Business

‘Prefab, prefinished construction can reduce reliance on migrant workers’

Method reduces work onsite by up to 80%, notes minister

Updated 3 years ago · Published on 07 Jun 2023 5:49PM

‘Prefab, prefinished construction can reduce reliance on migrant workers’
Datuk Seri Alexander Nanta Linggi says Malaysia needs about 400,000 construction workers and still depends on migrant labour because the work environment is not very preferred by the locals. – ABDUL RAZAK LATIF

KUALA LUMPUR – The prefabricated prefinished volumetric construction (PPVC) method can help reduce the country’s dependence on migrant workers in the construction industry, said Works Minister Datuk Seri Alexander Nanta Linggi.

He said the method could also attract youth in this country to be trained to become skilled workers, due to the more comfortable work environment.

“I was made to understand that local workers prefer this work environment or atmosphere because it is not like a conventional job that requires them to work under the hot sun or outside, which is quite uncomfortable.”

He said this to reporters after witnessing the memorandum of understanding signing ceremony between the Construction Industry Development Board and Malaysian Resources Corporation Bhd (MRCB) here today.

PPVC is a method where 3D modules are assembled complete with internal finishing in the factory before being delivered and installed on-site, which can reduce 70% to 80% of construction work.

According to Nanta, Malaysia needs about 400,000 construction workers and still depends on migrant labour because the work environment is not very preferred by the locals.

Meanwhile, MRCB executive vice-president Datuk Seri Judin Abdul Karim said the PPVC method is considered more advanced than the industrialised building system (IBS).

“IBS is a 2D prefabricated panel and box system that is assembled on a construction site with the aim of reducing up to 30% of the work on site.

“Meanwhile, PPVC transports complete 3D modules to be installed on-site and can reduce 70% to 80% of construction work,” he said. – Bernama, June 7, 2023

Related News

Malaysia / 2y

Highway concessionaires hold absolute rights to toll collection, says minister

Malaysia / 2y

Prioritise our poor: Nanta backs calls to bar Palestinian refugees from Sarawak

Malaysia / 2y

Putrajaya gives nod to S’wak-Sabah-Kalimantan mega-railway project

Malaysia / 2y

Thousands of S’wak natives cut off from outside world as sole link collapses

Malaysia / 2y

King, queen inspect Pan Borneo Highway progress in Sabah

Malaysia / 2y

We’ll stick with M’sian currency: S’wak premier after Nanta’s remarks

Spotlight

Malaysia

Anwar congratulates Modi on becoming India's longest-serving elected PM

Malaysia

Missing jewellery: Rosmah ordered to pay RM67.5 million

People

Malay kampongs in Bangkok: Echoes of southern heritage in Thailand’s capital

Opinion

Johor MB’s exclusionary rhetoric betrays the people, exposes UMNO’s political hypocrisy

Malaysia

Johor and NS polls first major test of post PAS-Bersatu political order

Malaysia

Claimed installation of 12th N. Sembilan ruler invalid - Pengelola Bijaya Diraja

Malaysia

4WD driver who drove backwards on highway nabbed, positive for drugs (video)

By Ian McIntyre

Malaysia

Seven in ten Malaysian workers earn RM5k or less - economist

You may be interested

Business

Ringgit strengthens as easing Middle East tensions weigh on US dollar

Business

Open fibre sues Bank Pembangunan, six others in RM2b claim over Aries telecoms liquidation

Business

Ringgit holds firm against major currencies as markets await key US inflation data

Business

BNM's OPR to stay at 2.75 pcent in 2026 amid strong domestic demand - Kenanga IB