Malaysia

High RM38.5 mil cost for Seri Perdana facelift to fix leaky roofs, faulty wiring

Special Functions Minister Datuk Abd Latiff Ahmad says 12-year-old complex has fair share of damage

Updated 4 years ago · Published on 29 Sep 2021 4:50PM

High RM38.5 mil cost for Seri Perdana facelift to fix leaky roofs, faulty wiring
The Seri Perdana Complex, completed in 1999, is the official residence of the prime minister of Malaysia. – Bernama pic, September 29, 2021

by The Vibes Team

KUALA LUMPUR – Plans to renovate the Seri Perdana Complex for RM38.5 million was given the green light in March this year under the purview of then prime minister Tan Sri Muhyiddin Yassin. 

In a statement in response to the controversy surrounding the high cost involved for the official residence of the prime minister, Special Functions Minister Datuk Abd Latiff Ahmad said the 22-year-old complex, which began construction in 1997 and was completed in 1999, had suffered numerous damage over the years.

“As such, the Public Works Department (PWD) had prepared a scope of restoration works, with the overall cost at RM38.5 miliion for the project, including for works to fix the electrical wiring systems and roof leaks within the complex.

“The project was approved on March 19 and repair works commenced on March 29. All works are scheduled to be completed by December 7 this year,” he said.

He added as of today, the restoration works are 74% completed compared with the estimated 71% as per schedule. 

Latiff’s response comes after Prime Minister Datuk Seri Ismail Sabri Yaakob told the Dewan Rakyat that the renovations at Seri Perdana are necessary to ensure safety, as well as to preserve the country’s image during visits by key dignitaries.

The explanation comes after Datuk Mahfuz Omar (Pokok Sena-PH) sought justification for the spending at a time when Malaysians are reeling from the effects of the Covid-19 pandemic.

In a parliamentary reply, the prime minister said the improvements include electrical wiring and mechanical works, as well as works on the air-conditioning systems and structural modifications to the official residential block.

Old and dilapidated furniture were replaced in accordance with the status of Seri Perdana, he had said.

He had also said the progress of the renovations stood at 60% as of August 31. – The Vibes, September 29, 2021

Related News

Malaysia / 6mth

Cabinet reshuffle? Guessing game begins

Opinion / 1y

Malaysia’s pretenders and their unholy game with race and religion

Malaysia / 2y

Anwar won’t host Hari Raya open house to save money

Malaysia / 2y

Local white rice shortage: PM Anwar wants frequent monitoring, enforcement

Malaysia / 2y

Move on, don’t torment parties that made ‘mistake’ with offensive socks, says PM

Business / 2y

Anwar announces RM1 bil allocation for ‘new generation’ Bumiputera entrepreneurs

Spotlight

Malaysia

Former head of a ministry's corporate communications unit acquitted of bribery charge

Malaysia

Two sisters die trapped in Johor house fire as escape routes cut off by flames

Malaysia

NS election speculation intensifies as Aminuddin granted audience with state ruler

Malaysia

Teenager who drove recklessly, causing death remanded for further investigation

Malaysia

Police looking for trio involved in violent armed robbery in Penang (video)

Malaysia

Family of five killed as car crashes into water pipe in Serian

Malaysia

'I was once spat on by a pakcik' — Marina denies fear of contesting Malay-majority seats

Malaysia

Jewellery shop among six premises destroyed in fire (video)

You may be interested

Malaysia

Woman jailed over abduction, extortion and forced nudity case as three admit guilt

Malaysia

Toh Puan Na'imah’s legal team cautions against ‘dangerous’ application of SOSMA

Malaysia

Govt sees relief in lower US tariff proposal as exporters brace for competitive pressures

Malaysia

MACC officer tells court Penang Tunnel bidder allegedly gained early edge through private briefings, trial hears

Malaysia

Johor PRN: Onn Hafiz likely to be BN 'poster boy'

Malaysia

Former head of a ministry's corporate communications unit acquitted of bribery charge

Malaysia

Malaysians may soon be able to get a 10-year passport for RM350

Malaysia

Motorcyclist killed after collision with 4WD in Papar; abandoned vehicle later found burnt