing water supply disruption as the Sg Dua water treatment plant on the mainland is down due to a technical issue since the pre-dawn hours of today.

The unscheduled supply disruption happened just when Penang Water Supply Corp (PBAPP) was in the midst of running its scheduled maintenance exercise involving the majority of its consumers in Seberang Prai.

The scheduled maintenance order was announced by Penang Chief Minister and PBAPP board chairman Chow Kon Yeow, who said it was a necessity to ensure that the production capacity would be back to its optimum level.

It was slated for December 2 to 4 but now it has been deferred as PBAPP is working to resolve the sudden supply disruption to major areas on the island.

Workers carry out scheduled maintenance work at the Sg Dua water treatment plant in Penang. The work had to be deferred after a technical flare up caused water supply disruption on the island today. – PBAPP Penang Facebook pic, December 3, 2022
Workers carry out scheduled maintenance work at the Sg Dua water treatment plant in Penang. The work had to be deferred after a technical flare up caused water supply disruption on the island today. – PBAPP Penang Facebook pic, December 3, 2022

Last July, most of Penang suffered major water cuts after floodwaters filled with debris streamed down Sg Muda to the main intake station at Lahar Tiang in Kepala Batas.

It went on to disrupt the treatment facility in Sg Dua.

Now, PBAPP in a statement stated that similar floods in Baling had impacted the scheduled maintenance at the Sg Dua plant, causing a technical issue to flare up.

PBAPP hopes to restore water supply to normal levels in stages between noon and 4pm.

Areas with either no water or low pressure are Gelugor, Bukit Gelugor, Jalan Sultan Azlan Shah, Batu Uban, Jalan Sg Dua, Universiti Sains Malaysia, Jalan Kg Jawa, Free Trade Industrial Zone, Taman Lip Sin, Sg Nibong, Jalan Tengah, Taman Pekaka, Jalan Aziz Ibrahim, Bukit Jambul, Bayan Baru, Tun Dr Lim Chong Eu Expressway, Pulau Jerejak, Bayan Lepas International Airport, Bayan Lepas, Persiaran Mayang Pasir, Taman Bukit Dumbar, Jalan Permatang Damar Laut, Batu Maung, Teluk Tempoyak, Bandar Cassia (Jalan Kekabu), Desa Wangsa Flats, Jalan Yeap Chor Ee, Island Glades, Island Park, Teluk Kumbar, Bukit Gedung, Balik Pulau, Sg Ara, Jalan Tun Dr Awang, and Relau.

In online chat groups, civil society personalities in Penang began hitting out at the state and the water authority, saying that disruption should not be common in a state like Penang, which boasts one of the oldest water utility operators in the country.

Tg Bungah Residents’ Association president Zulfikar Abdul Aziz said water cuts have caught many consumers off guard, especially since it is a weekend. – The Vibes, December 3, 2022

Related News

Malaysia / 7h

Penang’s Air Itam-Tun Dr Lim Chong Eu bypass nearing completion

Events / 3d

Jokowi to deliver keynote address at Peace Dialogue in Penang

Community / 3d

Penang authorities seal transit home units, occupants appeal for leniency

Malaysia / 4d

Penang secures more than RM17b investments for first half of 2026

Heritage / 4d

Penang first state to recognise Hungry Ghost Festival, cemeteries as heritage

Malaysia / 5d

Collision between tanker and ferry under investigation - PPC

Spotlight

Malaysia

MP calls on US to take legal action against Hadi over ‘plot to topple government’ statement

By Ian McIntyre

Malaysia

Malaysia needs to master its own technology - PM Anwar

Malaysia

RM2.48m lost daily to investment fraud syndicates since 2023

Malaysia

Rising bond rates are a sign of rising debt

Education

Selangor to close schools if API readings exceed 200

Malaysia

Loke: Keep Anwar as PM to complete reform agenda

Malaysia

Investigations into political leaders not driven by spite or political payback - PM

You may be interested

Malaysia

Sultan Nazrin calls for wider access, stronger action in fight against cancer

Malaysia

Jokowi calls for strong, people-centred leadership to navigate global uncertainty

By Ian McIntyre

Malaysia

Loke: Keep Anwar as PM to complete reform agenda

Malaysia

Haze: 40 areas record unhealthy API, Samarahan worst

Malaysia

Police probe alleged abuse of two-year-old at Mentakab nursery

Malaysia

Melaka CM hints at state assembly dissolution being ‘two Fridays’ away

Malaysia

SSM warns NGOs against collecting public donations without approval

Malaysia

Zara Qairina’s father says he was never asked about post-mortem

By Alfian Z.M. Tahir