Malaysia

Public Works Dept will assist with PTMP: works minister

Penang Transport Master Plan a state initiative, but department will cooperate, provide technical advice, says Datuk Seri Fadillah Yusof

Updated 4 years ago · Published on 20 Mar 2022 5:00PM

Public Works Dept will assist with PTMP: works minister
Works Minister Datuk Seri Fadillah Yusof (centre) today, inspects the Titi Kerawang Bridge replacement project at FT006/41/93, Southwest district, which is part of the Penang Round Island route that costs RM8.1 million to construct. – RACHEL YEOH/The Vibes pic, March 20, 2022

BALIK PULAU – Works Minister Datuk Seri Fadillah Yusof said the ministry will assist in whatever way they can with the Penang Transport Master Plan (PTMP).

PTMP is a state government initiative with an estimated cost of RM46 billion, comprising a seabed tunnel connecting the island to the mainland, highways, LRT, monorail, and a comprehensive network of bus routes on the island and mainland.

“PTMP is not under our jurisdiction as the planning is at the state level.

“However, at the state-level, the Public Works Department (PWD) will cooperate in providing technical advice, and whatever input needed.

“And if the state needs help at the federal level, we are also ready to provide our expertise in terms of advice and whatever that is required by the state,” he said today at the Titi Kerawang Bridge inspection during the FT Roadpedia Utara 2.0.

He inspected the bridge replacement project at FT006/41/93, Southwest district that is part of the “Penang Round Island” route that costs RM8.1 million to construct.

The Titi Kerawang Bridge replacement project at FT006/41/93 was completed on May 31, last year, involving a 160m route to replace the old, narrow bridge with a 90-degree angle curve that was too difficult for large vehicles such as tour buses to manoeuvre. – RACHEL YEOH/The Vibes pic, March 20, 2022
The Titi Kerawang Bridge replacement project at FT006/41/93 was completed on May 31, last year, involving a 160m route to replace the old, narrow bridge with a 90-degree angle curve that was too difficult for large vehicles such as tour buses to manoeuvre. – RACHEL YEOH/The Vibes pic, March 20, 2022

The project was completed on May 31, last year, involving a 160m route to replace the old, narrow bridge with a 90-degree angle curve that proved to be too difficult for large vehicles such as tour buses to manoeuvre.

The old bridge will serve as a parking location for those visiting the Titi Kerawang Waterfalls and a place for cyclists to take a break during their journey to Balik Pulau from Teluk Bahang and vice versa.

“This project aims to improve the existing road infrastructure network because the old Titi Kerawang bridge is quite narrow and cannot accommodate two vehicles at once from different directions.

Safety and comfort aspects have also been enhanced; plus, heavy vehicles can cross this new bridge without any obstacles from sharp bends,” he said.

This is one of four completed projects out of 23 in the northern region. Another 19 projects in the region under the 11th and 12th Malaysia Plan are currently underway.

The total expenditure for all 23 projects will amount to RM2.2 billion. – The Vibes, March 20, 2022

Related News

Malaysia / 2d

Kedah may delay Penang lease claim documents till change of federal government

Malaysia / 2d

Guan Eng questions Penang PH's stance on UMNO

Community / 2d

Penang's first integrated senior living resort to be ready next year

Malaysia / 3d

Trio escape with minor injuries after tree crashes on their car

Malaysia / 4d

Penang: PH - Umno cooperation to be maintained in state government

Malaysia / 4d

Penang PH to meet over Umno cooperation in the state

Spotlight

Malaysia

Najib raises objections to 80% of ex-1MDB CEO’s witness statement over hearsay

Malaysia

Tun Dr Mahathir, Siti Hasmah create ASEAN record

By Alfian Z.M. Tahir

Malaysia

Nanta Linggi to leave Parliament after five terms, may contest new Sarawak state seat

World

Typhoon Dolphin’s remnants swamp Beijing as China braces for more extreme rainfall

Malaysia

Anwar expected to leave hospital today after successful treatment

Malaysia

Husband and wife face death penalty for drug trafficking

Malaysia

Former Subang MP, Wong Chen joins Bersama

Malaysia

Malaysian dies while transiting in Bangkok to Japan (video)

You may be interested

Malaysia

Crypto investor weighs Forest City tech campus revival after Network School shutdown

Malaysia

Sarawak haze worsens as two areas hit ‘Very Unhealthy’ air quality

Malaysia

Haze: Putrajaya, Cheras record unhealthy API this morning

Malaysia

Syed Saddiq warns Tabung Haji bailout burden could fall on future generations

Malaysia

Selangor yet to finalise funding for RM3 billion Shah Alam Stadium redevelopment

By Alfian Z.M. Tahir

Malaysia

RM85 billion energy savings in sight as Malaysia rolls out 10-year efficiency plan

Malaysia

Nanta Linggi to leave Parliament after five terms, may contest new Sarawak state seat

Malaysia

Sarawak schools told to halt outdoor activities as haze pushes air quality into unhealthy range