Opinion

Letter – Penang South Reclamation a sustainable development project – PIC

Government-linked special purpose vehicle says it is factually wrong to say that reclamation will stop fishery activity

Updated 5 years ago · Published on 07 Feb 2021 1:00PM

Letter – Penang South Reclamation a sustainable development project – PIC
Penang Infrastructure Corporation says the proceeding of the PSR is legal and legitimate. – File pic, February 7, 2021

WE would like to reply to the expected responses from Pen Mutiara and Penang Forum regarding the progress of the Penang South Reclamation (PSR) project, published in the New Straits Times and The Vibes on February 5 and February 6, 2021, respectively.  The following points are grouped into related categories raised by the two groups.

Social Impact Management Plan (SIMP)

As already been made known previously, we have met with Pen Mutiara on October 23, 2020 and presented the SIMP packages that are beneficial to the fishermen to the group. We have requested them to engage the fishermen and provide feedback to us should there be any amendment required.

Upon learning that Pen Mutiara has not engaged, informed and collected feedback from the fishermen after more than two months, we had another meeting with them on December 28, 2020 to get the latest update. During that meeting, Pen Mutiara had remarked that they reject any further discussion on the SIMP.

In order to protect the welfare of the fishermen, whom Pen Mutiara has failed to engage and represent, we have decided to reach out to the fishermen directly. We have received feedback from the two fishermen engagement centres that many fishermen are agreeable with the SIMP packages.

Sustainability of PSR

The PSR has minimal impact to fishery activity as the project reserves waterways or channels for fishermen to continue their fishing activity. The popular fishing areas are beyond the site earmarked for PSR. It is factually wrong to say that the reclamation will stop fishery activity.

The SIMP has also included provision of new boats and engines to enable fishermen to continue with their trade. On top of that, a range of plans related to fishery is also included in the SIMP – for instance, new jetties and better facilities are to be built for the fishermen. PSR does not stop fishery activity, as being falsely stated by the two groups.

The PSR is a sustainable development project that is aligned to the expert reports and climate adaptation recommendations produced by the world's top authority on climate change, the United Nations’ Intergovernmental Panel on Climate Change’s (IPCC) Special Report on the Ocean and Cryosphere in A Changing Climate and Special Report on Climate Change and Land.

As PSR has received the conditional approval for the Environmental Impact Assessment, it is legal for the project to proceed as long as all the stated requirements are met. Therefore, the proceeding of PSR is legal and legitimate.

We will continue to reach out directly to the fishermen, without going through a middleman, to ensure the fishermen themselves receive the benefits from the PSR project.

Socioeconomic benefits during Covid-19

The implementation of PSR is especially timely given the economic malaise caused by the Covid-19 pandemic. New job opportunities will be created from the project, with a boost of domestic direct investment pouring into the state. These economic stimuluses will be able to bring sustenance to struggling households to pull through the current crisis.

Furthermore, the reclamation of Island A for the purpose of developing Industry 4.0 will attract more investment into Penang, create more high-value jobs, and bring upliftment to the local community and contribute to the economic growth of the state and country. – The Vibes, February 7, 2021

Penang Infrastructure Corporation Sdn Bhd (PIC) is a Penang government-linked special purpose vehicle formed in July 2020 to lead the implementation of mega projects under the Penang Transport Master Plan (PTMP)

Related News

Malaysia / 8h

Court dismisses tycoon Tan Kok Ping's libel appeal against Penang CM

Malaysia / 14h

Schools in Penang ready to implement PdPR if API exceeds 200

Off beat / 2d

Greater emphasis must be placed on tourism value, says Penang CM

Malaysia / 2d

RM1.96m Penang land probe: Two ‘Datuks’ remain in custody

Malaysia / 5d

Penang is first state to enforce private homestay law

Malaysia / 5d

Five, including a 'Datuk' detained over alleged abuse of power in Penang land sale

Spotlight

Malaysia

Myanmar hotel worker charged over alleged sexual assault of three-year-old Australian boy in Penang

Health

MOH weighs HFMD vaccine strategy as cases plunge 83%

World

Trump links Saudi nuclear deal to Israel recognition as pact heads to Congress

Malaysia

Shah Alam brawl turns deadly as car strikes man after machete attack (video)

Music

‘Queen of Country’, Dolly Parton dies at 80

Sports & Fitness

Global cricket legends urge Pakistan to honour court order on Imran Khan’s medical care

Malaysia

Should PH work with Bersama to defeat a common enemy?

Business

Nation’s economic outlook strengthens as leading index signals continued growth