Malaysia

RM6 bil ART route between Kuching, Serian waste of money: PSB chief

Many S’wakians still living in poverty, lack access to necessities, says party president

Updated 3 years ago · Published on 17 Dec 2022 4:45PM

RM6 bil ART route between Kuching, Serian waste of money: PSB chief
Parti Sarawak Bersatu president Datuk Seri Wong Soon Koh says the RM6 billion Autonomous Rail Transit project connecting Kuching to Serian attracted much publicity but was an unnecessary waste of public funds. – Wikipedia pic, December 17, 2022

by Stephen Then

MIRI – Local opposition Parti Sarawak Bersatu (PSB) is opposing the state’s RM6 billion Autonomous Rail Transit (ART) project for a short 40km route, calling it wasteful when there are still 90,000 Sarawakian households living below the poverty line.

PSB president Datuk Seri Wong Soon Koh said the project connecting Kuching to Serian attracted much publicity but was an unnecessary waste of public funds.

He slammed Sarawak Premier Tan Sri Abang Johari Openg over the project, saying this was the latest in addition to other “far-fetched” projects like starting a hydrogen economy and a boutique airline.

“Kuching to Serian is only 40km long and there is already a good Pan Borneo Highway connection that people can drive along.

“Why is there a need to spend RM6 billion for the Kuching-to-Serian ART project? Also, the eventual costs may rise even higher eventually.

“The premier and the Gabungan Parti Sarawak (GPS) state government should get their priorities correct.

“Latest statistics showed there are at least 90,000 Sarawakian families living below the poverty line throughout the state.

“Many parts of Sarawak still have no proper roads, no electricity, no treated water supply, no proper housing, no proper medical and health facilities, no proper schools...yet GPS want to spend billions of ringgit just for the 40km-route between Kuching and Serian,” he said at a press conference in PSB headquarters in Kuching today.

Wong, who is also Bawang Assan assemblyman, said GPS had done little to improve living costs in Sarawak and yet still want to pursue “wasteful mega projects”.

Earlier this week, Abang Johari witnessed an official ceremony to kickstart the ART project that will be financed by the state government. – The Vibes, December 17, 2022

Related News

Malaysia / 23h

Haze: Emergency only in areas with API of 500, not the whole of Sarawak

Malaysia / 23h

Sarawak: EC to display proposed 17 new state assembly seats tomorrow

Malaysia / 1d

Air quality in 4 Sarawak areas hit hazardous levels

Opinion / 2d

Merdeka: This is our Malaysia – and you will not take it from us

Malaysia / 1w

API below 200: All schools in Sarawak will reopen tomorrow

Events / 1w

Sarawak wins second M&C Asia Stella Award for sustainability

Spotlight

Malaysia

Singapore could bar under-18s from social media platforms that fail safety test

Malaysia

College student dies after falling from 22nd-floor condominium in Setapak

Malaysia

PM praised for ‘Medeka Day’ reforms; More needed to cope with rising costs – Guan Eng

By Ian McIntyre

World

Tupac Shakur murder case ends after 30 years as ex-gang leader found guilty

Malaysia

Unidentified man found dead in Sungai Buloh drain as police probe suspected murder

Malaysia

Four killed, four injured in 11-vehicle Pahang highway crash

Malaysia

Sarawak haze crisis deepens as five areas hit hazardous air quality

Opinion

Would the United States use nuclear weapons against Iran?

Malaysia

Tajikistan eyes bigger role for Malaysia in Central Asian market

By Alfian Z.M. Tahir

You may be interested

Malaysia

Sarawak: EC to display proposed 17 new state assembly seats tomorrow

Malaysia

Palm oil entrepreneur loses nearly RM250,000 to fake investment scheme

Malaysia

AI could become Malaysia’s next productivity engine — from SMEs to public services

Malaysia

BUDI MADANI: Who gets 300 litres — and who can get 400 litres from September 1?

Malaysia

Rosmah allowed to introduce fresh evidence in solar project appeal

Malaysia

3-year-old injured after leg run over by fire dept vehicle during Merdeka parade

Malaysia

Zahid: RM6b funding gap forces rural ministry to rethink development priorities

Malaysia

Haze: Emergency only in areas with API of 500, not the whole of Sarawak