Malaysia

RM150 mil needed to fix roads damaged by floods, landslides: Bung Moktar

Up to RM40 million needed to restore Kinabalu Park parking lot, says DCM

Updated 5 years ago · Published on 24 Jan 2021 4:29PM

RM150 mil needed to fix roads damaged by floods, landslides: Bung Moktar
Sabah Works Minister Datuk Seri Bung Moktar (second left) inspecting the Kinabalu Park parking lot that had collapsed due to landslide. – REBECCA CHONG/ The Vibes pic, January 24, 2021

by Rebecca Chong

RANAU – After two weeks of floods and landslides, 17 roads and a bridge are in desperate need for repairs in Sabah, estimated to cost RM150 million, said Deputy Chief Minister Datuk Seri Bung Moktar Radin.  

“Let’s fix all the damaged roads first and figure out a way to get funds from the federal government.

“Some repairs are under the Public Works Department and some are the responsibility of the concessionaires.  

“As for the source of funding… we’ll see. The state government will seek federal government’s assistance.”

Earlier about 100 roads in the state were inaccessible but most have been repaired.

Bung was inspecting the Kinabalu National Park parking lot here that was seriously damaged on Wednesday.  

He said repairs for the parking lot will take some time as it involves a study by geologists and PWD.  

“We do not want to rebuild it, only to have it collapse again. We want to ensure that it will be safe.”

As for the KM20 of Jalan Ranau-Tamparuli that was damaged by landslide last Wednesday, Bung said a temporary road has been set up, but there is no permanent alternative to connect Kota Kinabalu to Ranau.  

“This is the main road, and it is important. We will speed up the repair process, and it is going to cost RM30 to RM40 million, which we will acquire from the federal government.  

“It is also important for the tourism sector as it connects people to Kundasang, which receives a high number of visitors each year,” he said.  

Meanwhile, Bung said PWD has fixed the Talaga bridge in Pitas, and the team has now moved to a disconnected village, Kg Liu, to fix a damaged road and bridge.  

“We hope the good weather will hold as bad weather has been the biggest obstacle to repairs.” – The Vibes, January 24, 2021

Related News

Opinion / 4d

The Malaysia Agreement 1963: Grievances and expectations in Sabah and Sarawak

Malaysia / 1w

Budget 2027: Sabah, Sarawak to receive RM34.9b in federal allocations next year

Events / 1w

Sarawak and Sabah play key roles in weathering climate change

Malaysia / 2w

Address security concerns and let concert proceed – former Sabah CM

Malaysia / 1mth

A message from our publisher and chairman

Malaysia / 1mth

Sabah leaders condemn priest and nun joke at UMNO PAU

Spotlight

Malaysia

Bersama suspends Nik Nazmi from party activities for three months

Malaysia

‘We have better things to do than orchestrate khalwat raids’ - Amirudin

Malaysia

Social media posts ‘emerge’- defending Ismail after Tuanku Muhriz’s public rebuke

World

Trump’s Muhammad joke about Iran presidency falls flat at Georgia rally

Health

Haze can cause life-threatening lung inflammation in cats and dogs, vet warns

World

Australia detects deadly H5N1 bird flu on Macquarie Island, threatening elephant seals

Malaysia

Agong warns against using social media to spread hatred, insult others

Malaysia

Nik Nazmi acknowledges he is the individual detained by JAIS

You may be interested

Malaysia

Target employers and corrupt networks, not just illegal migrants at 224 hotspots - MCW

Malaysia

Sabah seeks immediate payment of undisputed 40% revenue claim from 2022

Malaysia

Warning: MOF debunks viral poster claiming QR payment charges start on Nov 1

Malaysia

Najib fund draws questions for UMNO as UM student faces online threat

Malaysia

DAP lawmakers’ risk being dropped as party tightens KPI checks ahead of GE16

Malaysia

Nine suspicious packages at Negeri schools found to contain flour, plastic plates

Malaysia

PKR restructures Sarawak leadership to strengthen election machinery

Malaysia

Najib house arrest rules near completion, but ex-PM remains in prison