Business

Penang extends LRT project pre-qualification bid after good response

Interested firms have till Oct 7 to submit proposals, says Infrastructure exco Zairil Khir Johari

Updated 4 years ago · Published on 11 Aug 2022 4:47PM

Penang extends LRT project pre-qualification bid after good response
Penang Infrastructure and Transport exco Zairil Khir Johari (pic) says the state will fund the LRT project through the sale of prime land from three reclaimed islands off Bayan Lepas. – Bernama pic, August 11, 2022

by Ian McIntyre

GEORGE TOWN – Over 40 local and international engineering firms have expressed interest in the pre-qualification exercise for Penang Island’s proposed light rail transit (LRT) system to link Penang International Airport in Bayan Lepas to Komtar here.

State Infrastructure and Transport exco Zairil Khir Johari said in view of the keen interest, Penang has decided to extend the pre-qualification period from August 24 until October 7, this year.

The exercise was initially launched in July but Zairil said it was only fair to extend the period to allow proposers to submit their documents.

The project is valued at RM9.5 billion and it is envisioned to be the flagship of the proposed RM30 billion Penang Transport Master Plan, which is designed to ease the present high congestion rate in the state.

Penang will fund the project through the sale of prime land from three reclaimed islands off Bayan Lepas.

The work will consist of installing a 26.8-km viaduct, constructing 23 stations, a depot and car parking facilities.

Zairil noted that several firms from Europe and Asia had requested for more time to ready the necessary documents and bank assurances to enter the pre-qualification bid.

Joint venture companies must also prove that they have track records of finalising a railway system worth more than RM800 million in the past five years.

Despite the project’s go-ahead by the state government, the Penang Forum, an umbrella body of several non-governmental organisations here, continues to oppose the project on grounds that there are alternative public transport systems.

Civil society members want Penang to consider other modes of public transport such as bus lines, instead of constructing more roads and the LRT – The Vibes, August 11, 2022

Related News

Malaysia / 4d

Budget 2027: Penang looks forward to good news on PTFC

Events / 6d

MBPP President shares valuable insights at zero-waste conference 

Diary / 1w

Penang reaffirms commitment to preserve heritage sites across the state

Places / 1w

LOT Polish Airlines to bring in more tourists to Penang from November

Places / 1w

Penang LRT: Traffic diversions imposed for major roadworks

Malaysia / 2w

PH-BN cooperation in Penang remains smooth, says Exco

Spotlight

Malaysia

JPJ temporarily suspends VTA and registration for Chery Omoda 5

Malaysia

Eligibility for PTPTN repayment deferment to be verified with LHDN

Malaysia

Budget allocates two rounds of cash aid to millions of Malaysians in 70th Merdeka year

Malaysia

No Malaysians killed or injured in Riyadh airport attack, says Wisma Putra

Malaysia

JAIS probes viral religious ritual footage, says AI manipulation not ruled out

Malaysia

10-tonne truck ploughs into 11 vehicles: Police probe possible brake failure

World

Trump weighs joining Saudi strikes after deadly Houthi attack on Riyadh airport

You may be interested

Business

Malaysia draws US$9.5b in orders for US$1.5b sukuk, cuts borrowing costs

Business

Budget 2027 channels RM270m to SMEs through crowdfunding, P2P financing