Malaysia

RM330.9 million channelled for development in Sarawak under 11th Malaysia Plan

Hamzah was responding to a question from Datuk Robert Lawson Chuat (GPS-Betong)

Updated 6 years ago · Published on 12 Nov 2020 1:26PM

RM330.9 million channelled for development in Sarawak under 11th Malaysia Plan
Deputy Minister of Agriculture and Food Industry I Datuk Seri Ahmad Hamzah said the ministry also channelled an allocation of RM6.7 million under the Economic Stimulus Package (PRE) 2020 to several implementing agencies, such as the Sarawak Irrigation and Drainage Department and all IADAs in the state. – The Vibes pic, November 12, 2020

KUALA LUMPUR – The government has channelled RM330.9 million in development allocation for Sarawak under the 11th Malaysian Plan (11MP) which ends this year.

Deputy Minister of Agriculture and Food Industry I Datuk Seri Ahmad Hamzah said the distribution of the allocation was based on the five-year Rolling Plan (RP), beginning with RP1 in 2016 to RP4 in 2020.

He said the ministry,  through the Agricultural Irrigation and Drainage Division (BPSP), had carried out several programmes for the development of agricultural infrastructure in Sarawak through the 11MP.

“Sarawak has huge potential and is able to contribute to the increase in national food production. This is significant with the establishment of four new IADAs (Integrated Agricultural Development Areas) with focus on padi, including the Batang Lupar IADA  in Sarawak.

“To ensure the direction is achieved, MAFI places high commitment and effort in the planning, building and upgrading of agricultural infrastructure facilities throughout the country, including in Sarawak," he said during the question and answer session in the Dewan Rakyat today.

He was responding to a question from Datuk Robert Lawson Chuat (GPS-Betong) on ​​the Agriculture and Food Industry Ministry’s efforts and direction in developing agriculture infrastructure and drainage programmes in Sarawak and the total allocation disbursed to the state under the 11MP.

Ahmad said the ministry also channelled an allocation of RM6.7 million under the Economic Stimulus Package (PRE) 2020 to several implementing agencies, such as the Sarawak Irrigation and Drainage Department and all IADAs in the state.

The fund was channelled to carry out maintenance work on existing agricultural infrastructure and roads in Sarawak, he added. – Bernama, November 12, 2020

Spotlight

Malaysia

Geopolitical tensions must not derail regional economic integration - Anwar

Malaysia

Najib has been given a second chance. But where is the accountability to Malaysians?

By The Vibes Says

Malaysia

PAS joins BN in sitting out Sarawak polls

Malaysia

PAC to probe possible financial breaches, abuse of power in Sabah Pan Borneo project

Malaysia

Landowners cannot demolish unauthorised places of worship themselves, says Nga

By Alfian Z.M. Tahir

Malaysia

Najib’s house arrest: Differing views do not constitute treason – lawyer

Malaysia

Suspected criminal shot dead in exchange of fire with police in Perak

You may be interested

Malaysia

Chow Kit shooting suspect linked to nine robberies since May

Malaysia

Teenager pleads guilty to three sexual offence charges involving 14-year-old girl

Malaysia

Umno’s royal loyalty credentials face test in Negeri Sembilan

Malaysia

Those who breach rules, discipline, standards of conduct must resign - Anwar

Malaysia

Police still tracking witnesses to complete probe into cadet's 2018 death

Malaysia

Police: Kuala Kangsar boarding school student died of strangulation

Malaysia

Mother and child killed in pre-dawn house fire in Batu Pahat

Malaysia

Johor steps up anti-bullying drive after 773 cases recorded in nine months