Malaysia

Singapore solely responsible for Linggiu Dam safety, PETRA Dep Minister says

Singapore’s PUB conducts annual inspections and five-yearly comprehensive assessments of the Johor dam, which falls outside Malaysia’s National Dam Centre monitoring scope

Updated 52 minutes ago · Published on 13 Oct 2026 1:40PM

Singapore solely responsible for Linggiu Dam safety, PETRA Dep Minister says
PETRA responds to concerns over the dam’s safety following the recent Nepal-flood disaster being linked to infrastructure management and extreme climate events - October 13, 2026

SINGAPORE’S Public Utilities Board (PUB) is solely responsible for the management, maintenance and safety monitoring of Linggiu Dam in Johor under bilateral water agreements, the Energy Transition and Water Transformation Ministry (PETRA) tells the Dewan Rakyat today.

PETRA Deputy Minister Datuk Seri Abdul Rahman Mohamad said PUB inspected the dam annually and conducted comprehensive inspections every five years involving certified dam inspectors, with safety updates presented periodically to Johor’s Water Regulatory Body (BAKAJ).

These arrangements allow the dam’s structural integrity and safety requirements to be assessed, with follow-up action identified where necessary, it said in a written parliamentary reply to Tenggara MP Manndzri Haji Nasib.

Abdul Rahman was responding to concerns over the dam’s safety and the effectiveness of Malaysia’s dam safety Flying Squad following a recent debris-flood disaster in Nepal linked to concerns over infrastructure management and extreme climate events.

The Flying Squad operated from 2018 to 2022 and inspected 41 dams nationwide.

In 2025, Malaysia established the National Dam Centre (PEN) to strengthen national dam safety management through inspections, technical support, coordination with dam owners and operators, and assessments of safety practices.

PEN monitors 107 dams managed by agencies and operators under Malaysian authorities, but Linggiu Dam is excluded because it is operated by Singapore’s PUB.

He said requests for information or technical coordination concerning Linggiu Dam’s safety and structural integrity must therefore be channelled through BAKAJ and PUB, subject to the parties’ respective jurisdictions and agreement.

Abdul Rahman added that the ministry, through PEN, would continue working with the Johor government and relevant agencies to examine and address identified dam safety issues, particularly those affecting communities downstream.

Linggiu Dam operates under the Johor River Water Agreement 1962 and a 1990 supplementary agreement, both signed by the Johor State Secretary on behalf of the Malaysian government, the deputy minister explained. - October 13, 2026

Spotlight

Malaysia

Tuanku Muhriz to focus on state affairs; Will not attend Conference of Rulers meeting

Malaysia

Sarawak projects record RM15.09b revenue, budgets RM10.1b for development in 2027

Malaysia

Sultan Nazrin: Delay in environmental action places future generations at risk

Malaysia

Woman allegedly raped at KL shopping centre after being threatened with intimate video

Malaysia

Jordan’s King confers highest civilian honour on Sultan Ibrahim

Malaysia

Driver monitoring aims to stop commercial vehicle crashes before they happen

Malaysia

KTMB heritage sites set for tourism makeover, says Loke

Malaysia

Zara Qairina’s mother: No doctors recorded injuries consistent with being beaten

You may be interested

Malaysia

Rantau Panjang MP injured in accident

Malaysia

Lawyers warn of civil suits over claims linking police officers to crime syndicate

Malaysia

19-year-old charged with murdering student in Kuantan

Malaysia

Govt challenges US excess-capacity concerns as 100% chip tariff threat looms

Malaysia

Music royalty transparency reforms remain blocked by legal challenge - Amirzan

Malaysia

Saudi Arabia braces for further Houthi attacks as Riyadh projects normalcy

Malaysia

Sultan Nazrin: Delay in environmental action places future generations at risk

Malaysia

MCMC hunts creators of insulting image of King after Threads takedown