World

Blocked by Biden, Canadian company drops Keystone pipeline

TC Energy throws in towel on controversial oil initiative

Updated 5 years ago · Published on 10 Jun 2021 3:00PM

Blocked by Biden, Canadian company drops Keystone pipeline
Environmental activists during a protest in 2014, having inflated a long balloon to mock the Keystone pipeline project during a demonstration in front of the White House in Washington, DC. TC Energy said today it had officially terminated the Keystone XL Pipeline project. – AFP pic, June 10, 2021

NEW YORK – Blocked by United States President Joe Biden, Canada’s TC Energy said today it had officially terminated the Keystone XL Pipeline project, throwing in the towel on a controversial initiative opposed by environmental activists.

TC Energy will coordinate with regulators, indigenous groups, and other stakeholders “to meet its environmental and regulatory commitments and ensure a safe termination of and exit from the project”, the company said in a press release, confirming that it had notified the government of the province of Alberta.

Biden formally rescinded a permit for the pipeline, first proposed in 2008, by executive order on his first day in office in January 2021.

He had vowed during the presidential campaign to end the project over environmental concerns, a reversal of the stance taken by predecessor Donald Trump.

While the project has long been backed by Canada, Keystone XL had been opposed by environmentalists and indigenous groups, who have organised rallies against the pipeline in Washington, Ottawa and in the affected areas throughout the last decade.

The 1,947km pipeline, starting in 2023, was to transport up to 830,000 barrels of oil per day from the Alberta oil sands to Nebraska and then through an existing system to refineries in coastal Texas.

TC Energy argued that bringing so much oil from friendly, neighbouring Canada would reduce US dependence on the Middle East and Venezuela by up to 40%.

The State Department estimated the plan would have created 42,000 temporary jobs over the two-year construction period, but opponents noted that just 35 permanent jobs would be created for pipeline maintenance. – AFP, June 10, 2021

Related News

World / 2y

Biden drops out of presidential race

Business / 3y

Man who threatened Biden dies in FBI raid: report

World / 3y

Democrat lawmakers slam Biden’s decision to send cluster munitions to Ukraine

World / 3y

US ‘had nothing to do with’ Wagner revolt in Russia: Biden

World / 3y

Facing geopolitical peril, how will Modi play his hand with Biden?

World / 3y

Hunter Biden to plead guilty to tax charges, gun offence

Spotlight

Malaysia

Tuanku Muhriz to focus on state affairs; Will not attend Conference of Rulers meeting

Malaysia

Sarawak projects record RM15.09b revenue, budgets RM10.1b for development in 2027

Malaysia

Sultan Nazrin: Delay in environmental action places future generations at risk

Malaysia

Woman allegedly raped at KL shopping centre after being threatened with intimate video

Malaysia

Jordan’s King confers highest civilian honour on Sultan Ibrahim

Malaysia

Driver monitoring aims to stop commercial vehicle crashes before they happen

Malaysia

KTMB heritage sites set for tourism makeover, says Loke

Malaysia

Zara Qairina’s mother: No doctors recorded injuries consistent with being beaten

You may be interested

World

Houthi attacks hit Riyadh, Dammam airports as Saudi Arabia faces mounting security threat

World

Man dies after entering tiger enclosure at UK wildlife park

World

Iran says US response on Hormuz Strait reopening proposal falls short

World

Trump calls for Zelenskiy’s removal after deadly Russian strike kills 20 in Ukraine

World

Bangladesh to deploy army at two new posts near Rohingya camps amid rising crime

World

Trump weighs joining Saudi strikes after deadly Houthi attack on Riyadh airport

World

India releases youth protest leaders after detention as voter-list row deepens