Malaysia

Road tax disc shortage resolved, says transport minister

Accumulated backlog involving 3.5 mil applications set to be eased by next month, assures Datuk Seri Wee Ka Siong

Updated 5 years ago · Published on 24 May 2021 9:00AM

Road tax disc shortage resolved, says transport minister
Transport Minister Datuk Seri Wee Ka Siong says those whose road taxes had expired in March and April will be getting their road tax discs by this month and the next. – Bernama pic, May 24, 2021

KUALA LUMPUR – The shortage of road tax discs, which has seen motorists driving with expired road taxes, is being resolved as economic sectors continue to remain open under the movement control order (MCO).

Transport Minister Datuk Seri Wee Ka Siong said those whose road taxes had expired in March and April will be getting their road tax discs by this month and the next.

The accumulated backlog of applications for the discs, including for competent driving licences, involve some 3.5 million applications.

“We have resolved it. After this, the road tax discs will be available to motorists. We understand the public’s apprehension, but they have nothing to worry about,” Wee told The Vibes recently.

He said the problem is multifold, including that the MCO has impacted the supply chain and processes, as well as other outstanding issues that have been resolved.

The second and third MCOs have seen counter operations at Road Transport Department (RTD) branches being disrupted as road tax renewal is not regarded as essential.

Post offices nationwide have also ceased road tax renewal services during the MCO.

Motorists are still allowed to operate their vehicles as long as they have renewed their motor insurance. Hence, it is crucial for them to have the latest insurance cover note when operating their vehicles, and they need to present it to the authorities, such as police and RTD personnel, at roadblocks.

This is not the first time there has been a shortage of road tax discs in recent times.

In 2017, there was a nationwide shortage that stemmed from the contractor’s inability to cope with demand. It took two months to resolve the issue. – The Vibes, May 24, 2021

Related News

Malaysia / 2mth

Cabinet approves 17 measures to beef up KLIA security checks, controls

Malaysia / 5mth

MOT submits proposal to MTEN to study road tax reduction mechanism

Malaysia / 5mth

Government considering lowering road tax on diesel vehicles to help the people

Malaysia / 6mth

Lawyer caught driving Ford Mustang without road tax – second time in a month

Malaysia / 8mth

Woman in Bentley says she ‘overlooked’ road tax, insurance renewal

Malaysia / 8mth

RTD ends physical road tax slip printing from Feb 1, 2026

Spotlight

Off beat

Afdlin Shauki, family trapped for five hours amid Paris unrest

Malaysia

10 former Negeri Excos file application in Federal Court to challenge revocation of appointments

Malaysia

Perlis MB Abu Bakar suspended from Bersatu for two election terms

Malaysia

Shuhaily says public support gives him strength as he faces two charges

Malaysia

Mohd Shuhaily pleads not guilty to assaulting 2 cops

Places

Penang makes National Geographic list of top 25 cities worldwide to visit

By Ian McIntyre

Malaysia

Two held after 16-year-old girl rescued in suspected sex exploitation case

Malaysia

Takiyuddin blames Bersatu for PN deregistration

Malaysia

Interpol issues Red Notice for Serba Dinamik CEO, Anwar says

You may be interested

Malaysia

Anwar responds to young Ammar’s plea for prayers ahead of surgery

By Alfian Z.M. Tahir

Malaysia

RM2.1b rural road overspending triggers contractor payment delays, new project freeze

Malaysia

Woman’s RM4,000 childbirth bill drops to RM130 with blood donor benefits

Malaysia

Nine wanted over online prostitution syndicate arrested in Malaysia

By Alfian Z.M. Tahir

Malaysia

PH to contest Melaka polls solo, rules out cooperation with Bersatu

Malaysia

Budget 2027 debate resumes as MPs seek answers on MyKad security, haze and semiconductor jobs

Malaysia

Former Temerloh police chief jailed eight months for receiving RM69,600 in bribes

Malaysia

Government open to RCI into KWAP, EPF if evidence warrants probe