Malaysia

Air Itam reserves dwindling, use water wisely, PBAPP urges consumers

Dip due to dry spell, high consumption in some areas, says authority

Updated 4 years ago · Published on 02 Apr 2022 2:12PM

Air Itam reserves dwindling, use water wisely, PBAPP urges consumers
The Penang Water Supply Corporation says the only way to replenish the reserves of the Air Itam dam is to wait for seasonal rainfall or to induce rainfall via cloud seeding. – PBAPP Facebook pic, April 2, 2022

GEORGE TOWN – The dry spell in certain parts of the state has caused the water levels to dip at the Air Itam dam and Bukit Dumbar reservoirs, with the Penang Water Supply Corporation (PBAPP) urging consumers to moderate their usage.

PBAPP said the secondary cause of the lower water levels is the high daily usage in the Air Itam township and surrounding areas.

It added that the only way to replenish the reserves of the Air Itam dam is to wait for seasonal rainfall or to induce rainfall via cloud seeding.

For now, consumers are advised to use water wisely, especially between April and May.

The water level of the Air Itam dam is at 38.5% as of March 31, while Bukit Dumbar reservoirs are seeing low levels.

After recording water usage in the state for the past three months, PBAPP found that there has been consistent high water usage by consumers. 

On March 31, metered water consumption was almost 900 million litres per day (MLD), as compared to the average of 860 MLD in 2021.

The treated water pumped from the Sg Dua water treatment plant (WTP) in Seberang Prai to the Bukit Dumbar reservoirs in Penang island daily is drawn down fast. 

Water demands in the southern parts of the island are also significantly high.

Since the treated water levels are low at the Bukit Dumbar reservoirs, PBAPP cannot pump water at adequate pressures to all end-of-line (EOL) and higher ground areas. The water pumps will trip or shut down automatically as well as risk being damaged.

Meanwhile, PBAPP is implementing several solutions to counter disrupted water supply and low water pressure in Seberang Prai Selatan, Air Itam hillside areas and several blocks of the five-storey apartments at Bukit Gedung. 

Among them are ramping up treated water production at all nine water treatments plants in Penang and increasing treated water production at the Air Itam WTP, Guillemard WTP and Batu Ferringhi WTP to support a gradual build-up of treated water reserves in the Bukit Dumbar reservoirs.

PBAPP has also since installed taps at fire hydrants to provide water supply to the Bukit Gedung residents. Due to low water pressure, water supply can now only reach the ground floor and first floor of several blocks.

It has also advised building management corporations to install residential pumping systems at EOL or higher ground areas to mitigate issues of low water pressure during dry seasons. – The Vibes, April 2, 2022

Related News

Malaysia / 14h

Penang water tariffs to increase from July 1 after year-long deferment

Malaysia / 1d

Police looking for trio involved in violent armed robbery in Penang (video)

Malaysia / 4d

One killed as fire destroys former Odeon cinema in Penang

Off beat / 5d

Penang: CM orders all state excos to monitor development progress

Events / 1w

Penang to host 2026 South East Asian Pipe Band Championships for third time

Events / 1w

PCEB inks MoU with EON Bhd for sustainable mobility solutions

Spotlight

Business

Tycoon Vincent Tan trims BCorp stake further in RM115m share sale

Malaysia

UMNO’s solo gamble in Johor: A show of strength or risky miscalculation?

By The Vibes Says

Malaysia

Nik Aziz’s grandson allegedly slapped by senator: Father ready to take case to court

Malaysia

Lorry driver jailed a day, fined for making obscene gestures, dangerous driving (video)

Malaysia

PKR leader defends MyKhas access suspension for PJ, Subang MPs, cites ‘political choices’

Opinion

Social media set to dominate Johor polls as election kingmaker

Malaysia

Man charged in Butterworth parang attack case that left victim fearing permanent disability

Malaysia

Teen mothers must return to school, says Fadhlina as education remains priority

Malaysia

Penang water tariffs to increase from July 1 after year-long deferment

You may be interested

Malaysia

Johor State Election: BN to launch machinery this Sunday

Malaysia

Care home worker jailed 36 years and caned for sexual offences against five boys

Malaysia

Trust and transformation: Malaysia - Japan deepen strategic economic ties

Malaysia

Former head of a ministry's corporate communications unit acquitted of bribery charge

Malaysia

Malaysians may soon be able to get a 10-year passport for RM350

Malaysia

Family of five killed as car crashes into water pipe in Serian

Malaysia

Viral list of PRN candidates is fake - BN Johor

Malaysia

Police confirm mystery of Jaslinda's disappearance has no criminal element