Malaysia

PBAPP plans to convert expanded Mengkuang dam into one for daily use

Reduction of raw water risks behind move, says CEO

Updated 4 years ago · Published on 07 Oct 2022 4:49PM

PBAPP plans to convert expanded Mengkuang dam into one for daily use
Datuk Seri Jaseni Maidinsa says the main objective of the conversion was to mitigate the risk of unscheduled water supply disruption throughout the state when the high turbidity of raw water from Sg Muda, Kedah threatens the operation of the Sg Dua Water Treatment Plant. – Bernama pic, October 7, 2022

GEORGE TOWN – The Penang Water Supply Corporation (PBAPP) plans to convert the expanded Mengkuang dam (EMD) in Bukit Mertajam near here from a drought reserve to a dam for daily use to reduce Penang’s raw water risks.

Its chief executive officer Datuk Seri Jaseni Maidinsa said the main objective of the conversion was to mitigate the risk of unscheduled water supply disruption throughout the state when the high turbidity of raw water from Sg Muda, Kedah threatens the operation of the Sg Dua water treatment plant (LRA).

“Basically, this means that raw water stored in EMD will be available for daily and emergency production when the water level of Sg Muda runs low during the dry season or when the quality of Sg Muda water is affected and cannot be treated.

“With the change, EMD will function just like the Air Itam and Teluk Bahang dams on the island.

“In addition, the move is also to treat water from EMD on a daily basis to cater to the increase in demand in Seberang Prai Utara and Seberang Prai Tengah,” he told a press conference here today. 

However, Jaseni said to convert the EMD into a dam for daily use, it required the operation of four major water supply engineering projects, namely Phase 2B of the Mengkuang Dam Expansion Project (MDEP), involving a cost of RM120 million by the federal government and which is expected to complete in March next year.

Subsequently, Phase 2C of MDEP which is the construction of the Lahar Yooi Pump House is needed to enable rapid refilling of EMD from raw water sources, which will be carried out by the federal government involving a cost of RM80 million and the construction of a new LRA costing RM180 million.

“The Mengkuang dam LRA is scheduled to be operational by December 2025, by which time PBAPP will be able to ‘free up’ and channel additional treated water from the Sg Dua LRA to Seberang Prai Selatan (SPS),” he said.

He said PBAPP was also planning to build another new 114 JLH LRA near Sg Kerian to be operational by December 2026 to address the problem of water supply in SPS. – Bernama, October 7, 2022

Related News

Events / 1mth

Sungai Dua WTP recognised by MBR for  water recovery, environmental sustainability achievements

Malaysia / 6mth

PBAPP seeks federal intervention to avert water crisis in Penang, Kedah

Malaysia / 6mth

PBAPP: Penang piped water supply stable for now

Malaysia / 2y

Penang Water Supply Corporation caves to pressure, offers relief to consumers

Malaysia / 2y

PBAPP issues urgent call to save water

Malaysia / 2y

Cloud seeding fails to generate rainfall over Penang, consumers appealed to conserve water

Spotlight

Opinion

Can Najib break Madani?

World

Trump offers UFC CEO the position of Press Secretary

Malaysia

Building a great nation begins with happy families, says Anwar

Malaysia

Anwar should sack BN ministers who are not aligned with him – Muhyiddin

Malaysia

AGC rejects claims of defying King’s decree on Najib

Malaysia

Deepavali: Selangor Sultan calls on Malaysians to strengthen unity, reject hatred

Malaysia

If there were still obstacles, why accept the RM50m payment, asks Najib’s daughter

Malaysia

Where did UMNO's RM50 million payment for Najib's release come from?

By The Vibes Says

You may be interested

Malaysia

PH Melaka seeks early voter support for federal government's policy direction

Malaysia

Most Malaysian motorists lack flood cover despite rising disaster losses

By Alfian Z.M. Tahir

Malaysia

Ab Rauf looks to young voters to shore up BN’s Melaka election bid

By Alfian Z.M. Tahir

Malaysia

Northeast Monsoon: MOH prepared and on standby

Malaysia

Health Ministry probes food poisoning complaints involving Gardenia bread and Twiggies

Malaysia

Three Malaysians arrested in Mauritius over 76kg cannabis seizure worth RM9.87 million

Malaysia

PH intensifies voter outreach in 15 Melaka seats as polling day nears

Malaysia

Armed man chasing car in viral Kuala Lumpur video was police officer, say cops