Malaysia

Penang Infrastructure projects make significant progress, says Chief Minister

Key developments include the construction of the main roads and the Third Link, which involves two bypass routes

Updated 1 year ago · Published on 07 Apr 2025 6:27PM

Penang Infrastructure projects make significant progress, says Chief Minister
Aside from alleviating congestion, the NCPR Package 1 will reduce travel time from 45 minutes to just 10 minutes - April 7, 2025

PENANG'S ongoing infrastructure developments are progressing rapidly, thanks to strong cooperation between both state and federal governments, along with key stakeholders, according to Chief Minister Chow Kon Yeow.

Speaking at a recent event marking the open house for Consortium Zenith Construction Sdn Bhd (CZC), Chow emphasised the major strides being made in several large-scale projects spearheaded by the company.

Among these critical initiatives are key developments such as the construction of the main roads and the Third Link, which involves two bypass routes connecting the Tun Dr Lim Chong Eu Expressway to Ayer Itam, as well as a new alignment for the North Coast Paired Road (NCPR) from Tanjung Bungah to Teluk Bahang.

“The Package 2 bypass from the Tun Dr Lim Chong Eu Expressway to Ayer Itam is now more than 75% complete, with physical works expected to be finished by the end of this year,” said Chow. “This toll-free highway will dramatically cut travel time from 40 minutes to just five minutes, significantly easing traffic congestion."

The Chief Minister also provided updates on the NCPR Package 1, revealing that the project is in the final stages of its sub-agreement process, with physical work set to begin either at the end of this year or early next year.

“Aside from alleviating congestion, this project will reduce travel time from 45 minutes to just 10 minutes,” he added.

Chow had previously announced that the Penang state government had approved a new alignment for the NCPR, stretching from Tanjung Bungah to Teluk Bahang, with the project estimated to cost RM2.43 billion. The new 10.61-kilometre route will comprise 8.41 kilometres of main road and 2.2 kilometres of coastal road.

In his remarks, Chow highlighted the momentum building in Penang’s infrastructure sector, which is set to improve traffic flow and provide enhanced accessibility across the island. – April 7, 2025

Spotlight

Malaysia

Man found dead on massage chair

Education

Haze: Schools in Johor to reopen this Monday

Malaysia

Police looking for owner and driver of car spotted with two men on it

Malaysia

Farhash files defamation suit against Rafizi

Malaysia

Melaka PRN: Only seven seats for PAS-PN, says Zahid

Community

Sim reaches out to man who needed a wheelchair in Kelantan

By Ian McIntyre

Malaysia

Selangor Sultan urges younger generation to unite, become knowledgeable individuals

World

UK MP seeks legal safeguards against AI likenesses created without consent

World

Seven dead, 34 injured in church attack in southern Jordan

You may be interested

Malaysia

Two women journalists injured after lorry crashes into car in Ipoh

Malaysia

Melaka PRN: Only seven seats for PAS-PN, says Zahid

Malaysia

MCA weighs Melaka election boycott after clash with BN over candidates

Malaysia

Flash floods, landslides: Penangites asked to be on alert

Malaysia

KPDN seizes 5,801 squishy toys worth RM70,428 over safety compliance failures

Malaysia

Year One pupil found dead at apartment complex

Malaysia

Anwar congratulates Sultan of Selangor on 25th anniversary of reign

Malaysia

Financial pressures force Malaysians to delay marriage, first child

By Alfian Z.M. Tahir