Malaysia

Langat 2 Water Treatment Plant sets seven national records

Malaysia’s second-largest water treatment facility officially opens, recording seven Malaysia Book of Records titles and pioneering a sustainable waste management system

Updated 1 year ago · Published on 20 Aug 2025 5:01PM

Langat 2 Water Treatment Plant sets seven national records
Water treatment plant introduces Malaysia’s First Green Conveyor System - August 20, 2025

THE Langat 2 Water Treatment Plant (WTP), now Malaysia’s second-largest water treatment facility, was officially launched today by the Prime Minister, Datuk Seri Anwar Ibrahim.

The high-impact infrastructure project not only delivers clean water to key regions but also sets a new benchmark in environmental engineering with the introduction of the country’s first green conveyor waste disposal system.

The RM4.2 billion project, led by Pengurusan Aset Air Berhad (PAAB) for Air Selangor, was developed through strategic collaboration between the Federal Government, the Selangor State Government, Air Selangor, and the Ministry of Energy Transition and Water Transformation (PETRA).

Langat 2 forms a core part of the Pahang–Selangor Raw Water Transfer Scheme, designed to ensure a stable and high-quality water supply to Selangor, Kuala Lumpur, and Putrajaya.

Fully operational with a treatment capacity of 1,130 million litres per day (MLD), the plant directly benefits approximately 791,000 user accounts across the Klang Valley.

The Langat 2 WTP also marked its place in the Malaysia Book of Records (MBOR) with seven national achievements:

In 2024, the facility was recognised for the Longest Dual-Function Treated Water Tunnel and the Longest Parallel Twin-Pipe Treated Water Tunnel in Malaysia.

In 2025, it received five additional records for introducing Malaysia’s First Water Treatment Waste Conveyor System, Longest Water Treatment Waste Conveyor System (1.918 km), and Longest Shaftless Screw Conveyor System (46 metres).

Handling up to 400 tonnes of treatment waste daily, the plant's automated conveyor system transports the processed waste nearly two kilometres to the Bukit Enggang balancing pond disposal site.

This innovation significantly reduces road traffic safety risks and lowers carbon emissions.

In his speech, Anwar praised the project's innovation and its alignment with national sustainability goals. PETRA, under the leadership of Deputy Prime Minister and Minister Daruk Seri Fadillah Yusof, is now focusing on the planning of Langat 2 Phase 2, which will add another 760 MLD capacity at an estimated cost of RM3.669 billion.

The second phase is expected to be completed by 2030 to meet growing water demand driven by population and industrial epansion.

“PETRA remains committed to accelerating water infrastructure development through strategic collaboration between federal and state governments, PAAB, and operators,” said a ministry spokesperson.

“This aligns with the MADANI Malaysia aspiration for inclusive and sustainable resource management, ensuring safe and high-quality water for the people and supporting the nation’s socioeconomic progress.” - August 20, 2025

Spotlight

Malaysia

Long Lellang helicopter crash: Remains of 5 victims to be returned to families today

Malaysia

UMNO-PAS relations. Are things as rosy as it seems?

Malaysia

‘The bridge has been burned’: UMNO-PH ties face growing strain as attacks turn increasingly open

By Alfian Z.M. Tahir

Malaysia

20 years ago, woman bought gold bangle for RM2k, now sold for RM18k

World

Nepal flood survivor rescued after 10 days trapped in hydropower tunnel

Malaysia

Anwar, Putin agree on mechanism to fast-track Malaysia-Russia deals

Malaysia

Selangor declares Oct 25 public holiday for Sultan’s Silver Jubilee

Malaysia

Najib’s pardon application deferred

By Alfian Z.M. Tahir

World

Magnitude 4.1 tremor hits southern Lebanon after Israeli blasts target Hezbollah tunnels

Education

UiTM probes alleged sale of hostel room placements at Puncak Alam

By Alfian Z.M. Tahir

You may be interested

Malaysia

Automotive industry calls for Budget 2027 measures to drive EV growth, investment

Malaysia

Haze: Sarawak accounts for 11 of 15 unhealthy air quality areas

Malaysia

Anwar chairs MA63 council meeting in Sabah to review implementation progress

Malaysia

Anwar tells PKR Sabah to close ranks, gear up for next GE

Malaysia

Anwar, Putin agree on mechanism to fast-track Malaysia-Russia deals

Malaysia

Man held over mother’s death in Tambunan

Malaysia

‘The bridge has been burned’: UMNO-PH ties face growing strain as attacks turn increasingly open

By Alfian Z.M. Tahir

Malaysia

Sarawak haze persists despite nationwide improvement