Malaysia

Motorised lift system to enhance accessibility at Penang temple in 2 years

Project is estimated to cost between RM4 million to RM6 million, depending on the feasibility study and the selected mode of transportation.

Updated 1 year ago · Published on 12 Feb 2025 11:45AM

Motorised lift system to enhance accessibility at Penang temple in 2 years
Access to the top of the Sri Arulmigu Balathandayuthapani Temple made easier for devotees and visitors, particularly the elderly, especially during Thaipusam festival. – February 12, 2025

by Ian McIntyre

DEVOTEES received cheers during yesterday's Thaipusam celebrations when the state disclosed that it had approved a motorised lift to the top of the Sri Arulmigu Balathandayuthapani Temple, in George Town, Penang - which is perched 513 steps from ground level.

Chief Minister Chow Kon Yeow disclosed this when visiting the temple, citing that that this is a significant move in enhancing accessibility for the devotees and visitors, particularly the elderly.

Hartasuma Sdn Bhd, the company selected through a Request for Proposal (RFP) for the Penang Hill cable car project, has expressed interest in developing a motorised lift system or a people mover system towards the peak of the temple.

“Located at an altitude of over 100 metres, this initiative will promote inclusivity by making access easier for all devotees. It will be especially beneficial for those requiring additional assistance, such as senior citizens, the disabled, pregnant women, and those with mobility challenges,” Chow said.

The Chief MInister received the letter of interest from Hartasuma chief executive officer Tan Sri Ravindran Menon. As part of Hartasuma’s corporate social responsibility (CSR) programme, the project is estimated to cost between RM4 million to RM6 million, depending on the feasibility study and the selected mode of transportation.

The Lord Murugan Temple along Jalan Kebun Bunga is touted as the largest in the region, and arguably the highest outside of India.

Chow said that the state was told that the project will be able to be completed within the next two years.

Hartasuma confirmed its plan to conduct a feasibility study to determine the most suitable lift or transportation system for the site.

The study is expected to take six months, followed by a 24-month construction phase. Once completed, the system will be handed over to the state government for operation.

Penang state also allocated RM200,000 to the Thanneermalai Shree Balathandayuthapani Devasthanam Temple Management Committee to support this year’s Thaipusam celebration.

Digital Minister Gobind Singh Deo shared that the ministry has installed two giant digital screens at the temple, allowing devotees to follow the Thaipusam proceedings seamlessly.

Gobind added his office would convey the Penang Hindu Endowments Board and the Sri Arulmigu Temple’s request to Prime Minister Datuk Seri Anwar Ibrahim for a special allocation towards future Penang Thaipusam celebrations.

Penang arguably recorded the highest turnout for Thaipusam ever with some 1.5 million people descending onto the narrow passage of Waterfalls, leading to the hilltop temple.

The celebration caused congestion in major parts of George Town for the past three days, with temple chairman Datuk Seri K. Kumaraendran expressing gratitude to the state government.

“After 30 years of advocating for full step-free accessibility for elderly devotees, visitors, and those with mobility challenges, this long-awaited project is finally becoming a reality,” he said.

Penang Consumers Protection Association president Datuk K. Koris Attan was among several community leaders overjoyed with the move to install the lift, saying that this was a struggle for a good part of a decade.

Koris said that the lift can help the old devotees reach the top without much hinderance.

He also hopes that the device would be eco - friendly, especially in the age were the public are concern over climate change and the need for more conservation. – February 12, 2025

Spotlight

Malaysia

Anwar congratulates Modi on becoming India's longest-serving elected PM

Malaysia

Missing jewellery: Rosmah ordered to pay RM67.5 million

People

Malay kampongs in Bangkok: Echoes of southern heritage in Thailand’s capital

Opinion

Johor MB’s exclusionary rhetoric betrays the people, exposes UMNO’s political hypocrisy

Malaysia

Johor and NS polls first major test of post PAS-Bersatu political order

Malaysia

Claimed installation of 12th N. Sembilan ruler invalid - Pengelola Bijaya Diraja

Malaysia

4WD driver who drove backwards on highway nabbed, positive for drugs (video)

By Ian McIntyre

Malaysia

Seven in ten Malaysian workers earn RM5k or less - economist

You may be interested

Malaysia

MACC - MOF deepen alliance to pursue high-profile graft cases and asset recovery

Malaysia

Retail prices of diesel, RON95 remain unchanged - at RM4.67, RM3.72 per litre

Malaysia

Jeweller vows to pursue Rosmah until ‘every penny’ is recovered as RM67.5m battle enters enforcement phase

Malaysia

Hannah Yeoh defends unity government model, says leadership is about cooperation, not exclusion

Malaysia

Anwar warns global order lacks direction, calls for renewed international cooperation

Malaysia

AG defends compound settlements in corruption cases, says law bars further prosecution after payment

Malaysia

Man blames 'lack of love' for sexual assault on teens

Malaysia

PAS ends political cooperation with Bersatu