Malaysia

Melaka authorities commit to preserving Unesco heritage buildings

Clock tower building at Dataran Stadthuys being repainted for about RM100,000, says mayor

Updated 4 years ago · Published on 15 Aug 2022 12:28PM

Melaka authorities commit to preserving Unesco heritage buildings
MBMB Mayor Datuk Zainal Abu says the repainting of the over 100-year-old iconic red clock tower was expected to take two to three months to complete as it involved several technical requirements that need to be followed. – The Vibes file pic, August 15, 2022

MELAKA – Efforts are continuously being carried out by the Melaka Historic City Council (MBMB) to preserve heritage buildings in the state, especially in the United Nations Educational, Scientific and Cultural Organisation (Unesco) World Heritage Site.

MBMB Mayor Datuk Zainal Abu said this demonstrated the local authority’s commitment to protect the site.

He said conservation works on the buildings were done according to the set procedure so as not to affect the heritage site.

“The conservation efforts of the heritage buildings or monuments are very important to maintain Melaka’s status as a Unesco World Heritage City, awarded 14 years ago.

“The efforts are in line with the MBMB Local Plan 2035 which involves quality infrastructure management and facilities,” he told reporters after the Melaka Heritage Parade in conjunction with the 14th anniversary of Melaka’s inscription as a Unesco World Heritage Site in Banda Hilir, here, last night.

The event was officiated by Melaka’s Yang di-Pertua Negeri Tun Mohd Ali Rustam. Also present was state secretary Datuk Zaidi Johari.

Elaborating, Zainal said one of the conservation efforts being carried out was the repainting of the clock tower building at Dataran Stadthuys involving an allocation of about RM100,000.

He said the repainting of the over 100-year-old iconic red clock tower was expected to take two to three months to complete as it involved several technical requirements that need to be followed.

“We are also carrying out conservation works on the Melaka Museum Corporation buildings, most of which are hundreds of years old,” he said. – Bernama, August 15, 2022

Related News

Malaysia / 4h

12,531 to cast early ballots as Melaka election enters crucial stretch

Malaysia / 1d

Ab Rauf looks to young voters to shore up BN’s Melaka election bid

Malaysia / 3d

Bersatu takes swipe at PAS over two-seat contest in Melaka polls

Malaysia / 4d

Melaka polls: Calm campaign puts focus on what parties can offer voters

Malaysia / 6d

PH-Bersatu rivalry puts political understanding to test in Melaka polls

Malaysia / 1w

Melaka polls: Voter loyalty, candidate appeal to shape three-way contest

Spotlight

Opinion

Can Najib break Madani?

World

Trump offers UFC CEO the position of Press Secretary

Malaysia

Building a great nation begins with happy families, says Anwar

Malaysia

Anwar should sack BN ministers who are not aligned with him – Muhyiddin

Malaysia

AGC rejects claims of defying King’s decree on Najib

Malaysia

Deepavali: Selangor Sultan calls on Malaysians to strengthen unity, reject hatred

Malaysia

If there were still obstacles, why accept the RM50m payment, asks Najib’s daughter

Malaysia

Where did UMNO's RM50 million payment for Najib's release come from?

By The Vibes Says

You may be interested

Malaysia

Three Malaysians arrested in Mauritius over 76kg cannabis seizure worth RM9.87 million

Malaysia

Ab Rauf looks to young voters to shore up BN’s Melaka election bid

By Alfian Z.M. Tahir

Malaysia

Najib house arrest order: AG acknowledges glaring errors as questions mount

Malaysia

Woman jailed three months, fined RM5k for concealing birth, disposing baby's body

Malaysia

Home Minister: Prisons Dept risks unlawful detention without clarity on Najib’s house arrest

Malaysia

PH intensifies voter outreach in 15 Melaka seats as polling day nears

Malaysia

Man dies after suspected fall from 23rd floor of Penang hotel

By Ian McIntyre

Malaysia

The question remains: Who paid Najib's RM50m fine?