Malaysia

Pahang gets RM1.8 bil for flood mitigation, coastal erosion projects

These are carried forward plans under 12MP, says environment and water minister

Updated 5 years ago · Published on 15 Apr 2021 10:00PM

Pahang gets RM1.8 bil for flood mitigation, coastal erosion projects
Environment and Water Minister Datuk Seri Tuan Ibrahim Tuan Man says the allocation is also for dam and reservoir projects, as well as forecasting and flood warning programmes. – File pic, April 15, 2021

KUANTAN – A total of RM1.8 billion has been allocated to the state Irrigation and Drainage Department through carried forward projects under the 12th Malaysia Plan (12MP) for addressing coastal erosion and mitigating floods in the state.

Environment and Water Minister Datuk Seri Tuan Ibrahim Tuan Man said the allocation is also for dam and reservoir projects, as well as forecasting and flood warning programmes.

Among the approved projects are the coastal erosion control project in Kg Tg Batu, Sg Pahang corridor rehabilitation plan in Pekan, Sg Triang and Sg Semerting corridor rehabilitation plan for Mukim Pelangai in Bentong, and Bandar Bera environmentally friendly drainage master plan, he added.

He said a pilot project costing RM6.07 million to control soil erosion and silting in Cameron Highlands has also been approved under 12MP.

“I hope the allocation will, to some extent, reduce the risk of floods and improve the drainage system this year.”

Tuan Ibrahim said RM13.875 million was channelled to the department in March – with RM12.075 million of the total allocated to carry out river conservation works, and RM1.8 million to carry out studies on the Sg Lembing flood mitigation plan.

“I hope the contractors who succeed in getting the projects can carry them out responsibly, meet the conditions that have been set, and complete them within the given period,” he said, adding that this ias among the ministry’s efforts to revive the economy and help the people. – Bernama, April 15, 2021

Related News

Malaysia / 1w

Pahang hospitals test drones to deliver blood samples

Malaysia / 1w

Pahang police reject claims of drug cartel operating in Genting Highlands

Opinion / 1mth

Orang Asli in Pahang: Token gestures or genuine recognition?

Malaysia / 4mth

Private Amirul's death: Police have called 16 witnesses

Malaysia / 5mth

Be patient, exercise caution when driving home for Aidilfitri - Pahang Sultan

Malaysia / 7mth

Doctor loses RM285k in phone scam

Spotlight

Anwar unveils six measures for Malaysians ahead of Merdeka

By Alfian Z.M. Tahir

Malaysia

Xavier Jayakumar warns racial, religious politics could erode Malaysia’s unity

Malaysia

DOE: Close schools, kindergartens if API tops 200

Malaysia

WhatsApp messages help rescue of two brothers lost in Bukit Putus

Malaysia

King grants audience to Anwar, briefed on Merdeka Day preparations

Opinion

Merdeka: This is our Malaysia – and you will not take it from us

By Vinod Sekhar

World

Covid-19 fears return in South Korea as mask, test kit sales surge

World

91 Malaysians still unaccounted for after Nepal-China floods

You may be interested

Malaysia

Wisma Putra: 72 Malaysians safe in Tibet, 91 still uncontactable after Nepal disaster

Malaysia

G25: Merdeka is a time to strengthen institutions, not just celebrate progress

By Alfian Z.M. Tahir

Malaysia

Anwar: Economic and technological progress means little without morality, justice

Malaysia

Desa ParkCity tragedy: Boy, girl stabbed in the neck, say cops

Malaysia

Minister seeks answers over death of girl with heart condition

By Alfian Z.M. Tahir

Malaysia

Budget 2027 to fortify Malaysia against global economic shocks

Malaysia

Nepal flood toll exceeds 500 as Malaysia mobilises to locate 55 missing nationals

Malaysia

MP demands IGP explain ‘double standards’ in Jalur Gemilang cases