Malaysia

A-G report: DBKL yet to reach flood mitigation goals

Review also notes weaknesses in programme management

Updated 4 years ago · Published on 03 Aug 2022 8:27PM

A-G report: DBKL yet to reach flood mitigation goals
A man stands at Dataran Merdeka during flash floods that hit the Klang Valley in December last year. – The Vibes file pic, August 3, 2022

KUALA LUMPUR – Kuala Lumpur’s flood mitigation management has not yet achieved its objectives based on the scope and audit samples covering six of the 23 (or 26.1%) of the flood mitigation projects under the Kuala Lumpur City Rainwater Management Drainage System Master Plan (Master Plan), as well as flash flood hotspots.

According to the Auditor-General’s Report 2021 Series 1, Kuala Lumpur City Hall has not fully implemented the proposed short-term flood mitigation measures (2018-2022) under the Master Plan, causing the problem of flash floods to remain unresolved.

“In addition, flash floods keep recurring even after the implementation of flood mitigation projects.

“Furthermore, there are weaknesses in aspects of programme management, including appointment of contractors, contract administration, maintenance work as well as components and configurations of the flood reservoirs and recreation ponds,” said the report.

To overcome the weaknesses highlighted and to ensure they do not recur in the future, the auditor-general has proposed that city hall implement flood mitigation projects in a balanced and consistent manner – by taking into account the consultants’ proposals and the requirements of hotspot projects, so that the implementation of flood mitigation programmes are more comprehensive and holistic.

The auditor-general also proposed that local authorities conduct an outcome evaluation of the mitigation programme based on city hall’s standard operating procedure in terms of its effectiveness in dealing with floods.

“Review the components and configurations of flood reservoirs and recreation ponds owned by city hall and carry out scheduled maintenance works to ensure that the flood reservoirs and recreation ponds are functioning optimally.

“Maintain timely records of assets or infrastructure of rivers and flood reservoirs and recreation ponds, as well as improve on-site monitoring methods for project supervision and project maintenance,” it said. – Bernama, August 3, 2022

Related News

Malaysia / 1w

57 Malaysians still uncontactable after Nepal floods

Malaysia / 1w

Nepal disaster: Photos and videos surface of individuals stealing jewellery from the dead

Malaysia / 1w

Nine Malaysians in two 4WDs lose contact amid Nepal floods

World / 1w

Nepal: Mudslide destroys village, 95 dead, 17 Malaysian tourists reportedly missing (video)

Malaysia / 3mth

PJ MP slammed for ‘media statements without solutions’

Malaysia / 3mth

Heavy rains trigger flash floods in several locations around the Klang Valley (video)

Spotlight

Malaysia

Penang CM defends move by housing board, says enforcement is last resort

By Ian McIntyre

World

Anak Krakatau’s six eruptions recorded

Malaysia

Delivery rider's compassion turns RM14.50 meal into wave of public generosity

Malaysia

Sanusi’s gambling stance puts PAS manifesto under scrutiny

By Alfian Z.M. Tahir

Malaysia

Zahid’s game plan is opening up

Malaysia

Chew Jetty fire: Business owners lose everything in the blink of an eye

By Ian McIntyre

Malaysia

SMART Team leaves for Nepal today as search for 55 Malaysians continues

Diary

Mother Teresa - one of the foremost humanitarian figures of the 20th century died today, 29 years ago

You may be interested

Malaysia

MACC drops orange detention attire for court remand cases after PM’s call

Malaysia

Leave PAS-UMNO seat talks to party presidents - Johari

Malaysia

Emergency declared in Serian as haze reaches hazardous levels (UPDATED)

Malaysia

PAS calls Unity Government unstable, demands Parliament dissolution

Malaysia

Negeri Sembilan MB reaffirms loyalty to Tuanku Muhriz amid throne dispute

Malaysia

Penang CM defends move by housing board, says enforcement is last resort

By Ian McIntyre

Malaysia

API readings in Serian improve, Kuching, Sri Aman now in very unhealthy level

Malaysia

HSA warns against interference in sexual harassment probe