Business

‘Prefab, prefinished construction can reduce reliance on migrant workers’

Method reduces work onsite by up to 80%, notes minister

Updated 3 years ago · Published on 07 Jun 2023 5:49PM

‘Prefab, prefinished construction can reduce reliance on migrant workers’
Datuk Seri Alexander Nanta Linggi says Malaysia needs about 400,000 construction workers and still depends on migrant labour because the work environment is not very preferred by the locals. – ABDUL RAZAK LATIF

KUALA LUMPUR – The prefabricated prefinished volumetric construction (PPVC) method can help reduce the country’s dependence on migrant workers in the construction industry, said Works Minister Datuk Seri Alexander Nanta Linggi.

He said the method could also attract youth in this country to be trained to become skilled workers, due to the more comfortable work environment.

“I was made to understand that local workers prefer this work environment or atmosphere because it is not like a conventional job that requires them to work under the hot sun or outside, which is quite uncomfortable.”

He said this to reporters after witnessing the memorandum of understanding signing ceremony between the Construction Industry Development Board and Malaysian Resources Corporation Bhd (MRCB) here today.

PPVC is a method where 3D modules are assembled complete with internal finishing in the factory before being delivered and installed on-site, which can reduce 70% to 80% of construction work.

According to Nanta, Malaysia needs about 400,000 construction workers and still depends on migrant labour because the work environment is not very preferred by the locals.

Meanwhile, MRCB executive vice-president Datuk Seri Judin Abdul Karim said the PPVC method is considered more advanced than the industrialised building system (IBS).

“IBS is a 2D prefabricated panel and box system that is assembled on a construction site with the aim of reducing up to 30% of the work on site.

“Meanwhile, PPVC transports complete 3D modules to be installed on-site and can reduce 70% to 80% of construction work,” he said. – Bernama, June 7, 2023

Related News

Malaysia / 2y

Highway concessionaires hold absolute rights to toll collection, says minister

Malaysia / 2y

Prioritise our poor: Nanta backs calls to bar Palestinian refugees from Sarawak

Malaysia / 2y

Putrajaya gives nod to S’wak-Sabah-Kalimantan mega-railway project

Malaysia / 3y

Thousands of S’wak natives cut off from outside world as sole link collapses

Malaysia / 3y

King, queen inspect Pan Borneo Highway progress in Sabah

Malaysia / 3y

We’ll stick with M’sian currency: S’wak premier after Nanta’s remarks

Spotlight

Malaysia

Man kidnapped, tortured, and killed following misunderstanding

Malaysia

'I will never forget taxi drivers who backed me in my hardest times' - PM Anwar

Malaysia

Najib fails to secure stay of 15-year jail term, RM11.38b fine in 1MDB case

Malaysia

Ivana Smit’s mother considers Federal Court appeal after RM1.1m award overturned

Education

Schools in Negeri Sembilan, Melaka to reopen tomorrow as haze conditions improve

Malaysia

Zara Qairina inquest: Investigating officer says final findings showed no suspicious circumstances

Malaysia

Man jailed 8½ years for abusing three-year-old boy, forcing the child to eat faeces

World

Pope Leo XIV diagnosed with lung cancer after successful surgery

Malaysia

More than 3,000 Myanmar refugees set for repatriation after Malaysia secures breakthrough

You may be interested

Business

Oil prices rise as Gulf attacks threaten supply recovery

Business

SC targets stronger board oversight through higher standards for company secretaries

Business

SC expands new co-investment fund in 2027 to unlock growth capital for Malaysian businesses

Business

Oil price surge threatens to raise Malaysia’s cost pressures as ringgit steadies