Malaysia

Now not time to push for PSR, Nurul Izzah says of project ‘filled with debt’

Permatang Pauh MP says in time of pandemic, better to preserve valuable fishing spots to improve food security

Updated 5 years ago · Published on 31 May 2021 8:00PM

Now not time to push for PSR, Nurul Izzah says of project ‘filled with debt’
The entire PSR project will be funded and managed by a 70-30 joint venture between SRS Consortium Sdn Bhd and the Penang government. – Penangpropertytalk.com pic, May 31, 2021

GEORGE TOWN – This is not the time to push for the proposed Penang South Reclamation (PSR) project, said Permatang Pauh MP Nurul Izzah Anwar.

She said amid a raging pandemic, it is better to preserve the valuable fishing spots in the affected areas to improve food security.

In her blog post, Nurul Izzah said she and fellow PKR members had supported the initial Penang Transport Master Plan (PMTP) and PSR that was meant to underwrite PMTP.

“While my fellow party members and I initially supported the push for better public transport, we began to develop doubts when PTMP evolved to include mega highways across hills and rivers, light rail transits, monorails, a skycab and land reclamation.

“Therefore, we have to weigh this matter against the priorities of environmental protection and well-being and livelihoods of our constituents. The losses and risks of this project far outweigh any possible gains to the state and its people.

“PSR (now also referred to as Penang South Islands, or PSI) has consistently drawn my opposition through internal channels, public statements, as well as questions raised in Parliament.”

She then listed the reasons for her objection.

“The need to reconsider mega infrastructure projects, particularly as the country navigates yet another unforgiving wave of this pandemic with an expected K-shaped recovery.

“The state and the people of Penang should not be burdened with a project fraught with debt, risks, uncertainties, and U-turns.

“As it stands, the entire PSR project will be funded and managed by a 70-30 joint venture between SRS Consortium Sdn Bhd and the Penang government – it is now a privately-led mega project, lacking clarity on the various aspects of the mammoth project.”

Permatang Pauh MP Nurul Izzah Anwar says she initially supported the push for better public transport, but began to develop doubts when PTMP evolved to include mega highways across hills and rivers, light rail transits, monorails, a skycab and land reclamation. – The Vibes file pic, May 31, 2021
Permatang Pauh MP Nurul Izzah Anwar says she initially supported the push for better public transport, but began to develop doubts when PTMP evolved to include mega highways across hills and rivers, light rail transits, monorails, a skycab and land reclamation. – The Vibes file pic, May 31, 2021

In a recent statement, SRS Consortium (the project delivery partner for the PSR project) stated that the 70-30 joint venture agreement will ensure Penang benefits from the ensuing foreign direct investment, gross domestic product contribution and creation of high-skilled jobs over a 30-year development timeframe for the three PSIs.

“While we do not deny the need for constant evaluation and improvement of physical and economic infrastructures, this must not result in permanent and irreparable environmental destruction as admitted by SRS Consortium’s own Environmental Impact Assessment (EIA) consultants,” said Nurul Izzah.

“The state’s ambition to leave a legacy must not be at the expense of the people; not only fishermen whose livelihood are directly threatened, but also all Penangites who will bear the cost of diminishing supply of fresh seafood and resultant higher prices.

“We need to strengthen our re-skilling efforts, to enable local communities to compete effectively for incoming high-skilled roles; bearing in mind the years of educational opportunities lost by children in low-income households due to the pandemic.

“Given the above considerations, can we afford to wait without adequate socio-economic safeguards and certainty, for another 30 years, before reaping the intended benefits of this project, while we navigate an unprecedented public health and economic crisis?”

She also highlighted the decision to allow the project to proceed despite an EIA report confirming that this will result in permanent environmental loss.

In the EIA report for the PSR project, it is stated that: “Permanent destruction and residual impacts will be suffered by the mudflat ecosystem, fishing grounds, turtle landings, and some of the coral reefs on Pulau Rimau. This permanent destruction will have a significant negative impact on fisheries resources, fishermen and the security of the country’s food supply.”

Penang PKR vice-chairman Jason Ong said he hopes the state government will view Nurul Izzah’s feedback in a positive light as many people have good intentions in seeking for the PSR project to be scrapped.

“I think it is time to review the project’s viability. Either we reduce the scope or we seek alternatives for a cheaper transport mode, so we do not need to raise too high of a capital.”

He urged the state government to seek new technologies for public transport and explore the land banks on the mainland for more development. – The Vibes, May 31, 2021

Related News

Off beat / 1d

Penang moves to strengthen position as green manufacturing hub

Events / 1d

Annie Tan looks to keep traditional Asian flavours relevant through modern dining

Community / 3d

Penang looks towards AI for greater sustainability

Events / 4d

PBAPP receives strong support for purchase of treated water

Malaysia / 4d

Interests of Penang and Perak protected under water agreement, says Exco member

Lifestyle / 5d

Chet Singh, a pioneer of Penang's industrial development, dies at 90

Spotlight

Malaysia

Bersama, Bersatu fail to win a seat in Melaka, face questions over political future

By Alfian Z.M. Tahir

Malaysia

African man apologises to Malaysians over machete attack on policeman

Malaysia

Two family members to be charged with murder of elderly man in Negeri Sembilan

Malaysia

Kuching student accused of attacking teacher with a deadly weapon sent for mental observation

People

Hans Isaac engaged to former Miss Universe Malaysia Francisca Luhong in Paris proposal

Malaysia

NS Exco: Palace weighs settlement proposals as court hearing postponed

Malaysia

Police hunt answers after 15-year-old girl shot in neck in Ranau

Malaysia

Missing 74-year-old windsurfer found dead off Tanjung Bungah

You may be interested

Malaysia

PH's Melaka gains point to need for wider political cooperation, says Amirudin

Malaysia

Some 243,501 undocumented migrants sent home under Malaysia's repatriation programme

Malaysia

Mukhriz loses bid to block LHDN’s RM5m tax claim, must pursue statutory appeal

Malaysia

43MWp solar farm underscores growing corporate role in Malaysia’s energy transition

Malaysia

Missing 74-year-old windsurfer found dead off Tanjung Bungah

Malaysia

Foreign woman found dead by river in Bidor suspected murdered

Malaysia

Kuching student accused of attacking teacher with a deadly weapon sent for mental observation

Malaysia

Man shot dead at Penang diesel depot, police on the hunt for suspected co-worker