Malaysia

Better project management led to faster completion of Pan-Borneo Highway in Sarawak, says minister

Linggi explains why work on transboundary project is lagging in Sabah.

Updated 2 years ago · Published on 26 Jun 2024 1:57PM

Better project management led to faster completion of Pan-Borneo Highway in Sarawak, says minister
The Pan-Borneo Highway is 99% completed in Sarawak, compared to 87% in Sabah. – The Vibes file pic, June 26, 2024.

by Jason Santos

BETTER project management led to the quicker completion of the Pan-Borneo Highway in Sarawak, Public Works Minister Datuk Alexander Nanta Linggi said.

He said that Sarawak opted to build the highway in only 11 packages, which were easier to manage, in contrast to the 35 packages to build the highway in Sabah.

Linggi was responding to the claim that the Sarawak part of the highway was more quickly completed because the works minister is from the state.

Datuk Seri Ronald Kiandee (Beluran-PN) made the claim, which  Linggi denied.

"A factor is land acquisition, which is easier in Sarawak because the alignment does not require extensive land acquisition," Linggi said.

"Additionally, utility relocation was more difficult in Sabah than in Sarawak. There are many factors that make implementation in Sarawak easier, and because of that, its management was more straightforward."

He said that while it is not unusual for contractors to jostle for a piece of the Pan-Borneo Highway project, he was aware of the lobbying by interested parties.

As of February, the highway is 99% completed in Sarawak, compared to 87% in Sabah.

Earlier, Linggi said four contractors were appointed to undertake the building of portions of of Pan-Borneo Highway phase 1B in Sabah.

Linggi said the three-year delay for the Serusup to Pituru package was because of a search for qualified contractors. – June 26, 2024.

Spotlight

Malaysia

‘No such thing as Bangkok Move or Dubai Move’ – Ahmad Zahid

Malaysia

KSN: Rectify long waiting times, service challenges and workforce constraints at UMMC now

Malaysia

LGE trial: 4 to 5 meetings held before open tender bidding for road, undersea tunnel projects - witness

Malaysia

Najib marks 73rd birthday as legal battles continue from behind prison walls

Malaysia

Court orders police to probe foreign management institute

Malaysia

UMNO pushes back against Hamzah’s ‘PBN’ proposal, says BN-PN cooperation is not a new coalition

Malaysia

Form four student killed after car crosses into opposite lane in Setiu crash

World

France heatwave death toll rises to nearly 5,800 as extreme temperatures trigger record mortality

Culture

Penang: Three refurbished tourism attractions to be ‘reopened’ soon

By Ian McIntyre

You may be interested

Malaysia

LGE trial: 4 to 5 meetings held before open tender bidding for road, undersea tunnel projects - witness

Malaysia

‘No such thing as Bangkok Move or Dubai Move’ – Ahmad Zahid

Malaysia

PKR man says resignation calls should not become political theatre, urges leaders to show principle

By Alfian Z.M. Tahir

Malaysia

Muhyiddin rejects Khaled’s 'kacau daun' jibe, says Bersatu is in Negeri to win

Malaysia

Police dismantle violent Vinod gang after 11 suspects arrested in Selangor ops

Malaysia

Anwar signals release of Tabung Haji RCI report

Malaysia

Govt works on Budget 2027 as Anwar faces subsidy costs, fiscal pressures and living cost challenges

Malaysia

Johari holds first talks with USTR Greer to balance US trade measures