Malaysia

Water supply at Air Itam Dam to last till end of June: exco

Zairil Khir Johari urges residents to reduce consumption

Updated 3 years ago · Published on 09 May 2023 5:24PM

Water supply at Air Itam Dam to last till end of June: exco
Penang Infrastructure and Transport executive councillor Zairil Khir Johari says the effective capacity of the Air Itam Dam has dropped to 41% and can only last till the end of June due to the prolonged dry season. – PBAPP Penang Facebook pic, May 9, 2023

GEORGE TOWN – The effective capacity of the Air Itam Dam will be at a critical level if there is no rainfall in its water catchment area in the next 40 days.

Penang Infrastructure and Transport executive councillor Zairil Khir Johari said the effective capacity of the dam has dropped to 41% and can only last till the end of June due to the prolonged dry season.

Zairil also urged Penang residents to reduce their consumption and conserve water, adding that high consumption has been depleting the dam’s capacity.

“The depletion percentage is higher for the Air Itam Dam because it is a smaller dam with a maximum effective capacity of 2,160 million ℓ. The dam supplies about 30,000 consumers in Air Itam and Paya Terubong,” he told a press conference with Penang Water Supply Corp (PBAPP) chief executive K. Pathmanathan here today.

He added that the Teluk Bahang Dam, which supplies water for about 500,000 consumers, will only be able to last up to 146 days unless rain falls in the catchment areas. 

Zairil said higher domestic water consumption has been the main factor for depleting dams on Penang island, besides a lack of rainfall at the water catchment areas.

“Penang is top of the list in the country with the highest consumption of 286ℓ per capita per day and we would like to appeal to all Penangites to reduce water consumption as it will help us to sustain the raw water reserves of the dams for as long as possible,” he said.

He added that despite Penang recording more rainfall at the end of April this year compared to last year, the rain was not falling at the catchment areas.

Meanwhile, Pathmanathan said PBAPP is fully committed towards managing the effective capacities of the dams.

He said PBAPP will recommend a second round of cloud seeding to trigger rainfall in the water catchment areas of Air Itam Dam and Teluk Bahang Dam.

“We do not wish to cause inconvenience to the people of Penang and Penang-based businesses unnecessarily. With this key consideration, PBAPP will only implement stringent water supply control measures in Penang when it is absolutely necessary and we will accordingly inform the public ahead of time,” he said. – Bernama, May 9, 2023

Related News

Malaysia / 2d

No further delays for water tariff hike in Penang - CM

People / 2d

Penang: Greater efforts needed to record historical events, says nonagenarian

People / 2d

Penang: Eurasian association mourns sudden loss of its president

Malaysia / 3d

Penang signs landmark Perak water deal to secure 40-year supply from 2032

Malaysia / 4d

Penang: Sandbags as temporary measure to curb erosion at Batu Ferringhi

Film / 5d

Netflix film with Mark Wahlberg a major boost to Penang’s international profile

Spotlight

Malaysia

PRN Negeri Sembilan: The battlegrounds, big names and three-cornered fights to watch

By Alfian Z.M. Tahir

People

Woman ends up with RM500 over food bill after date with ‘doctor’

Malaysia

Love scam: Twelve China nationals arrested in Ipoh over suspected online call centres

Malaysia

ASLI to field female candidate in Jeram Padang DUN

Community

‘Furry officer’ laid to rest as Kuching traffic police mourn beloved stray cat (video)

By Alfian Z.M. Tahir

Malaysia

Father mauled by crocodile as son watches in horror in Sabah river (UPDATED)

Malaysia

Johor shuts down Forest City Network School premises

Malaysia

Singapore: Chief Justice Sundaresh Menon to retire in Feb 2027, succeeded by Justice Sushil Nair

You may be interested

Malaysia

Love scam: Twelve China nationals arrested in Ipoh over suspected online call centres

Malaysia

PRN Negeri Sembilan: Jalaluddin, Anthony Loke arrive a nomination centre

Malaysia

Anwar tasks new Felda chairman with advancing settler welfare and long-term sustainability

Malaysia

BN-PN pact in Negeri Sembilan polls centred on stability and full 36-seat victory target

Malaysia

PH youth wing calls on BN ministers to quit cabinet over PN electoral alliance

Malaysia

Unity government unlikely to return for second term as BN-PN cooperation gains momentum, says analyst

By Alfian Z.M. Tahir

Malaysia

Johor shuts down Forest City Network School premises

Malaysia

MACC opens probe into KWAP'S RM200 million eFishery investment