World

UK Parliament building ‘falling apart’: experts

Estimated cost of full-scale overhaul priced at £4.3 bil

Updated 4 years ago · Published on 22 Oct 2021 1:30PM

UK Parliament building ‘falling apart’: experts
The array of defects were recorded by dozens of engineers, architectural surveyors and other specialists who spent a combined 4,700 hours investigating the more than 150-year-old Palace of Westminster. – Pixabay pic, October 22, 2021

LONDON – It has been an enduring symbol of democracy since the 19th century but Britain’s Parliament is crumbling, producing an eye-watering bill and urgent calls to fix it.

Officials today detailed thousands of issues with the landmark building, from stonework cracks and water damage to outdated electrical and mechanical systems.

“Despite a programme of maintenance works, it’s falling apart faster than it can be fixed and is in urgent need of a programme of essential restoration,” said the leader of the House of Lords, Natalie Evans.

The array of defects were recorded by dozens of engineers, architectural surveyors and other specialists who spent a combined 4,700 hours investigating the more than 150-year-old Palace of Westminster.

Built in the middle of the 19th century, it is home to Britain’s Houses of Parliament – the lower House of Commons for elected MPs and the unelected upper House of Lords.

At the north end of the royal palace, rising up above the River Thames, is Big Ben, the nickname for the Great Bell of the striking clock atop the Elizabeth Tower.

Big Ben, with its distinctive chime and “bongs”, has undergone its own costly renovation in recent years.

The latest probe is seen as a key step in planned restoration and renewal works to the Unesco World Heritage Site, which have been repeatedly delayed, and are not set to be put to lawmakers for approval until 2023.

The estimated cost of a full-scale overhaul – priced at £4.3 billion (RM24.6 billion) several years ago – has left lawmakers reluctant to sign off on the works.

“The Houses of Parliament building is recognised the world over as a symbol of our nation but this building requires a considerable level of care to keep it working and needs an essential programme of restoration work,” said the leader of the House of Commons, Jacob Rees-Mogg.

“We must be able to justify this project to taxpayers,” added the MP, who is charge of government business in the chamber.

“That’s why it’s so important to understand and map out the restoration work needed to protect the building – so that the focus is on those essential works necessary to preserve the Palace for future generations.” 

‘Detailed record’ 

The inspectors combed 2,343 rooms and spaces during the parliamentary recess this summer and while MPs were at their annual party conferences in September and October.

They unearthed problems with many of the building’s historic features, including original Victorian-era stained-glass windows, which were warping and sagging due to age. 

They also encountered “miles of outdated and interweaving gas, electrics, water, sewage, and heating pipes” in an enormous basement.

“Work was also done to understand the provenance of quirky candle and gas light fittings, some of which were discovered to have been turned upside down when converted to electric power over 100 years ago,” the parliamentary body responsible for restoration and renewal said.

“Further investigation is ongoing but it is thought the palace may contain the oldest still-in-use gas lighting system in the world.”

In addition, the team also studied and recorded several remarkable candle chandeliers that survived the great fire of 1834, which destroyed the original medieval palace built on the site.

Further detailed surveys, including “intrusive” probes into its structure, will be carried out in the coming months “to continue building the most detailed record of the palace ever created”.

More than 40,000 problems with the four-floor building, constructed from limestone and boasting a floorplan the size of 16 football pitches, have been reported since 2017. 

Officials have previously noted it is at high risk of sudden failure from major fire, flood or stone fall, with the annual cost of maintenance and ongoing projects recently doubling from £62 million in 2016 to £127 million in 2019. – AFP, October 22, 2021

Related News

Malaysia / 1mth

MP to raise commingled oil cargo tax uncertainty in Parliament

Malaysia / 2mth

No discussions yet regarding general election – Zahid

Malaysia / 2mth

BNPL users hit eight million as outstanding balances reach RM5.3b

Malaysia / 3mth

Speaker reminds MPs not to skip parliamentary sessions

Malaysia / 3mth

Hamzah back in the saddle as opposition leader after brief shake-up

Malaysia / 3mth

Muhyiddin's seat in Dewan Rakyat moved to Block E

Spotlight

Malaysia

Man kidnapped, tortured, and killed following misunderstanding

Malaysia

'I will never forget taxi drivers who backed me in my hardest times' - PM Anwar

Malaysia

Najib fails to secure stay of 15-year jail term, RM11.38b fine in 1MDB case

Malaysia

Ivana Smit’s mother considers Federal Court appeal after RM1.1m award overturned

Education

Schools in Negeri Sembilan, Melaka to reopen tomorrow as haze conditions improve

Malaysia

Zara Qairina inquest: Investigating officer says final findings showed no suspicious circumstances

Malaysia

Man jailed 8½ years for abusing three-year-old boy, forcing the child to eat faeces

World

Pope Leo XIV diagnosed with lung cancer after successful surgery

Malaysia

More than 3,000 Myanmar refugees set for repatriation after Malaysia secures breakthrough

You may be interested

World

Pope Leo XIV diagnosed with lung cancer after successful surgery

World

Malaysia seeks China’s satellite technology to improve flood warnings, combat cross-border crime

World

North Korea test-fires tactical ballistic missile amid rising regional tensions

World

Five Malaysians held in Tokyo over RM3.1m cocaine haul hidden in shoes

World

Houthi missile intercepted over Riyadh as attacks intensify pressure on Saudi Arabia

World

Fresh magnitude-6 earthquake strikes Panama after deadly tremor

World

Indonesia rules out national disaster status for forest fires despite regional haze

World

IMF warns AI sell-off; Soaring bond yields could trigger global market turmoil