Malaysia

Langat 2 Water Treatment Plant sets seven national records

Malaysia’s second-largest water treatment facility officially opens, recording seven Malaysia Book of Records titles and pioneering a sustainable waste management system

Updated 11 months ago · Published on 20 Aug 2025 5:01PM

Langat 2 Water Treatment Plant sets seven national records
Water treatment plant introduces Malaysia’s First Green Conveyor System - August 20, 2025

THE Langat 2 Water Treatment Plant (WTP), now Malaysia’s second-largest water treatment facility, was officially launched today by the Prime Minister, Datuk Seri Anwar Ibrahim.

The high-impact infrastructure project not only delivers clean water to key regions but also sets a new benchmark in environmental engineering with the introduction of the country’s first green conveyor waste disposal system.

The RM4.2 billion project, led by Pengurusan Aset Air Berhad (PAAB) for Air Selangor, was developed through strategic collaboration between the Federal Government, the Selangor State Government, Air Selangor, and the Ministry of Energy Transition and Water Transformation (PETRA).

Langat 2 forms a core part of the Pahang–Selangor Raw Water Transfer Scheme, designed to ensure a stable and high-quality water supply to Selangor, Kuala Lumpur, and Putrajaya.

Fully operational with a treatment capacity of 1,130 million litres per day (MLD), the plant directly benefits approximately 791,000 user accounts across the Klang Valley.

The Langat 2 WTP also marked its place in the Malaysia Book of Records (MBOR) with seven national achievements:

In 2024, the facility was recognised for the Longest Dual-Function Treated Water Tunnel and the Longest Parallel Twin-Pipe Treated Water Tunnel in Malaysia.

In 2025, it received five additional records for introducing Malaysia’s First Water Treatment Waste Conveyor System, Longest Water Treatment Waste Conveyor System (1.918 km), and Longest Shaftless Screw Conveyor System (46 metres).

Handling up to 400 tonnes of treatment waste daily, the plant's automated conveyor system transports the processed waste nearly two kilometres to the Bukit Enggang balancing pond disposal site.

This innovation significantly reduces road traffic safety risks and lowers carbon emissions.

In his speech, Anwar praised the project's innovation and its alignment with national sustainability goals. PETRA, under the leadership of Deputy Prime Minister and Minister Daruk Seri Fadillah Yusof, is now focusing on the planning of Langat 2 Phase 2, which will add another 760 MLD capacity at an estimated cost of RM3.669 billion.

The second phase is expected to be completed by 2030 to meet growing water demand driven by population and industrial epansion.

“PETRA remains committed to accelerating water infrastructure development through strategic collaboration between federal and state governments, PAAB, and operators,” said a ministry spokesperson.

“This aligns with the MADANI Malaysia aspiration for inclusive and sustainable resource management, ensuring safe and high-quality water for the people and supporting the nation’s socioeconomic progress.” - August 20, 2025

Spotlight

Malaysia

Anwar, Zahid project unity at Putrajaya amid PH-BN differences during state polls

By Alfian Z.M. Tahir

Malaysia

Police looking for two robbery suspects who kicked elderly woman (video)

Malaysia

Malaysia will not bow to US congressional pressure over Israeli nationals’ issue - Loke (UPDATED)

Malaysia

Deaf e-hailing driver sues government, police over alleged assault, seeks disability access reforms

By Alfian Z.M. Tahir

Malaysia

Johor appoints 10 deputy exco to strengthen administration

Malaysia

Suspended police corporal charged with sexual assault of 11-year-old daughter

Malaysia

Magnitude 5.7 earthquake off northern Sumatra felt across west coast of Peninsular Malaysia

World

Trump approves potential US-Saudi nuclear deal allowing uranium enrichment capability

Malaysia

Network School moves to Kazakhstan

You may be interested

Malaysia

Online gambling syndicate with daily turnover of about RM27 million busted

Malaysia

Good governance and political stability are essential for national prosperity, says Perak Ruler

Malaysia

Telco identifies suspect in data breach as MCMC demands full report

Malaysia

Tuition teacher sentenced to 105 years in prison and 70 lashes for raping daughter

Malaysia

PH pledges 30,000 high-paying jobs, 20,000 affordable homes in Negeri manifesto

Malaysia

Teen 'transporter' arrested as police seize RM3.04 million in Johor meth crack down

Malaysia

AI Governance Bill to be tabled in Parliament after ministry, agency consultations

Malaysia

High Court to decide prosecution appeal in Papagomo sedition acquittal on July 31