World

Ethiopia begins second stage of filling mega dam, angering Egypt

Hackles rise ahead of UN Security Council meeting on issue

Updated 5 years ago · Published on 06 Jul 2021 6:00PM

Ethiopia begins second stage of filling mega dam, angering Egypt
The Grand Ethiopian Renaissance Dam, set to be Africa’s largest hydroelectric project when completed, is the source of an almost decade-long diplomatic stand-off between Addis Ababa and downstream nations Egypt and Sudan. – AFP pic, July 6, 2021

CAIRO – Ethiopia says it has started the next phase of filling a controversial mega dam on the Nile River, Egyptian authorities said yesterday, raising tensions ahead of an upcoming UN Security Council meeting on the issue.

Egypt said the move was “a violation of international laws and norms that regulate projects built on the shared basins of international rivers”, and had expressed its “firm rejection of this unilateral measure”, its Irrigation Ministry said in a statement late yesterday.

The Grand Ethiopian Renaissance Dam, which is set to be Africa’s largest hydroelectric project when completed, is the source of an almost decade-long diplomatic stand-off between Addis Ababa and downstream nations Egypt and Sudan.

Ethiopia says the project is essential to its development, but Cairo and Khartoum fear it could restrict their citizens’ water access.

Both countries have been pushing Addis Ababa to ink a binding deal over the filling and operation of the dam, and have been urging the UN Security Council to take the matter up in recent weeks.

Thursday’s meeting was requested by Tunisia on Egypt and Sudan’s behalf, a diplomatic source said.

But France’s ambassador to the UN said last week that the council itself can do little apart from bringing the sides together.

Egypt’s Foreign Minister Sameh Shoukry said in one note to the UN that negotiations are at an impasse, and accused Ethiopia of adopting “a policy of intransigence that undermined our collective endeavors to reach an agreement”.

Addis Ababa had previously announced it would proceed to the second stage of filling in July, with or without a deal.

The Nile – which at some 6,000km is one of the longest rivers in the world – is an essential source of water and electricity for dozens of countries in East Africa.

Egypt, which depends on the Nile for about 97% of its irrigation and drinking water, sees the dam as an existential threat.

Sudan hopes the project will regulate annual flooding but fears its dams would be harmed without agreement on the Ethiopian operation.

The 145m mega dam, on which construction began in 2011, has a capacity of 74 billion cubic metres.

Filling began last year, with Ethiopia announcing in July 2020 it had hit its target of 4.9 billion cubic metres – enough to test the dam’s first two turbines, an important milestone on the way towards actually producing energy.

The goal is to impound an additional 13.5 billion cubic metres this year.

Egypt and Sudan wanted a trilateral agreement on the dam’s operations to be reached before any filling began.

But Ethiopia says it is a natural part of the construction, and is thus impossible to postpone.

Last year Sudan said the process caused water shortages, including in the capital Khartoum, a claim Ethiopia disputed.

Sudan’s Water Minister Yasser Abbas warned in April that if Ethiopia went ahead with the second stage filling, Sudan “would file suits against the Italian company constructing the dam and the Ethiopian government”.

He said the suits would highlight that the “environmental and social impact as well as the dangers of the dam” have not been taken into adequate consideration. – AFP, July 6, 2021

Related News

World / 3w

Sudan’s war may be far from over — and a new report suggests why

World / 1mth

HRW: Private military contractors deployed to Sudan to support RSF

World / 1y

Israel, Hamas reach ceasefire deal for January 19

Malaysia / 2y

Agong disappointed that US vetoed UNSC resolution urging Gaza ceasefire

Malaysia / 2y

M’sia backs call for UNGA’s 10th emergency special session tomorrow

World / 2y

Sudan’s de facto president rejects peace negotiations

Spotlight

Malaysia

Wild boar collision claims woman’s life as husband suffers injuries in Bera

Malaysia

Joe Zakaria attack: Questions emerge over safety of voices challenging Malaysian football status quo

Malaysia

DAP withdraws support for Melaka govt after assembly approves seven appointed seats

By Alfian Z.M. Tahir

Malaysia

Zara Qairina inquest: Qualifications of 76th witness questioned

Malaysia

Melaka passes appointed assembly members bill as DAP moves to pull out of State Govt

Malaysia

Anwar rejects snap election push, says Govt must prioritise economic recovery and stability

Malaysia

Rosmah sues Harith Iskander over comedy routine, alleges defamation and body shaming

You may be interested

World

Strong 6.3-magnitude earthquake strikes southeast of Loyalty Islands

World

Air strikes continue, tankers come under fire as US-Iran conflict escalates in Hormuz Strait

World

Netanyahu faces four key challengers as Israel sets general election for Oct 27

World

US-Iran conflict escalates as missile strikes spread across the Gulf to a closed Hormuz Strait

World

Deadly Bangkok pub fire claims 27 lives, dozens critically injured (videos)

World

Beijing warns against ‘stirring up trouble’ over 2016 arbitration ruling