Malaysia

Government approves four projects to improve water services in Penang

The federal government is working with Penang to upgrade the Lahar Yooi pump house so it can boost intake up to 440 million litres daily (MLD) from neighbouring Sungai Muda.

Updated 1 year ago · Published on 08 Nov 2024 12:12PM

Government approves four projects to improve water services in Penang
These four Federal projects are additional water supply projects that should be implemented in tandem with Penang’s RM1.184 billion Water Contingency Plan 2030 - November 8, 2024

by Ian McIntyre

THE Penang Water Supply Corporation (PBAPP) said it has received federal approval for four additional infrastructure projects which will improve the quality of water services for the northern region.

Its chief executive officer Datuk K Pathmanathan said the federal government is working with Penang to upgrade the Lahar Yooi pump house so it can boost intake up to 440 million litres daily (MLD) from neighbouring Sungai Muda.

This pump house represents Phase 2C of the Mengkuang Dam Expansion Project (MDEP). 

It will be built to pump an additional 440 MLD of raw water from Sungai Muda to refill the 86.4 billion litre dam more efficiently during the wet seasons.  

The Lahar Yooi Pump House supports PBAPP’s plan to convert the dam from a “strategic drought reserve” to a “daily dam” (with the completion of the new 114 MLD Mengkuang Dam Water Treatment Plant in 2025).  

The second is to install a dual-purpose pipeline to the Sungai Dua Canal.

This pipeline is needed to support the operations of the proposed move to upgrade the Lahar Yooi Pump House.  

It will channel an additional 440 MLD of raw water to the dam during the wet seasons and also deliver an additional 440 MLD of water from the dam into the Sungai Dua Canal, for use in the Sungai Dua Water Treatment Plant during a crisis.

In effect, the maximum drawdown of the EMD will be boosted from 600 MLD to 1,040 MLD when this pipeline is commissioned. 

The remaining two projects are to build two off - river storage schemes (ORSS) for the Sungai Kerian and Sungai Muda arteries.

These 2 ORSS projects are essentially “mini-dam” projects proposed for development at or near the riverbanks of Sungai Muda in Seberang Perai Utara (SPU) and Sungai Kerian in Seberang Perai Selatan (SPS).

Excess raw water from a river may be stored in an ORSS. 

The “spare water” may be drawn down to support 24 - 48 hours of water supply services during droughts, mishaps or other emergency scenarios. Subsequently, the ORSS may be refilled with excess raw water from the river.

These four Federal projects are additional water supply projects that should be implemented in tandem with Penang’s RM1.184 billion Water Contingency Plan 2030 (WCP 2030) and the RM4.5 billion “Perak-Penang Water Project," said Pathmanathan. - November 8, 2024.

Related News

Community / 3h

Paya Terubong landslide: Developer, landowner must take responsibility - CM

Community / 1d

Paya Terubong landslide: Resident writes to 15 ADUN to seek ban on hillslope development

Malaysia / 2d

Flash floods, landslides: Penangites asked to be on alert

Malaysia / 3d

Air Itam - Tun Dr Lim Chong Eu Expressway expected to be ready by April next year

Malaysia / 5d

Penang to seek greater clarification over Waze ban

Places / 1w

Penang makes National Geographic list of top 25 cities worldwide to visit

Spotlight

Malaysia

Mahathir’s RM150m defamation suit against Anwar faces uncertainty

Malaysia

Son shocked by father’s fatal hacking in FELDA settlement

Malaysia

Election Commission to meet on Nov 6 to set key dates for Sarawak polls

Malaysia

PH says final 72 hours could decide Melaka election outcome despite 70-80% target

Malaysia

RM3.28m Govt aid reaches 164 Indian community places of worship

Malaysia

Ismail Lasim holds off on new Negeri Sembilan exco appointments pending court decision

By Alfian Z.M. Tahir

Malaysia

Battersea project’s high upfront cost led to losses for Malaysian investors, says Anwar

Malaysia

Ras Adiba condemns unauthorised entry into missing TV host Zalina Azman’s home

You may be interested

Malaysia

‘Zalim apa ini?’ Anwar challenges claims opposition areas are sidelined

By Alfian Z.M. Tahir

Malaysia

Amir Hamzah: 1MDB losses may remain at RM20.1b even after RM31.3b recovery

Malaysia

Mahathir’s RM150m defamation suit against Anwar faces uncertainty

Malaysia

MCA’s two-seat allocation exposes shrinking influence in BN

By Alfian Z.M. Tahir

Malaysia

Langkawi duty-free shopping limit raised tenfold to RM10,000 from 2027, says Liew

Malaysia

Election Commission to meet on Nov 6 to set key dates for Sarawak polls

Malaysia

Retired government servant charged with committing sexual offenses against two children

Malaysia

Three men paid up to RM1k per attack in five-state arson and vandalism spree