Malaysia

RM18 bil Sarawak water supply projects mooted in 12MP

Datuk Stephen Rundi Utom says state aspires to have sustainable, world-class facilities to uplift residents’ well-being

Updated 5 years ago · Published on 08 Dec 2020 4:55PM

RM18 bil Sarawak water supply projects mooted in 12MP
Sarawak Utilities Minister Datuk Stephen Rundi says there are efforts in place to improve the state’s water supply. – AFP pic, December 8, 2020

KUCHING – Four major water supply projects estimated to involve an overall cost of about RM18 billion have been proposed to be implemented in Sarawak during the 12th Malaysia Plan (12MP) period, state Utilities Minister Datuk Stephen Rundi Utom said today.

He said these projects include the Sarawak Water Supply Master Plan and Water Grid – the extension of pipelines to communities that can be connected to the existing water supply network system, and the implementation of the Sarawak Alternative Rural Water Supply (Sawas) project to cover remote rural areas.

“Apart from these projects, my ministry has also embarked on a holistic non-revenue water (NRW) management programme in order to reduce NRW to 25% in Sarawak,” he said at a memorandum of understanding signing ceremony between his ministry, the Malaysian Construction Academy and Sarawak Skills Development Centre here.

He said Sarawak has been aspiring to have world-class utilities that would be reliable, economical, safe and sustainable throughout the state to uplift the social well-being of residents.

“Under the 11MP, the state government had approved RM6.1 billion for 704 water supply-related projects to be implemented throughout Sarawak. Of these, 55% have been completed, with the remaining 45% still under various stages of implementation,” he said. 

Currently, the overall water supply coverage in the state is 84.1%, and Sarawak is targeting 100% coverage by 2025.

Rundi said the signing ceremony with the two learning institutions today was an important milestone for the ministry in its efforts to increase the number of qualified pipe fitters and mains layers.

“This is indeed very timely as we foresee that we will need a lot of pipe fitters and mains layers following the expected implementation of many water supply projects, as well as building projects, in the upcoming 12MP,” he added.

The 12MP covers the period from 2021 to 2025. – Bernama, December 8, 2020 

Related News

Malaysia / 2d

Budget 2027: Sabah, Sarawak to receive RM34.9b in federal allocations next year

Events / 2d

‘We need to work together to combat threats of climate change’ – Sarawak deputy premier

Events / 6d

Sarawak and Sabah play key roles in weathering climate change

Events / 1w

Eco-friendly minds and leaders to meet over water conservation and preservation

Malaysia / 1w

27 stations record unhealthy API readings; six locations in Selangor affected

Malaysia / 3w

A historic gift of life at Sarawak General Hospital

Spotlight

Malaysia

JPJ temporarily suspends VTA and registration for Chery Omoda 5

Malaysia

Eligibility for PTPTN repayment deferment to be verified with LHDN

Malaysia

Budget allocates two rounds of cash aid to millions of Malaysians in 70th Merdeka year

Malaysia

No Malaysians killed or injured in Riyadh airport attack, says Wisma Putra

Malaysia

JAIS probes viral religious ritual footage, says AI manipulation not ruled out

Malaysia

10-tonne truck ploughs into 11 vehicles: Police probe possible brake failure

World

Trump weighs joining Saudi strikes after deadly Houthi attack on Riyadh airport

You may be interested

Malaysia

Johor tops Malaysia’s 20 unhealthy air quality hotspots, Kota Tinggi worst

Malaysia

Not a single corruption scandal during Aminuddin's administration - Anthony Loke

Malaysia

MACC warns data leaks could expose witnesses, derail corruption probes

Malaysia

Perak state government leaves school bullying and alleged teacher assault cases to police

Malaysia

19-year-old charged with murdering student in Kuantan

Malaysia

Resident injured after crane topples onto nursing home

Malaysia

Minimum wage hike to RM2,000 from June 2027 to benefit 4 million workers

Malaysia

Tiger spotted by roadside on Fraser’s Hill–Kuala Kubu Bharu route