Malaysia

Ampang LRT disruption to continue until Sept: Loke

Two months needed for strengthening work, five for comprehensive repairs, says minister

Updated 3 years ago · Published on 22 Feb 2023 11:52AM

Ampang LRT disruption to continue until Sept: Loke
Services on the route between the Masjid Jamek and Bandaraya LRT stations have been discontinued temporarily due to structural damage to the flyover in the area, believed to be the result of construction work adjacent to the area concerned. – ABDUL RAZAK LATIF/The Vibes file pic, February 22, 2023

KUALA LUMPUR – Ampang LRT users will have to put up with the disruption between its Bandaraya and Masjid Jamek stations until September as the structural repairs will take up to seven months to complete.

Transport Minister Anthony Loke said two months are needed for work to strengthen the structure, while five months are for comprehensive repair work.

“This will take time as investigations showed that the structural damage poses a very serious safety risk,” said Loke in a press conference in Parliament today.

He added that Prasarana Malaysia Bhd will implement mitigating steps to avoid such disruptions in the future, and make sure users are comfortable at all times. 

“When the Putrajaya MRT line opens in mid-March, commuters on the Ampang and Sri Petaling LRT line can use interchange stations such as Chan Sow Lin, Titiwangsa, and Sg Besi as alternatives.”

Previously, Ampang LRT operator Rapid Rail Sdn Bhd said preliminary observations indicated the structural damage to the flyover in the area was believed to be the result of construction work adjacent to the area concerned.

Services on the route between the Masjid Jamek and Bandaraya LRT stations have been discontinued temporarily.

When asked about the possible action against the developer, the minister said the repairs are priority.

“We have to bear the cost of the repairs first, as we cannot afford to wait for the compensation from legal action.

“However, once we get evidence, we reserve the right to take necessary legal action against them,” said Loke. 

He added that he hopes the local authorities in charge of construction will consult the Land Public Transport Agency if their works are near any railway protection zones. – The Vibes, February 22, 2023

Related News

Malaysia / 5mth

Domestic flight capacity increases ahead of Hari Raya - Loke

Malaysia / 6mth

DAP’s July 12 congress: An indication of deeper unease within the party?

Malaysia / 2y

Airlines to refund consumers for flight delays soon, says Anthony Loke

Malaysia / 2y

B1, B2 licences can be upgraded to Class B now, says Anthony Loke

Malaysia / 2y

Anthony Loke’s shortness of breath not related to heart attack, says Lukanisman

Business / 2y

Fresh opportunities for Sabah's sluggish shipping industry as Putrajaya discontinues National Load Centre policy

Spotlight

Opinion

“I’m not a war criminal, I’m a patriot”: Shavendra Silva’s amnesia tour meets the receipts

By Abbi Kanthasamy

Malaysia

British management on trial – does a royal management institute deliver value?

Malaysia

Doctor among five killed in Sarawak Flying Doctor helicopter crash identified

Malaysia

Nearly 10,000 potential fire hotspots detected on RSPO-managed land

Malaysia

Undang Yang Empat produces letter allegedly confirming Tuanku Muhriz’s removal

Malaysia

Northern Malaysia must prepare for the consequences of lower rainfall

Malaysia

Helicopter crashes during flying doctor service mission in Sarawak

You may be interested

Malaysia

Six face court over alleged rape of same 15-year-old girl in Perlis

Malaysia

Former childcare worker charged over alleged emotional abuse of two-year-old

Malaysia

Serian air quality remains very unhealthy as haze spreads

Malaysia

Jokowi calls on global institutions to meet  needs growing, interconnected world

By Ian McIntyre

Malaysia

Super El Niño could drive Malaysia temperatures to 40°c in 2027

Malaysia

Forensic psychiatrist says positive aspects of Zara Qairina’s diary were considered

Malaysia

Jakarta airport reopens as Anak Krakatau ash disruption eases

Malaysia

Anwar: RM400 aid only part of broader support for smallholders