Malaysia

Normal for navies to hold launch ceremonies for incomplete ships: ex-admiral

Former RMN chief Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin says UAE has had similar events

Updated 4 years ago · Published on 10 Aug 2022 4:16PM

Normal for navies to hold launch ceremonies for incomplete ships: ex-admiral
Former Royal Malaysian Navy chief Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin says the littoral combat ship in the 2017 ceremony that has gone viral is not a dummy, but was under construction at the time. – Bernama pic, August 01, 2022

KUALA LUMPUR – It is not uncommon for navies around the world to hold launching ceremonies for warships prior to the completion of their construction, said former Royal Malaysian Navy chief Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin.

In a statement today, Kamarulzaman said he is compelled to clarify misconceptions over the launching ceremony of the first of six littoral combat ships (LCS) at Lumut Naval Yard in 2017, which has been making the rounds on social media after courting controversy recently.

He also stressed that ship launching and naming ceremonies taking place before a vessel was fully operational was a tradition practised by the Royal Malaysian Navy.

Kamarulzaman then said a similar ceremony was organised by the navy from the United Arab Emirates for an incomplete LCS ship that was built by French shipbuilder Naval Group, which was formerly known as DCNS.

“The supposed allegations that the LCS launching ceremony in 2017 in Lumut was done to lie to the public and confuse them is simply not true.

“In fact, I have to inform the public that the LCS1 (first ship) in the ceremony is authentic and not a dummy, and remains under construction (at the time). This includes the mast which was touted to be fake,” he said, adding that the navy’s reputation must be protected.

Kamarulzaman, who was the navy admiral at the time, was also present at the launching ceremony in question.

His statement comes after pictures of the ceremony were shared on social media, with several parties claiming that the ceremony manipulated the public into believing that the ship had been completed.

The launching ceremony was also mentioned in the recent Public Accounts Committee report, in which its chairman, Wong Kah Woh, revealed that the construction of the ship was 44% completed at the time of the event in 2017.

In previous media reports, Wong also noted that LC1’s mast during the launch was merely a decorative feature and not the real item, and had cost RM400,000 to construct. – The Vibes, August 10, 2022

Related News

Malaysia / 1mth

MPs propose government set up RCI to investigate LCS project delays

Malaysia / 1mth

LCS delays revive questions over warnings raised by former navy chief

Malaysia / 1mth

LCS project delayed by 7.55 per cent; Guan Eng again questions Zahid's role

Malaysia / 4mth

Don't repeat old mistakes, five ships must be completed according to cost and schedule – PAC

Malaysia / 1y

Malaysia receives UAV, rescue boats; Hails strong defence ties with Japan

Malaysia / 2y

Over RM300 million navy wastage, reveals AG’s report

Spotlight

Opinion

Can Najib break Madani?

World

Trump offers UFC CEO the position of Press Secretary

Malaysia

Building a great nation begins with happy families, says Anwar

Malaysia

Anwar should sack BN ministers who are not aligned with him – Muhyiddin

Malaysia

AGC rejects claims of defying King’s decree on Najib

Malaysia

Deepavali: Selangor Sultan calls on Malaysians to strengthen unity, reject hatred

Malaysia

If there were still obstacles, why accept the RM50m payment, asks Najib’s daughter

Malaysia

Where did UMNO's RM50 million payment for Najib's release come from?

By The Vibes Says

You may be interested

Malaysia

PM announces additional aid of RM2,500 for each flood victim in Selangor

Malaysia

Mujahid: Corruption must be rejected, even when committed by our own

By Alfian Z.M. Tahir

Malaysia

Malaysia considers fast-tracking quantum migration to strengthen national data security

Malaysia

Home Minister: Prisons Dept risks unlawful detention without clarity on Najib’s house arrest

Malaysia

Melaka state election battle hinges on urban strongholds

Malaysia

Northeast Monsoon: MOH prepared and on standby

Malaysia

Najib house arrest order: AG acknowledges glaring errors as questions mount

Malaysia

Anwar hails RM203b Softbank-led AI investment as vote of confidence in Malaysia