Malaysia

Putra Heights fire: Victims can appoint independent contractors for repairs - Selangor MB

Selangor Menteri Besar, Datuk Seri Amirudin Shari said the facility was given to homeowners with an estimated total  not exceeding RM30,000.

Updated 1 year ago · Published on 26 Jun 2025 6:15PM

Putra Heights fire: Victims can appoint independent contractors for repairs - Selangor MB
Owners involved were then allowed to submit claims for the repair work to the state government - June 26, 2025

VICTIMS of the gas pipe explosion and fire in Putra Heights, Subang Jaya have been given the flexibility to appoint independent contractors to carry out reconstruction work on their homes affected by the incident.

Selangor Menteri Besar, Datuk Seri Amirudin Shari said the facility was given to homeowners with an estimated total  not exceeding RM30,000.

He said the owners involved were then allowed to submit claims for the repair work to the state government through the local authority (PBT).

However, he said, the repair work on houses that suffered damage worth more than RM30,000 would be handled by contractors appointed by the state government - either Sime Darby Property or Syarikat Perumahan Negara Berhad (SPNB).

“There is no difference (for the reconstruction work on houses affected by the incident). All use the same claim method.

“Reconstruction and repair of damage exceeding RM30,000 in Putra Heights is handled by Sime Darby as the area developer.

"For minor damage under RM30,000, homeowners are given the opportunity to appoint their own contractors and submit claims based on specifications provided by the Public Works Department (JKR).

"For (the affected houses in) Kampung Kuala Sungai Baru, SPNB under the Ministry of Housing and Local Government will carry out this task (repairing damaged homes)," he said as reported by Berita Harian.

Previously, the media reported that approximately RM40 million had been allocated by the Federal Government for the repair work of houses affected by the incident, with the process starting at the end of April.

In the incident on April 1, 81 houses were completely destroyed with structural damage exceeding 40 percent, another 81 were partially destroyed, 57 homes were affected but not damaged, while 218 other homes were not affected, including in Kampung Tengah, Puchong.

Meanwhile, Amirudin, who is also the Sungai Tua State Assemblyman (ADUN) said that the repair work of houses affected by the incident is estimated to be completed according to different time frames.

“Some have already been completed for minor damage. For damage to the structure of the house, it is expected to take 12  to 18 months, depending on the scale of the damage,” he said. - June 26, 2025

Related News

Malaysia / 1w

10 PH assemblymen, 2 DUN coordinators ordered to return allocations – Negeri MB

Malaysia / 2w

Putra Heights tragedy report expected to be released as early as October

Events / 3w

Selangor turns focus to AI, semiconductors as Techsphere Summit returns

Malaysia / 3w

Kedah may delay Penang lease claim documents till change of federal government

Malaysia / 4w

Selangor MB apologises for police escort's behaviour towards road user (video)

Malaysia / 4w

Negeri Sembilan mulls deputy Exco posts as Ismail settles new state cabinet

Spotlight

Malaysia

Four teenagers feared drowned at Tanjung Lompat

World

Thailand to halve visa-free stay to 30 days for 60 countries from Sept 15

Malaysia

Woman injured as concrete debris falls from George Town heritage building

Malaysia

Collision between tanker and ferry under investigation - PPC

By Ian McIntyre

Malaysia

Anwar’s six measures offer relief across the everyday economy

By Alfian Z.M. Tahir

Malaysia

Mahathir’s Merdeka appearance sparks social media debate

By Alfian Z.M. Tahir

You may be interested

Malaysia

Woman injured as concrete debris falls from George Town heritage building

Malaysia

PM orders probe after Temerloh crash kills family of three and another motorist

Malaysia

Under attack – but not silenced

By The Vibes Says

Malaysia

Penang, Thai cops seize drugs worth over RM4m in joint operation

By Ian McIntyre

Malaysia

MACC opens seven investigation papers in FELDA, FIC cases

Malaysia

RCI TH: MACC seeks remand of former minister

Malaysia

PETRA overhauls urban drainage strategy as climate risks intensify

Malaysia

US overcapacity ruling could raise costs, hit Malaysia’s export competitiveness