Malaysia

Penang LRT Sea Link Plan opens to public scrutiny as MRT Corp unveils revised 29.67km scheme

A six-kilometre cross-channel connection between Komtar and Penang Sentral forms the centrepiece of amendments now subject to a statutory three-month public inspection.

Updated 7 months ago · Published on 21 Feb 2026 4:17PM

Penang LRT Sea Link Plan opens to public scrutiny as MRT Corp unveils revised 29.67km scheme
Extension follows an earlier announcement by Prime Minister Datuk Seri Anwar Ibrahim to expand the alignment across the strait in order to strengthen transport integration within Penang - February 21, 2026

MALAYSIA Rapid Transit Corporation Sdn Bhd has opened a three-month public inspection on sweeping revisions to the Penang Light Rail Transit Mutiara Line, placing a proposed six-kilometre sea crossing between the island and mainland at the heart of the updated scheme.

The consultation, which runs from 24 February to 24 May 2026 under Section 85 of the Land Public Transport Act 2010, invites feedback on changes to the alignment, station configuration and overall scope of the project, which is now set to span 29.67 kilometres.

Central to the revised plan is a new cross-sea rail link between Komtar on Penang Island and Penang Sentral on the mainland.

The journey across the channel is expected to take approximately eight minutes, significantly enhancing connectivity between the two sides of the state.

The extension follows an earlier announcement by Prime Minister Datuk Seri Anwar Ibrahim to expand the alignment across the strait in order to strengthen transport integration within Penang.

In its statement, MRT Corp said the public inspection would be supported by physical exhibitions.

“Exhibition booths will be set up at several key locations, including Kompleks Tun Abdul Razak (Komtar), Penang Sentral, and Butterworth KTM station,” the statement read.

Penang Sentral is positioned as the principal mainland gateway under the revised plan. MRT Corp said the station would anchor a multimodal hub integrating ferry services, KTMB rail and existing bus networks.

“Penang Sentral will serve as the main station in Seberang Perai and function as a multimodal transport hub integrating ferry services, KTMB rail, and existing bus networks,” MRT Corp added.

“As part of the revised scheme, there will also be a provision of approximately 1,000 additional parking bays at Penang Sentral.

“From this hub, passengers can continue directly to Komtar, the Bayan Lepas Free Industrial Zone, and Penang International Airport,” the statement read.

The amendments also reflect changes to the broader development landscape, notably the downsizing of the Penang South Reclamation project from three reclaimed islands to one.

Consequently, 3.15 kilometres of the original alignment within the reclaimed area and three planned stations, designated A2, A3 and A4, have been removed from the scheme.

Nevertheless, a 1.5-kilometre stretch of track will be retained on the reclaimed island. Station A1, known as PSR-A, has been reclassified as a provisional station to accommodate future demand as the area develops.

Additional changes include the incorporation of a station at Penang Sentral, a provisional stop at Bagan Luar and the construction of a secondary depot at the Sungai Dua Festival Site for train stabling.

Construction of the Mutiara Line began in 2025, with operations scheduled to commence in December 2031. Once completed, the line will comprise 20 permanent stations and two provisional stations, PSR-A and Bagan Luar.

MRT Corp said those unable to attend the exhibition booths may review project materials and submit feedback online via mymrt.com.my during the inspection period. Further enquiries may be directed to the customer service hotline at 1-800-88-6782. - February 21, 2026

Spotlight

Malaysia

Tuanku Muhriz to focus on state affairs; Will not attend Conference of Rulers meeting

Malaysia

Sarawak projects record RM15.09b revenue, budgets RM10.1b for development in 2027

Malaysia

Sultan Nazrin: Delay in environmental action places future generations at risk

Malaysia

Woman allegedly raped at KL shopping centre after being threatened with intimate video

Malaysia

Jordan’s King confers highest civilian honour on Sultan Ibrahim

Malaysia

Driver monitoring aims to stop commercial vehicle crashes before they happen

Malaysia

KTMB heritage sites set for tourism makeover, says Loke

Malaysia

Zara Qairina’s mother: No doctors recorded injuries consistent with being beaten

You may be interested

Malaysia

MCMC probes Facebook post suspected of insulting Islam

Malaysia

Zara Qairina’s mother: No doctors recorded injuries consistent with being beaten

Malaysia

Ex-school principal sells land, takes loans before losing RM1.1m in investment scam

Malaysia

One of five suspects arrested over helmet attack on 23-year-old in Sabah

Malaysia

Eligibility for PTPTN repayment deferment to be verified with LHDN

Malaysia

Rantau Panjang MP injured in accident

Malaysia

Unhealthy air spreads across 15 locations

Malaysia

Budget 2027 debate begins as MPs press government on healthcare, exports and unpaid KPF shares