Malaysia

Aerotrain at KLIA Terminal 1 resumes 24-hour operations from June 1 - Loke

“Endurance testing was conducted over 24-hour and 48-hour periods under both passenger and non-passenger conditions,” said Loke.

Updated 2 months ago · Published on 31 May 2026 3:00PM

Aerotrain at KLIA Terminal 1 resumes 24-hour operations from June 1 - Loke
Loke said the Aerotrain has recorded 100 per cent Operational Service Availability since January 2026. - May 31, 2026

THE Aerotrain service at Kuala Lumpur International Airport (KLIA) Terminal 1 will resume full 24- hour operations from midnight on June 1, following the completion of a Comprehensive Action Plan (CAP), said Transport Minister Loke Siew Fook.

He said the plan, implemented since November 2025, was carried out in coordination with the Land Public Transport Agency (APAD) and verified by independent railway assessors.

“The CAP covered three structured stages, namely inspection and rectification works, system testing and validation, as well as trial operations.

“Endurance testing was conducted over 24-hour and 48-hour periods under both passenger and non-passenger conditions,” he said as reported by Bernama.

Loke said the Aerotrain has recorded 100 per cent Operational Service Availability since January 2026.

He added that the daily engineering hours from 12 am to 5 am would continue to be maintained, during which a single train would remain in operation to serve passengers while routine inspection and maintenance works are carried out.

“The Ministry of Transport, through APAD, will continue to exercise regulatory oversight over the Aerotrain’s operations, while Malaysia Airports remains accountable for maintaining the service standards established under this plan,” he said. – May 31, 2026

Related News

Malaysia / 1w

Cabinet approves 17 measures to beef up KLIA security checks, controls

Malaysia / 1w

Disturbed woman at KLIA taken to hospital, had forgotten to take medication

Malaysia / 1w

Woman, believed to be foreigner, allegedly causes disturbance at KLIA (video)

Malaysia / 2w

Guan Eng accuses Penang CM of misleading people

Malaysia / 2w

Kelana Jaya LRT train breaks down, passengers stranded on tracks (video)

Malaysia / 2w

To leave or to stay? Penang and Kedah DAP remain undecided

Spotlight

Malaysia

Desa ParkCity deaths: Netizens voice concern, call for increased enforcement, crackdowns on scammers

Malaysia

Seven Yemenis arrested over dangerous stunt on KL road

Malaysia

UMNO gives state leaders mandate to negotiate electoral pacts

Malaysia

Sultan Selangor warns against greed, abuse of trust

By Alfian Z.M. Tahir

Malaysia

Form Six students to get allowance from 2027

Malaysia

Desa ParkCity deaths: Wife believed to be victim of love scam, say cops

Malaysia

Saravanan's letter will be referred to MACC, relevant authorities - PM Anwar

Malaysia

Thirteen arrested after teen girl dies in suspected gang-related road attack in Kulai

You may be interested

Malaysia

‘Do not compromise’: Anwar demands zero tolerance for school bullies

By Ian McIntyre

Malaysia

National Day 2026: Fahmi assures safety of human graphic structure amid haze concerns

Malaysia

Parents warned: Children risk prosecution as bank account mules

Malaysia

Nepal flood toll exceeds 500 as Malaysia mobilises to locate 55 missing nationals

Malaysia

Nepal police name 23 missing Malaysians as flood catastrophe claims 392 lives

Malaysia

Defamation is a rich man’s game

Malaysia

Teacher transferred as MOE probes pupil’s death after sports activity

Malaysia

Desa ParkCity deaths: Wife believed to be victim of love scam, say cops