Malaysia

PSI project to make economy more ‘resilient’: PIC

Will drive creation of 460,000 jobs, generate forecasted GDP of RM2.2 tril in 30 years, firm says

Updated 3 years ago · Published on 28 Apr 2023 9:00AM

PSI project to make economy more ‘resilient’: PIC
The Penang Infrastructure Corporation says the Penang South Islands mega reclamation project – which will be developed with a Low Carbon Cities Framework during its topside development phase and has exceeded emissions reduction of 40% – will boost the state’s economy, making it more resilient for future generations while prioritising sustainability. – PIC Facebook pic, April 28, 2023

by Ian McIntyre

GEORGE TOWN – The special purpose vehicle behind the Penang South Islands (PSI) mega reclamation project insists the development would help boost the state’s economy, despite facing pushback from several quarters.

The Penang Infrastructure Corporation (PIC) said the project is a strategy to make Penang’s economy more resilient for future generations while prioritising sustainability.

In a statement, PIC noted that the first island, named Island A, will feature a 700-acre Green Tech Park designed for high-tech industries of the future. 

It also said the development will also drive the creation of over 460,000 jobs, and generate a forecasted GDP of RM2.2 trillion within a 30-year time frame.

The project, which will be developed with a Low Carbon Cities Framework during its topside development phase, has exceeded the emissions reduction of 40% as advised by the National Planning Council, PIC said.

Further measures that will be implemented include the mandate of the Green Building Index (GBI) certification for the development of individual plots. 

PIC said within the GBI criteria, green building materials, energy and resource-efficient fittings and fixtures, greenery, as well as design innovations will be monitored to reduce the carbon footprint of buildings.

It said concerns about the fisheries and the fate of fishermen have been addressed numerous times in recent years. 

“We would like to reiterate that the fishermen of southern Penang Island can still continue to fish during and after the reclamation,” it said. 

“The project’s implementation will not prevent them from fishing and the usual fishing ground for fishermen in the area are located beyond the reclamation site.”

PIC noted that there are three fishermen engagement centres, known as Pusat Perkhidmatan Setempat Nelayan operating at the site, which provide assistance to them.

It said it has recently helped some 40 fishermen with their insurance and license renewals.

PIC said Penang will continue to implement the Social Impact Management Plan (SIMP), which benefits fishermen located in the south of Penang Island. 

This includes the provision of new larger vessels with more powerful engines, financial aid, skills training, job and business opportunities, new jetties and education support programmes for children of fishermen.

The PSI Ecology Offset Master Plan (PEOM) – which features initiatives such as mangrove planting, deployment of artificial reefs and release of fish and shrimp fries – will also be implemented to mitigate the project’s impact on the environment and create new habitats for marine life, PIC said.

Both the SIMP and PEOM are part of the condition set out in the environmental impact assessment (EIA) approval, it said.

These details can be viewed in the approved EIA report, which has been made available for public viewing on the Penang Infrastructure Corporation website, PIC said. – The Vibes, April 28, 2023

Related News

Tech / 1d

Penang’s Tech Dome celebrates 10th anniversary with opening of new space gallery

Malaysia / 4d

No further delays for water tariff hike in Penang - CM

People / 5d

Penang: Greater efforts needed to record historical events, says nonagenarian

People / 5d

Penang: Eurasian association mourns sudden loss of its president

Malaysia / 5d

Penang signs landmark Perak water deal to secure 40-year supply from 2032

Malaysia / 6d

Penang: Sandbags as temporary measure to curb erosion at Batu Ferringhi

Spotlight

Malaysia

After Johor, the uncomfortable question for Anwar’s critics: Were we too impatient?

By The Vibes Says

Malaysia

Network School's business licences revoked, to cease operations tomorrow

Opinion

Orang Asli in Pahang: Token gestures or genuine recognition?

Malaysia

Tuition teacher sentenced to 105 years in prison and 70 lashes for raping daughter

Malaysia

Azam Baki denies involvement in RM178.29 million contract linked to brother’s company

Malaysia

Aminuddin urges NS voters to weigh manifesto promising benefits for M40 and B40 groups

Malaysia

No need to resign, PM has absolute power if there is doubt – Ahmad Zahid

World

Gaza’s water crisis deepens as families face thirst, disease and collapsing sanitation systems

You may be interested

Malaysia

Mechanic sentenced to 20 years and seven lashes for rape and armed robbery of teenager

Malaysia

Federal Govt passes RM83.46m in flood mitigation, coastal protection projects to Selangor

Malaysia

eFishery loss will not jeopardise KWAP’s finances or pension payments - Tengku Zafrul

Malaysia

KWAP’s eFishery loss triggers governance review as Anwar backs full investigation

Malaysia

PH offers more comprehensive manifesto, benefits all groups

Malaysia

PH pledges 30,000 high-paying jobs, 20,000 affordable homes in Negeri manifesto

Malaysia

Over 3 billion suspicious SMS, 2.5 billion fraudulent calls blocked by MCMC

Malaysia

Man killed in hit-and-run crash while installing party flags in Rantau