Malaysia

Study on ECRL Temerloh-Port Klang route ongoing, says deputy minister

Selangor govt requests state’s inclusion in Section C route

Updated 5 years ago · Published on 18 Nov 2020 11:54AM

Study on ECRL Temerloh-Port Klang route ongoing, says deputy minister
More than 19% of the ECRL’s total project has been completed, putting it slightly ahead of schedule, as of October 31. – Bernama pic, November 18, 2020

by Azril Annuar

KUALA LUMPUR – The East Coast Rail Link’s (ECRL) Temerloh-Port Klang route remains in the study stage while the Selangor government has requested for it to include the state, Deputy Transport Minister Hasbi Habibollah told the Dewan Rakyat today.

In a supplementary question, June Leow (PH-Hulu Selangor) asked the deputy minister to consider including Selangor and her constituency in ECRL’s Section C route.

Hasbi said the government is studying the Temerloh-Port Klang route, and the Selangor government has made a similar request for the state to be included.

He said early tunnelling works in a few sections, such as Gambang and Sri Jaya, are under way.

He added that as of October 31, 19.09% of the ECRL’s total project has been completed, putting it slightly ahead of schedule.

“For Section A, which is Kota Baru to Dungun, the rail scheme was approved on May 14 this year. The stations approved and being constructed are Kota Baru, Pasir Puteh, Jerteh, Bandar Permaisuri, Kuala Terengganu and Dungun.

“For Section B, from Dungun to Temerloh, physical completion of the work is at 5.39% when compared to 4.07% in the estimated timeline,” said Hasbi in his reply to Leow. – The Vibes, November 18, 2020

Related News

Malaysia / 3w

Speaker informs EC of Subang parliamentary seat vacancy

Malaysia / 3w

Tabung Haji RCI report takes centre stage at special Dewan sitting tomorrow

Malaysia / 6mth

PM term limit: 'It starts with me' - Anwar

Malaysia / 6mth

Dewan Rakyat passes International Mediation Bill

Malaysia / 7mth

Government completes repayment of RM22.45b in overpaid taxes last year - highest in 5 years

Malaysia / 7mth

PM: Malaysia recorded 4.9 per cent GDP growth in 2025, surpassing official projections 

Spotlight

Malaysia

Puteri Umno distances itself from viral Threads post

By Alfian Z.M. Tahir

Malaysia

MACC drops orange detention attire for court remand cases after PM’s call

World

Man jailed six years for keeping Indonesian woman as slave in Melbourne home

Malaysia

Emergency declared in Serian as haze reaches hazardous levels (UPDATED)

Malaysia

Haze in Serian enters emergency phase

Malaysia

Death sentence for deaf, mute man who killed family of four upheld

Malaysia

Retired army officer with Datuk title charged with alleged sexual assault of golf caddie

Heritage

Penang first state to recognise Hungry Ghost Festival, cemeteries as heritage

You may be interested

Malaysia

Indonesia’s forest fires reached 10% of 2015 emissions as Sarawak haze worsens

Malaysia

Police probe viral teen fight over social media photo in Kuala Pilah

Malaysia

Akmal: Malaysia must future-proof energy security, OGSE industry

Malaysia

'The life and spirit of the cafe is gone', Secangkir Café, Kuantan closes today

Malaysia

UMNO-PAS ‘reunion’ gains pace as Hadi puts PAS on GE16 alert

Malaysia

Emergency declared in Serian as haze reaches hazardous levels (UPDATED)

Malaysia

E-hailing driver helps save 71-year-old from losing another RM10k in suspected love scam

Malaysia

Death sentence for deaf, mute man who killed family of four upheld