World

Thailand pushes RM120 billion Straits of Melaka ‘land bridge’ plan amid shipping route uncertainty

Bangkok to table mega infrastructure proposal to the Thai Cabinet by mid-year, positioning project as strategic alternative to volatile global chokepoints

Updated 3 months ago · Published on 25 Apr 2026 6:27PM

Thailand pushes RM120 billion Straits of Melaka ‘land bridge’ plan amid shipping route uncertainty
The project would link ports on the Andaman Sea with those on the Gulf of Thailand, creating a transshipment corridor between the Indian and Pacific Oceans - April 25, 2026

THAILAND is preparing to advance a trillion-baht “land bridge” megaproject designed to reshape regional shipping routes, with plans to present the proposal to Cabinet by June as concerns grow over potential disruptions at key global maritime chokepoints.

Bloomberg cited Deputy Prime Minister and Transport Minister Phiphat Ratchakitprakarn saying the project, estimated at around 1 trillion baht (RM122.56 billion), would link ports on the Andaman Sea with those on the Gulf of Thailand, creating a transshipment corridor between the Indian and Pacific Oceans.

He said the initiative aligns with the position of Prime Minister Anutin Charnvirakul, who has indicated that the project should proceed in light of possible future instability in the Strait of Hormuz.

Despite criticism that cargo transfers between ports could lengthen delivery times, Phiphat argued that transshipment is already the dominant model in global shipping.

“More than 90 per cent of global container shipping involves cargo transshipment rather than direct end-to-end delivery.

“If cargo is transhipped at Thai ports, it would also need to be transhipped elsewhere, such as in Singapore,” he said, adding that Thailand aims to capture a larger share of regional transshipment traffic.

He confirmed that a feasibility study conducted by the Transport and Traffic Policy and Planning Office has been completed, and that he will conduct a site visit in May ahead of the Cabinet submission.

The project is expected to be opened to both domestic and international investors on equal terms, with the government maintaining that it will not directly finance the development.

Construction could begin as early as the end of this year, pending Cabinet approval, which Phiphat said is likely to be sought between June and July 2026. - April 25, 2026

Spotlight

Malaysia

Private university CFO charged over alleged RM6.56m CBT

World

Unleashed 60kg dog in Hong Kong mauls poodle, bichon frise to death (video)

Malaysia

Three family members killed after Immigration truck runs red light

Malaysia

Woman, believed to be foreigner, allegedly causes disturbance at KLIA (video)

Opinion

Has DAP chosen the path to a slow death?

Malaysia

Three years of bullying at school puts 15-year-old at risk of hearing loss

By Alfian Z.M. Tahir

Malaysia

Police officer's wife cries, pleads for leniency after misusing disabled child's account

Malaysia

Organised cybergroups likely behind rise in racial hate on social media

You may be interested

World

China-Indonesia talks put South China Sea, defence and investment in focus

World

US debt surges past US$40 trillion as Trump presses for lower interest rates

World

Harry and Meghan reportedly set for extended return to Britain, six years after royal exit

World

Fei-Fei Li warns US AI backlash could undermine global leadership and innovation

World

UAE suspends all trade with Iran after renewed missile fire, deepening Tehran’s isolation

World

Iran’s two-pronged strategy: The eradication of US forces in the Gulf and political defeat in Washington

World

US threatens ‘toughest sanctions in history’ on Iran

World

Former Singapore president now thinks twice about patting children after Roxy Square incident