Malaysia

Penang Infrastructure projects make significant progress, says Chief Minister

Key developments include the construction of the main roads and the Third Link, which involves two bypass routes

Updated 1 year ago · Published on 07 Apr 2025 6:27PM

Penang Infrastructure projects make significant progress, says Chief Minister
Aside from alleviating congestion, the NCPR Package 1 will reduce travel time from 45 minutes to just 10 minutes - April 7, 2025

PENANG'S ongoing infrastructure developments are progressing rapidly, thanks to strong cooperation between both state and federal governments, along with key stakeholders, according to Chief Minister Chow Kon Yeow.

Speaking at a recent event marking the open house for Consortium Zenith Construction Sdn Bhd (CZC), Chow emphasised the major strides being made in several large-scale projects spearheaded by the company.

Among these critical initiatives are key developments such as the construction of the main roads and the Third Link, which involves two bypass routes connecting the Tun Dr Lim Chong Eu Expressway to Ayer Itam, as well as a new alignment for the North Coast Paired Road (NCPR) from Tanjung Bungah to Teluk Bahang.

“The Package 2 bypass from the Tun Dr Lim Chong Eu Expressway to Ayer Itam is now more than 75% complete, with physical works expected to be finished by the end of this year,” said Chow. “This toll-free highway will dramatically cut travel time from 40 minutes to just five minutes, significantly easing traffic congestion."

The Chief Minister also provided updates on the NCPR Package 1, revealing that the project is in the final stages of its sub-agreement process, with physical work set to begin either at the end of this year or early next year.

“Aside from alleviating congestion, this project will reduce travel time from 45 minutes to just 10 minutes,” he added.

Chow had previously announced that the Penang state government had approved a new alignment for the NCPR, stretching from Tanjung Bungah to Teluk Bahang, with the project estimated to cost RM2.43 billion. The new 10.61-kilometre route will comprise 8.41 kilometres of main road and 2.2 kilometres of coastal road.

In his remarks, Chow highlighted the momentum building in Penang’s infrastructure sector, which is set to improve traffic flow and provide enhanced accessibility across the island. – April 7, 2025

Spotlight

Malaysia

Anwar: Children’s smiles, dreams are Malaysia’s future (video)

Heritage

Penang first state to recognise Hungry Ghost Festival, cemeteries as heritage

Malaysia

Child malnutrition needs urgent action, says Charles Santiago

By Alfian Z.M. Tahir

Malaysia

Zahid: Umno, BN favour earlier GE16

World

Trump floats renaming Strait Of Hormuz ‘Trump Strait’ amid Iran conflict

Malaysia

Weak earthquake measuring 3.4 magnitude detected in Keningau

Malaysia

Stepfather held over alleged rape, sexual assault of 13-year-old in Besut

Malaysia

Toying with danger: Police tracking owner of MPV

You may be interested

Malaysia

Ministries must spend according to set budgets - KSN

Malaysia

Weak earthquake measuring 3.4 magnitude detected in Keningau

Malaysia

Hannah Yeoh, husband divorce after 18 years of marriage

Malaysia

Woman injured as concrete debris falls from George Town heritage building

Malaysia

Four teenagers feared drowned at Tanjung Lompat

Malaysia

Stepfather held over alleged rape, sexual assault of 13-year-old in Besut

Malaysia

VVIP could be first charged in Tabung Haji RCI probe

Malaysia

Gateway attacks on The Vibes servers are an attack on all Malaysians